| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPT |
| Sl No | Description | Qty | Unit | B KANAGARAJ L1 |
|---|---|---|---|---|
| 1.00 | Cleaning the Juncle using Mechanical JCB as per the Direction of the Departmental officers Etc., Complete | 8 | Hrs | 909 ₹7,272 Lowest |
| 2.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 21 | M3 | 203.25 ₹4,268.25 Lowest |
| 3.00 | Plain cement concrete 1:4:8 (One part of cement, four parts of sand and eight parts of stone jelly by volume) using of 40 mm_ thick granite hard broken stones, all machine mixed, laid to uniform thickness of 100mm and top left rought to receive floor finish including all labour charges for ‘concreting, ramming, curing etc, and providing expansion joints, slopes & grades if any etc., complete complying with relevant standard specifications at all leads & lifts inside the building. | 7 | M3 | 5,338 ₹37,366 Lowest |
| 4.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as Vertical RCC walls etc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 275 | M2 | 1,269 ₹3,48,975 Lowest |
| 5.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 50 | M3 | 8,761.5 ₹4,38,075 Lowest |
| 6.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification. | 10.5 | M | 88,709 ₹9,31,444.5 Lowest |
| 7.00 | Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental guage for premeasurement including labour charges for laying spreading leveling to camper etc., complete as per direction of departmental officers instruction. | 21.17 | M3 | 262.25 ₹5,551.83 Lowest |
| 8.00 | Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1.70m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75xS5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge | 100 | M | 6,500 ₹6,50,000 Lowest |
| 9.00 | Supply and fixing of 160mm dia PVC pipe 6Kg/cm2 with ISI make as per direction o departmental officers etc complete., | 30 | RM | 430.5 ₹12,915 Lowest |
| 10.00 | Removing hard rock by wedging, chiselling and trimming to proper shape where blasting is prohibited as per direction of departmental officers etc complete., | 15 | M3 | 1,190 ₹17,850 Lowest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
10 Jul 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Reconstruction of RCC retaining wall at Moorandamman Koil Ganesapuram Channel in Ward No 100 South Zone
2025_MAWS_574301_11
e38/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As per Tender Document
4 documents required · 4 mandatory
₹0
₹30,000
4 Nov 2025
28 Jun 2025
11 Jul 2025
28 Jun 2025
10 Jul 2025
28 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .