Tender Value
₹3.7 Cr
EMD Value
₹7.3 L
Closing Date
5 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER
16 conditions · 5 needing a document upload
As per IRSGCC (latest)
The tenderer should have valid Electrical Contractors License Grade "A" / 33 kV or above issued by Govt. Electrical License Board (OR) the Site Supervisor should possess necessary "A" Grade / 33 kV or above License issued by a Government Licensing Authority to carryout works of appropriate voltage. The license should have been issued on a date prior to date of tender opening. A copy of valid license shall be submitted with the offer. Offer without valid license shall be summarily rejected.
Similar nature of work for OHE works (Vide Headquarters letter No. E.252/Tr.D/Policy/VII dt.04.09.2025 ): "Erection, testing and commissioning of 25 kV Overhead Electric Equipment in Railways (OR) Construction and commissioning of transmission line of 66 kV or above voltage of requisite value as per the technical eligibility criteria. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of transmission line work produced to satisfy technical eligibility criteria (OR) Provision or modification to substations/ switching stations/switch gear equipment,control and protection equipment, reactors, power factor correction equipment, transformers or any other power equipment in 25 kV Railway Substations/Switching stations or any work pertaining to 66 kV and above Electrical sub-station of any PSU/Govt. agencies. In addition, tenderer shall also have experience of having energized 25 kV OHE work of atleast 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of above Substations/Switching stations work produced to satisfy technical eligibility criteria"
Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. Please submit a certificate in theprescribed format Annexure V(A) (please download the format from the link given below). Non submission of the certificate, or submission ofcertificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer.
33 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Senior Divisional Electrical Engineer/Traction Distribution/ Secunderabad Division/ South Central Railway / Secunderabad - 500025. In submitting the tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the Indian Railways Standard General Conditions of Contract including all corrections and Amendments issued upto date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Senior Divisional Electrical Engineer/Traction Distribution/ Secunderabad Division/ South Central Railway/ Secunderabad - 500025. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.
Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
CORRIGENDUM NOTICE ON IREPS: [I] Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III] To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders.
E-Tender shall be rejected if it is not accompanied by the prescribed: [1] Cost of tender document [2] EMD [3] Certificate(s) in support of technical eligibility criteria [4] Certificate(s) in support of financial eligibility criteria [5] Copy of documents in support of Proprietary concern/ Partnership firm / Pvt.Ltd.company / Limited Company / JV firm / Valid MOU for JV firms as detailed in COMMERCIAL COMPLIANCE.
The bidders/tenderers should ensure that they are GST compliant. Quoted rates are inclusive of applicable GST as per GST ACT -2017 amended from time to time and as detailed in Special Conditions - General (under TAXES clause).
The tenderer[s] may also upload the following documents alongwith his/their tender: The tenderer may upload method statement, which shall contain organizational set up and working systems to be adopted by the successful tenderers during the operation of the contract. It shall contain the details of man power and machineries in the prescribed format and details of methodology for planning, execution, monitoring and completion of the project. The methodology so adopted shall suit to the nature of work and shall also comply fully with best practice and current regulations. A comprehensive detailing for each activity like setting-up organization, safety plan, execution plan, quality assurance plan, sequence of work to achieve the mile stones, ensure targeted progress and quality and inturn deployment of resources, risk analysis and its mitigation strategy shall be given communication arrangement within his organization and with the railways for decisions, progress or any other matter connected with this project to ensure full information about the project including progress of work at different time scale shall also be furnished.
Tenderer shall adhere to the time frame as mentioned in mile stone chart prescribed in the tender.
Tenderer shall engage the personnel with requisite qualification as per Special Conditions of Contract.
Tenderer shall deploy adequate number of plant and equipment for the execution of subject contract works to achieve progress as per mile stone chart.
List of works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given.
List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
Supportive documents/certificates from the organizations with whom they worked/are working as list of works completed and list of works on hand should be enclosed
I/ We have visited the works site and I / We am / are aware of the site conditions.
[1] I/We have read the various conditions of the tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for the period mentioned in the tender document [NIT HEADER] from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money Deposit submitted. [2] I/We offer to do the work at the percentage rates quoted by me/us in the attached schedule and bind myself/ourselves to complete the work within the period of completion given in this tender document [NIT HEADER] from the date of issue of letter of acceptance of this tender. I/We also hereby agree to abide by the IRS GCC and Special Conditions of contract in carryingout the works laid down by South Central Railway for the present contract. [3] The full value of the earnest money paid shall stand forfeited without prejudice to any other rights or remedies of the railway if [a]I/We do not execute the contract document within seven days after receipt of notice issued by the Railway that such documents are ready: OR [b] I/We do not commence the work within fifteen days after receipt of orders to that effect. [4] Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format within the time limit as prescribed in GCC (as amended from time to time) from the date of issue of Letter of Acceptance, we are aware that the contract shall be terminated duly forfeiting EMD and other dues, if any payable against the contract. Also, I/We shall be debarred from participating in the retender for the work.
I/We understand that no post-tender correspondence will be entertained, however, if any clarification is required by the Railway, the same will be sought from the tenderer. Also, I/We are aware that any Certificate/ Documents offered after the tender opening shall not be given any credit and shall not be considered.
I/we do hereby solemnly affirm and state on behalf of the tenderer including its constituents as under:
[i] I/We the tenderer(s) am/are signing this document after carefully reading the contents. [ii] I/We declare and certify that I/We have not made any misleading or false representation in the documents, forms, statements attached in proof of the qualification requirements. [iii] I/We also understand that my/our offer will be evaluated based on the documents/credentials uploaded alongwith the offer and the same shall be binding upon me/us. [iv] I/We declare that the information and the documents attached alongwith the tender by me/us are correct and I/We are fully responsible for the correctness of the information and the documents submitted by us.
[i] I/We do hereby undertake that, if any of the certificates regarding eligibility criteria submitted by us are found to be forged/false/incorrect at any time during the process of evaluation of the tenders, it shall lead to forfeiture of the tender EMD. Further, I/We and all my/our constituents understand that my/our offer shall be summarily rejected. [ii] I/We also understand that, if the certificates submitted by us are found to be false/forged/ incorrect at any time after the award of the contract, it will lead to termination of the contract besides suspending of business for 5 years, with the tenderer and with all the partners in case of partnership firm and with all the members of a JV in case of a Joint Venture, forfeiture of EMD/SD and Performance Guarantee and any other action provided in the contract.
It is certified that I/We have not been blacklisted or debarred by railways or any other ministry/ department/public sector undertaking of the government of India/State Government from participation in tenders/contract on the date of tender opening of bids, either in individual capacity or as a member of JV firm in which I/We were/are members.
I/We indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained.
SC div: Conversion of tramway type OHE to conventional type OHE in view of reliability improvements in KI-BPQ section.
C-E29-TRD-25-2026-27~SCR
C-E29-TRD-25-2026-27
Open
Works - General
12 Months
Hyderabad, Telangana
₹0
₹7.3 L
11 Sept 2026
11 Sept 2026
21 Sept 2026
284 items across 9 schedules · ₹3,66,94,677.2 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1(a)-Preparation of Design & Drawings for Overhead Equipment | — | — | — | — | |
| 1 | Supply & Erection | Per 12.00 Track KM | 20066.00 | — | 2,40,792 |
| 1(d)-Supply and Installation Traction Working Rule Diagram Boards | — | — | — | — | |
| 2 | Supply & Installation | Square 300.00 Foot | 1271.00 | — | 3,81,300 |
| 3(a)-Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. | — | — | — | — | |
| 3 | Erection/ Labour | MT 82.00 | 3465.00 | — | 2,84,130 |
| 4 | 32/3(a)-Extra Rate for Erection Under Power Block | MT 82.00 | 3465.00 | — | 2,84,130 |
| 3(b)-Erection of TTCs, Portals and Small Parts Steel (SPS) | — | — | — | — | |
| 5 | Erection/ Labour | MT 14.40 | 15267.00 | — | 2,19,844.8 |
| 6 | 32/3(b)-Extra Rate for Erection Under Power Block | MT 14.40 | 15267.00 | — | 2,19,844.8 |
| 3(e) -Supply and Erection of Guy Rod Assembly | — | — | — | — | |
| 7 | Supply/Material | Each 32.00 | 9331.00 | — | 2,98,592 |
| 8 | Erection/ Labour | Each 32.00 | 1120.00 | — | 35,840 |
| 9 | 32/3(e)-Extra Rate for Erection Under Power Block | Each 32.00 | 1120.00 | — | 35,840 |
| 4(a)(i)-Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE | — | — | — | — | |
| 10 | Supply/Material | Each 220.00 | 12114.00 | — | 26,65,080 |
| 11 | Erection/ Labour | Each 142.00 | 1080.00 | — | 1,53,360 |
| 12 | 32/4(a)(i)-Extra for Erection Under Power Block | Each 142.00 | 1080.00 | — | 1,53,360 |
| 4(a)(ii)-Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE | — | — | — | — | |
| 13 | Erection/ Labour | Each 36.00 | 1619.00 | — | 58,284 |
| 14 | 32/4(a)(ii)-Extra Rate for Erection Under Power Block | Each 36.00 | 1619.00 | — | 58,284 |
| 4(a)(iii)-Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE | — | — | — | — | |
| 15 | Erection/ Labour | Each 2.00 | 1859.00 | — | 3,718 |
| 16 | 32/4(a)(iii)-Extra Rate for Erection Under Power Block | Each 2.00 | 1859.00 | — | 3,718 |
| 6(a)-Supply and Erection Regulated Conventional OHE | — | — | — | — | |
| 17 | Supply/Material | Per 12.00 Track KM | 24271.00 | — | 2,91,252 |
| 18 | Erection/ Labour | Per 12.00 Track KM | 48362.00 | — | 5,80,344 |
| 19 | 32/6(a)-Extra Rate for Erection Under Power Block | Per 12.00 Track KM | 48362.00 | — | 5,80,344 |
| 7(c)-Erection of Large Span Wire (130 Sq. mm) | — | — | — | — | |
| 20 | Erection/ Labour | Metre 100.00 | 207.00 | — | 20,700 |
| 21 | 32/7(c)-Extra Rate for Erection Under Power Block | Metre 100.00 | 207.00 | — | 20,700 |
| 8(a)(v)-Supply and Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE | — | — | — | — | |
| 22 | Supply/Material | Each 14.00 | 70583.00 | — | 9,88,162 |
| 23 | Erection/ Labour | Each 14.00 | 4000.00 | — | 56,000 |
| 24 | 32/8(a)(v)-Extra Rate for Erection Under Power Block | Each 14.00 | 4000.00 | — | 56,000 |
| 8(a)(xii)-Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA locations. | — | — | — | — | |
| 25 | Erection/ Labour | Each 14.00 | 185.00 | — | 2,590 |
| 8(b)(i)-Supply (without Insulator) and Erection of materials for Termination single conductor of OHE or terminating wire | — | — | — | — | |
| 26 | Supply/Material | Each 2.00 | 4444.00 | — | 8,888 |
| 27 | Erection/ Labour | Each 2.00 | 956.00 | — | 1,912 |
| 28 | 32/8(b)(i)-Extra for Erection Under Power Block | Each 2.00 | 956.00 | — | 1,912 |
| 8(b)(ii)-Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE | — | — | — | — | |
| 29 | Supply/Material | Each 14.00 | 8201.00 | — | 1,14,814 |
| 30 | Erection/ Labour | Each 14.00 | 1120.00 | — | 15,680 |
| 31 | 32/8(b)(ii)-Extra Rate for Erection Under Power Block | Each 14.00 | 1120.00 | — | 15,680 |
| 9(a)-Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Conventional OHE | — | — | — | — | |
| 32 | Supply/Material | Each 10.00 | 22000.00 | — | 2,20,000 |
| 33 | Erection/ Labour | Each 10.00 | 3372.00 | — | 33,720 |
| 34 | 32/9(a)-Extra Rate for Erection Under Power Block | Each 10.00 | 3372.00 | — | 33,720 |
| 10(a)-Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, cross-over or over-lap | — | — | — | — | |
| 35 | Supply/Material | Each 4.00 | 5733.00 | — | 22,932 |
| 36 | Erection/ Labour | Each 4.00 | 1250.00 | — | 5,000 |
| 37 | 32/10(a)-Extra for Erection Under Power Block | Each 4.00 | 1250.00 | — | 5,000 |
| 11(a)(i)-Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. | — | — | — | — | |
| 38 | Supply/Material | Each 16.00 | 1859.00 | — | 29,744 |
| 39 | Erection/ Labour | Each 16.00 | 711.00 | — | 11,376 |
| 40 | 32/11(a)(i)-Extra Rate for Erection Under Power Block | Each 16.00 | 711.00 | — | 11,376 |
| 11(a)(ii)-Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. | — | — | — | — | |
| 41 | Supply/Material | Each 8.00 | 2022.00 | — | 16,176 |
| 42 | Erection/ Labour | Each 8.00 | 494.00 | — | 3,952 |
| 43 | 32/11(a)(ii)-Extra Rate for Erection Under Power Block | Each 8.00 | 494.00 | — | 3,952 |
| 11(b)-Supply (without Insulator) and Erection of 25 kV Post Insulator | — | — | — | — | |
| 44 | Supply/Material | Each 32.00 | 850.00 | — | 27,200 |
| 12(a)-Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional OHE | — | — | — | — | |
| 45 | Supply/Material | Each 2.00 | 51930.00 | — | 1,03,860 |
| 46 | Erection/ Labour | Each 2.00 | 3117.00 | — | 6,234 |
| 47 | 32/12(a)-Extra for Erection Under Power Block | Each 2.00 | 3117.00 | — | 6,234 |
| 12(c)-Erection Light Weight Section Insulator | — | — | — | — | |
| 48 | Erection/ Labour | Each 2.00 | 4300.00 | — | 8,600 |
| 49 | 32/12(c)-Extra for Erection Under Power Block | Each 2.00 | 4300.00 | — | 8,600 |
| 13(a)-Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact assembly | — | — | — | — | |
| 50 | Supply/Material | Each 2.00 | 40128.00 | — | 80,256 |
| 51 | Erection/ Labour | Each 2.00 | 2891.00 | — | 5,782 |
| 52 | 32/13(a)-Extra for Erection Under Power Block | Each 2.00 | 2891.00 | — | 5,782 |
| 13(b)-Supply (without Insulators) and Erection of 25 kV Double Pole Isolator without earth contact assembly. | — | — | — | — | |
| 53 | Supply/Material | Each 2.00 | 67227.00 | — | 1,34,454 |
| 54 | Erection/ Labour | Each 2.00 | 4188.00 | — | 8,376 |
| 55 | 32/13(b)-Extra for Erection Under Power Block | Each 2.00 | 4188.00 | — | 8,376 |
| 13(c)-Supply and Erection of Earth Contact Assembly for an Isolator | — | — | — | — | |
| 56 | Supply/Material | Each 2.00 | 13357.00 | — | 26,714 |
| 57 | Erection/ Labour | Each 2.00 | 412.00 | — | 824 |
| 13(d)-Supply and Erection of an Interlocking device | — | — | — | — | |
| 58 | Supply/Material | Each 2.00 | 4610.00 | — | 9,220 |
| 59 | Erection/ Labour | Each 2.00 | 294.00 | — | 588 |
| 15(a)-Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti- Theft Jumper) (excluding copper jumper supply) | — | — | — | — | |
| 60 | Supply/Material | Each 100.00 | 756.00 | — | 75,600 |
| 61 | Erection/ Labour | Each 100.00 | 356.00 | — | 35,600 |
| 62 | 32/15(a)-Extra for Erection Under Power Block | Each 100.00 | 356.00 | — | 35,600 |
| 15(b)-Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G- Jumper) (excluding copper jumper supply) | — | — | — | — | |
| 63 | Supply/Material | Each 12.00 | 2126.00 | — | 25,512 |
| 64 | Erection/ Labour | Each 12.00 | 680.00 | — | 8,160 |
| 65 | 32/15(b)-Extra for Erection Under Power Block | Each 12.00 | 680.00 | — | 8,160 |
| 16(a)-Supply and Erection of Structure Bond | — | — | — | — | |
| 66 | Supply/Material | Each 200.00 | 833.00 | — | 1,66,600 |
| 67 | Erection/ Labour | Each 200.00 | 304.00 | — | 60,800 |
| 16(b)-Supply and Erection of Longitudinal Bond | — | — | — | — | |
| 68 | Supply/Material | Each 24.00 | 604.00 | — | 14,496 |
| 69 | Erection/ Labour | Each 24.00 | 274.00 | — | 6,576 |
| 16(c)-Supply and Erection of Transverse & Special Bond | — | — | — | — | |
| 70 | Supply/Material | Each 24.00 | 951.00 | — | 22,824 |
| 71 | Erection/ Labour | Each 24.00 | 326.00 | — | 7,824 |
| 16(aa)-Drilling of Holes on Rails | — | — | — | — | |
| 72 | Erection/ Labour | Each 296.00 | 107.00 | — | 31,672 |
| 16(d)-Supply and Erection of Structure Bond on Platform Area | — | — | — | — | |
| 73 | Supply/Material | Each 12.00 | 1618.00 | — | 19,416 |
| 74 | Erection/ Labour | Each 12.00 | 2369.00 | — | 28,428 |
| 17(a)-Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. | — | — | — | — | |
| 75 | Supply/Material | Each 2.00 | 3511.00 | — | 7,022 |
| 76 | Erection/ Labour | Each 2.00 | 1347.00 | — | 2,694 |
| 26(a)(ii)-Supply and Erection of 18 mm Copper Bus Bar | — | — | — | — | |
| 77 | Supply/Material | Metre 60.00 | 2250.00 | — | 1,35,000 |
| 78 | Erection/Labour | Metre 60.00 | 146.00 | — | 8,760 |
| 79 | 32/26(a)(ii)-Extra Rate for Erection Under Power Block | Metre 60.00 | 146.00 | — | 8,760 |
| 26(c)(i)-Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Terminal (6310-1) | — | — | — | — | |
| 80 | Supply/Material | Each 40.00 | 1231.00 | — | 49,240 |
| 81 | Erection/Labour | Each 40.00 | 47.00 | — | 1,880 |
| 82 | 32/26(c)(i)-Extra Rate for Erection Under Power Block | Each 40.00 | 47.00 | — | 1,880 |
| 26(c)(ii)-Supply and Erection of Solid Copper Busbar Connector - 18 mm Bus Splice (6320) | — | — | — | — | |
| 83 | Supply/Material | Each 12.00 | 1416.00 | — | 16,992 |
| 84 | Erection/Labour | Each 12.00 | 47.00 | — | 564 |
| 85 | 32/26(c)(ii)-Extra Rate for Erection Under Power Block | Each 12.00 | 47.00 | — | 564 |
| 31(a) -Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support | — | — | — | — | |
| 86 | Erection/Labour | Each 12.00 | 1870.00 | — | 22,440 |
| 87 | 32/31(a)-Extra for Erection Under Power Block | Each 12.00 | 1870.00 | — | 22,440 |
| 31(b) -Provision of additional bracket assembly/assemblies on a mast or support | — | — | — | — | |
| 88 | Erection/Labour | Each 4.00 | 2316.00 | — | 9,264 |
| 89 | 32/31(b)-Extra for Erection Under Power Block | Each 4.00 | 2316.00 | — | 9,264 |
| 31(c) -Dismantling of Overhead Equipment | — | — | — | — | |
| 90 | Erection/Labour | Per 12.00 Track KM | 13957.00 | — | 1,67,484 |
| 91 | 32/31(c)-Extra for Erection Under Power Block | Per 12.00 Track KM | 13957.00 | — | 1,67,484 |
| 31(e) -Splicing and Extension of Anchored OHE | — | — | — | — | |
| 92 | Erection/Labour | Set 4.00 | 2558.00 | — | 10,232 |
| 93 | 32/31(e)-Extra for Erection Under Power Block | Set 4.00 | 2558.00 | — | 10,232 |
| 31(f) -Dismantling of Section Insulator | — | — | — | — | |
| 94 | Erection/Labour | Each 2.00 | 2622.00 | — | 5,244 |
| 95 | 32/31(f)-Extra Rate for Erection Under Power Block | Each 2.00 | 2622.00 | — | 5,244 |
| 31(g) -Slewing and Putting back of OHE in original position | — | — | — | — | |
| 96 | Erection/Labour | Each 16.00 Span | 2286.00 | — | 36,576 |
| 97 | 32/31(g)-Extra for Erection Under Power Block | Each 16.00 Span | 2286.00 | — | 36,576 |
| 31(h) -Dismantling of an Isolator | — | — | — | — | |
| 98 | Erection/Labour | Each 2.00 | 1780.00 | — | 3,560 |
| 99 | 32/31(h)-Extra for Erection Under Power Block | Each 2.00 | 1780.00 | — | 3,560 |
| 31(i) -Dismantling of Post Insulator | — | — | — | — | |
| 100 | Erection/Labour | Each 32.00 | 336.00 | — | 10,752 |
| 101 | 32/31(i)-Extra Rate for Erection Under Power Block | Each 32.00 | 336.00 | — | 10,752 |
| 31(j)(i) -Dismantling of Suspension Insulator | — | — | — | — | |
| 102 | Erection/Labour | Each 8.00 | 494.00 | — | 3,952 |
| 103 | 32/31(j)(i)-Extra Rate for Erection Under Power Block | Each 8.00 | 494.00 | — | 3,952 |
| 31(j)(ii) -Dismantling of Cut-in Insulator | — | — | — | — | |
| 104 | Erection/Labour | Each 16.00 | 589.00 | — | 9,424 |
| 105 | 32/31(j)(ii)-Extra Rate for Erection Under Power Block | Each 16.00 | 589.00 | — | 9,424 |
| 31(k)(i) -Dismantlement of OHE Mast or structure by cutting | — | — | — | — | |
| 106 | Erection/Labour | Each 200.00 | 3062.00 | — | 6,12,400 |
| 107 | 32/31(k)(i)-Extra Rate for Erection Under Power Block | Each 200.00 | 3062.00 | — | 6,12,400 |
| 31(k)(ii) -Dismantlement Upright TTC/Portal by cutting | — | — | — | — | |
| 108 | Erection/Labour | Each 2.00 | 4376.00 | — | 8,752 |
| 109 | 32/31(k)(ii)-Extra Rate for Erection Under Power Block | Each 2.00 | 4376.00 | — | 8,752 |
| 31(n) -Dismantling of Guy Rod | — | — | — | — | |
| 110 | Erection/Labour | Each 32.00 | 524.00 | — | 16,768 |
| 111 | 32/31(n)-Extra for Erection Under Power Block | Each 32.00 | 524.00 | — | 16,768 |
| 31(o) -Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever assembly is leftover | — | — | — | — | |
| 112 | Erection/Labour | Each 4.00 | 524.00 | — | 2,096 |
| 113 | 32/31(o)-Extra for Erection Under Power Block | Each 4.00 | 524.00 | — | 2,096 |
| 31(p)-Dismantling Drop Arms/Booms/ Temporary Masts | — | — | — | — | |
| 114 | Erection/Labour | MT 1.00 | 5359.00 | — | 5,359 |
| 115 | 32/31(p)-Extra for Erection Under Power Block | MT 1.00 | 5359.00 | — | 5,359 |
| 31(r) -Dismantling of Cantilever Assembly including Insulators | — | — | — | — | |
| 116 | Erection/Labour | Each 200.00 | 480.00 | — | 96,000 |
| 117 | 32/31(r)-Extra Rate for Erection Under Power Block | Each 200.00 | 480.00 | — | 96,000 |
| 31(s) -Dismantling of Fabricated Steel or Small Parts Steel (SPS) | — | — | — | — | |
| 118 | Erection/Labour | MT 3.20 | 709.00 | — | 2,268.8 |
| 119 | 32/31(s)-Extra for Erection Under Power Block | MT 3.20 | 709.00 | — | 2,268.8 |
| 31(t)(ii) -Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly for Tramway OHE | — | — | — | — | |
| 120 | Erection/Labour | Each 14.00 | 1874.00 | — | 26,236 |
| 121 | 32/31(t)(ii)-Extra Rate for Erection Under Power Block | Each 14.00 | 1874.00 | — | 26,236 |
| 31(t)(iii) -Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire | — | — | — | — | |
| 122 | Erection/Labour | Each 10.00 | 1480.00 | — | 14,800 |
| 123 | 32/31(t)(iii)-Extra Rate for Erection Under Power Block | Each 10.00 | 1480.00 | — | 14,800 |
| 31(t)(iv) -Dismantling of all types of Copper Jumpers | — | — | — | — | |
| 124 | Erection/Labour | Each 12.00 | 140.00 | — | 1,680 |
| 125 | 32/31(t)(iv)-Extra Rate for Erection Under Power Block | Each 12.00 | 140.00 | — | 1,680 |
| 31(t)(vi) -Dismantling of Termination for Tramway type Overhead Equipment | — | — | — | — | |
| 126 | Erection/Labour | Each 14.00 | 515.00 | — | 7,210 |
| 127 | 32/31(t)(vi)-Extra Rate for Erection Under Power Block | Each 14.00 | 515.00 | — | 7,210 |
| 31(t)(viii) -Transfer of Feeder Wire from one Mast or Support to another Mast or Support | — | — | — | — | |
| 128 | Erection/Labour | Each 2.00 | 2411.00 | — | 4,822 |
| 129 | 32/31(t)(viii)-Extra Rate for Erection Under Power Block | Each 2.00 | 2411.00 | — | 4,822 |
| 31(t)(ix) -Re-adjustment OHE Spans, including droppers | — | — | — | — | |
| 130 | Erection/Labour | Each 4.00 Span | 4376.00 | — | 17,504 |
| 131 | 32/31(t)(ix)-Extra Rate for Erection Under Power Block | Each 4.00 Span | 4376.00 | — | 17,504 |
| 31(t)(x) -Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond | — | — | — | — | |
| 132 | Erection/Labour | Each 250.00 | 145.00 | — | 36,250 |
| 34(f)-Exacavation of Earth, filling including compaction in all kinds of soil | — | — | — | — | |
| 133 | Erection/Labour | cum 60.00 | 298.00 | — | 17,880 |
| 34(j)-Providing and Laying Pitching with Stone Boulders | — | — | — | — | |
| 134 | Supply & Erection | cum 24.00 | 6659.00 | — | 1,59,816 |
| 36(a)-Unloading all types Steel Structures | — | — | — | — | |
| 135 | Erection/Labour | MT 100.00 | 140.00 | — | 14,000 |
| 36(b)-Loading of all types of Steel Structures | — | — | — | — | |
| 136 | Erection/Labour | MT 100.00 | 240.00 | — | 24,000 |
| 37(a)-Unloading of all types of Copper & Aluminium conductors | — | — | — | — | |
| 137 | Erection/Labour | MT 2.00 | 120.00 | — | 240 |
| 37(b)-Loading of all types of Copper & Aluminium conductors | — | — | — | — | |
| 138 | Erection/Labour | MT 2.00 | 120.00 | — | 240 |
| 38-Transportation of OHE structures / Materials / Equipments | — | — | — | — | |
| 139 | Transportation/Labour | MT-Km 2500.00 | 116.00 | — | 2,90,000 |
| 40(a)-Supply and Erection of Number Plate (Enamel Type) | — | — | — | — | |
| 140 | Supply/Material | Each 200.00 | 516.00 | — | 1,03,200 |
| 141 | Erection/Labour | Each 200.00 | 100.00 | — | 20,000 |
| 41(c)-Supply and Erection of Enamel type Staff Caution board | — | — | — | — | |
| 142 | Supply/Material | Each 8.00 | 1384.00 | — | 11,072 |
| 143 | Erection/Labour | Each 8.00 | 179.00 | — | 1,432 |
| 41(d)-Supply and Erection of Retro- Reflective Type Electric Engine Stop Board/Caution Unwired Turnout Board | — | — | — | — | |
| 144 | Supply/Material | Each 4.00 | 3410.00 | — | 13,640 |
| 145 | Erection/Labour | Each 4.00 | 179.00 | — | 716 |
| 41(e)-Supply and Erection of Retro- Reflective Type Power Block Working Limit Board | — | — | — | — | |
| 146 | Supply/Material | Each 8.00 | 1284.00 | — | 10,272 |
| 147 | Erection/Labour | Each 8.00 | 179.00 | — | 1,432 |
| 41(f)-Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board | — | — | — | — | |
| 148 | Supply/Material | Each 4.00 | 823.00 | — | 3,292 |
| 149 | Erection/Labour | Each 4.00 | 179.00 | — | 716 |
| 41(g)-Supply and Erection of Retro- Reflective type Danger Board for Height Gauge | — | — | — | — | |
| 150 | Supply/Material | Each 4.00 | 2562.00 | — | 10,248 |
| 151 | Erection/Labour | Each 4.00 | 179.00 | — | 716 |
| 41(h)-Supply and Erection of Vitreous Enameled 25 kV Danger Board with skull & bones for Overline Structure (OLS) and Auxiliary Transformer | — | — | — | — | |
| 152 | Supply/Material | Each 12.00 | 352.00 | — | 4,224 |
| 153 | Erection/Labour | Each 12.00 | 179.00 | — | 2,148 |
| 41(i)-Supply and Erection Enamel Protected Area Board | — | — | — | — | |
| 154 | Supply/Material | Each 6.00 | 1475.00 | — | 8,850 |
| 155 | Erection/Labour | Each 6.00 | 179.00 | — | 1,074 |
| 41(k)-Supply and Erection of Vitreous Enameled TSS/SP/SSP Name Board | — | — | — | — | |
| 156 | Supply/Material | Each 1.00 | 5588.00 | — | 5,588 |
| 157 | Erection/Labour | Each 1.00 | 179.00 | — | 179 |
| 41(l)-Supply and Erection of set of Isolator operation OPEN/CLOSE boards | — | — | — | — | |
| 158 | Supply/Material | Set 4.00 | 1540.00 | — | 6,160 |
| 159 | Erection/Labour | Set 4.00 | 179.00 | — | 716 |
| 42-Supply and Erection of Shock Treatment Chart | — | — | — | — | |
| 160 | Supply/Material | Each 2.00 | 2862.00 | — | 5,724 |
| 161 | Erection/Labour | Each 2.00 | 204.00 | — | 408 |
| 40(b)-Supply and Erection of Number Plate (Retro-Reflective Type) | — | — | — | — | |
| 162 | Supply/Material | Each 24.00 | 1049.00 | — | 25,176 |
| 163 | Erection/Labour | Each 24.00 | 149.00 | — | 3,576 |
| Schedule total | ₹1,24,42,400.2 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1IRSGCCAPR2022.pdf
ATTACHMENT
2GCCCorrectionSlips.pdf
ATTACHMENT
3Instructionsofthetenderer.pdf
ATTACHMENT
4Technicalspecificationandstandarddrawings.pdf Technical spec and drawings
ATTACHMENT
5SpecialconditionsofContract.pdf
ATTACHMENT
7StandardGeneralConditionsofcontract.pdf
ATTACHMENT
8ExplanatoryNotes.pdf
ATTACHMENT
Final6MasterTenderDocument11092026.pdf
ATTACHMENT
4Technicalspecificationandstandarddrawings.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .