Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹15,027.07 (0.06%)Admitted-Finance | ₹2.3 Cr+₹15,027.07 (0.06%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹15,555.71 (0.07%)Admitted-Finance | ₹2.3 Cr+₹15,555.71 (0.07%) | L3 | Admitted-Finance |
| 4 | L4₹2.3 Cr+₹17,611.27 (0.08%)Admitted-Finance | ₹2.3 Cr+₹17,611.27 (0.08%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹23,834.59 (0.10%)Admitted-Finance NO 2 MURAHARI STREET SARATHY NAGAR WEST JONES ROAD WEST SAIDAPET CHENNAI 600015 | CHENNAI | CHENNAI | TAMIL NADU | 600015 | ₹2.3 Cr+₹23,834.59 (0.10%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K K Rao Engineering Works Pvt Ltd L4 | Asia Power Electrical LLP L9 | SAP INDUSTRIES L7 | SHREE ABIRAMI ENGGINEERING WORKS L8 | HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED L6 | Ascott Electricals Pvt Ltd L5 | Tanvikrishna Transformers L2 | ABIRAMI ENGINEERING L1 | M/s K R K Power Pvt Ltd L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ABSTRACT | ||||||||||||
| 1.10 | Supply of materials & Labour Charges for 10 MVA Power Transformer | 1 | Nos. | 25,89,611.72 ₹25,89,611.72 | 25,92,251.26 ₹25,92,251.26 | 25,90,433 ₹25,90,433 | 25,90,433 ₹25,90,433 | 25,90,433 ₹25,90,433 | 25,90,433 ₹25,90,433 | 25,89,478.38 ₹25,89,478.38 | 25,87,212.66 ₹25,87,212.66 Lowest | 25,89,544.46 ₹25,89,544.46 |
| 1.20 | Supply of materials & Labour Charges for 16 MVA Power Transformer | 1 | Nos. | 27,85,503.52 ₹27,85,503.52 | 27,99,316.48 ₹27,99,316.48 | 27,86,541.92 ₹27,86,541.92 | 27,86,541.92 ₹27,86,541.92 | 27,86,541.92 ₹27,86,541.92 | 27,86,541.92 ₹27,86,541.92 | 27,85,143.62 ₹27,85,143.62 | 27,83,469.08 ₹27,83,469.08 Lowest | 27,85,209.7 ₹27,85,209.7 |
| 1.30 | Supply of materials & Labour Charges for 25 MVA Power Transformer | 1 | Nos. | 29,95,636.74 ₹29,95,636.74 | 30,01,538.98 ₹30,01,538.98 | 29,96,695.2 ₹29,96,695.2 | 29,96,695.2 ₹29,96,695.2 | 29,96,695.2 ₹29,96,695.2 | 29,96,695.2 ₹29,96,695.2 | 29,95,261.5 ₹29,95,261.5 | 29,93,496.1 ₹29,93,496.1 Lowest | 29,95,327.58 ₹29,95,327.58 |
| 1.40 | Supply of materials & Labour Charges for 50 MVA Power Transformer | 1 | Nos. | 32,95,230.48 ₹32,95,230.48 | 33,02,443.7 ₹33,02,443.7 | 32,96,309 ₹32,96,309 | 32,96,309 ₹32,96,309 | 32,96,309 ₹32,96,309 | 32,96,309 ₹32,96,309 | 32,94,806.86 ₹32,94,806.86 | 32,92,998.98 ₹32,92,998.98 Lowest | 32,94,872.94 ₹32,94,872.94 |
Tender Value
₹6 Cr
EMD Value
₹6 L
Closing Date
30 May 2022, 2:00 pmClosed
CE/TP-II/Trichy
Chief Enginee, Transmission Projects-II, Periyamilaguparai, Trichy-1
Repairing and reconditioning of 110 KV class sick power transformers of various capacities available within the jurisdiction of GCC/Madurai for a period of two years
2022_EB_230445_1
CE/TP-II/TRY/E-06/22-23
Open Tender
Electrical Works
Works
90 days
Madurai
As per tender specification
4 documents required · 4 mandatory
₹0
₹6 L
Yes
13 Jun 2022
26 Apr 2022
31 May 2022
26 Apr 2022
30 May 2022
26 Apr 2022
ABSTRACT
Supply of materials & Labour Charges for 10 MVA Power Transformer
Supply of materials & Labour Charges for 16 MVA Power Transformer
Supply of materials & Labour Charges for 25 MVA Power Transformer
Supply of materials & Labour Charges for 50 MVA Power Transformer
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
Ascott Electricals Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
SAP INDUSTRIES
Asia Power Electrical LLP
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
SAP INDUSTRIES
SHREE ABIRAMI ENGGINEERING WORKS
Ascott Electricals Pvt Ltd
Asia Power Electrical LLP
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Ascott Electricals Pvt Ltd
SAP INDUSTRIES
SHREE ABIRAMI ENGGINEERING WORKS
Asia Power Electrical LLP
K K Rao Engineering Works Pvt Ltd
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
Ascott Electricals Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
SAP INDUSTRIES
Asia Power Electrical LLP
M/s K R K Power Pvt Ltd
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Ascott Electricals Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
Asia Power Electrical LLP
M/s K R K Power Pvt Ltd
Tanvikrishna Transformers
K K Rao Engineering Works Pvt Ltd
Ascott Electricals Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
Asia Power Electrical LLP
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Asia Power Electrical LLP
Ascott Electricals Pvt Ltd
K K Rao Engineering Works Pvt Ltd
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Asia Power Electrical LLP
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
Ascott Electricals Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Asia Power Electrical LLP
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_271715.xls
BOQ • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .