Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹85.5 LAdmitted-Finance | -19.99% | ₹85.5 L | L1 | Admitted-Finance |
| 2 | L2₹89.2 LAdmitted-Finance | -16.60% | ₹89.2 L | L2 | Admitted-Finance |
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
7 May 2026, 3:00 pmClosed
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Supply of equipment, manpower and transport etc. on hire to DDA for demolition programme whenever required by LM/SWZ, LM/WZ and divisions under Dwarka Civil Circle-1, DDA, Dwarka Zone
2026_DDA_907196_1
04/EE/DMD-II/DDA/2026-27
Open Tender
Civil Works
365 days
EE DMD-2 DDA OFFICE CENTRAL NURSERY SEC-5 DWARKA
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹2.1 L
26 May 2026
2 May 2026
8 May 2026
2 May 2026
7 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of equipment, manpower and transport etc. on hire to DDA for demolition programme whenever required in DCC-1 under Dwarka Zone. Hire charges includes cost of service of operating staff, cost of lubericating oil, diesel/petrol, kerosene oil, other consumable for running the plant and machinery and all the taxes. The hire charges of plant and machinery on per day basis are for single shift of eight hours. The all labours shall be in proper uniform. | |||||
| 1.01 | TATA 407 or equivalent for local shifting | 288 | Per day | 2,124.4 | ₹6,11,827.2 |
| 1.02 | Diesel Truck 9.0 Tonne | 144 | Per day | 3,083.8 | ₹4,44,067.2 |
| 1.03 | Gas cutter with operator and Cylinder | 60 | Per day | 3,000 | ₹1,80,000 |
| 1.04 | Pneumatic hammer with operator and power etc. | 60 | Per day | 2,467 | ₹1,48,020 |
| 1.05 | Poclain with Driver and Fuel | 24 | Per day | 39,000 | ₹9,36,000 |
| 1.06 | JCB/Hydraulic excavator (3D) with driver and fuel. | 450 | Per day | 10,759 | ₹48,41,550 |
| 1.07 | JCB with Concrete breaker with driver and fuel | 144 | Per day | 10,500 | ₹15,12,000 |
| 1.08 | Labour with Hammer | 720 | Per day | 1,022.45 | ₹7,36,164 |
| 1.09 | Labour without Hammer | 1,008 | Per day | 1,008.75 | ₹10,16,820 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_953533.xls
BOQ • 0.30 MB
nit04.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid