Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
| 2 | Admitted-Finance 1 367 SIVAN KOVIL STREET THONDAMATHURAI POST VEPPANTHATTAI TALUK PERAMBALUR DISTRICT | PERAMBALUR | TAMIL NADU | 621101 | Admitted-Finance |
Tender Value
₹77.8 L
EMD Value
₹78,000
Closing Date
5 Aug 2020, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households in Sannasinallur Village Panchayat in Sendurai Panchayat Union in Ariyalur District for the year 2020-21 in Package No TN 30-06
2020_RDTN_173253_1
2052/2020/A7,Dated.15.07.2020
Open Tender
Civil Works - Roads
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹78,000
DRDA, Ariyalur
21 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
5 Aug 2020
25 Jul 2020
27 Jul 2020
Amount
1.Providing 269 FHTC to Sannasinallur Habitation of Sannasinallur Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Provision for Name Board
2.Providing Pipeline (Distribution) to Sannasinallur Habitation of Sannasinallur Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Provision for Name Board
3.Providing Borewell, Construction of Pump Room and Providing Pumping Main line at Sannasinallur in Sannasinallur Panchayat
Providing Borewell
Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the Departmental Officers) including construction of mud pit.
0m to 60m depth
60m to 90m depth
90m to 120m depth
Reaming of 200mm Dia Borewell to 350mm Dia Borewell as directed at site
0m to 60m depth
60m to 90m depth
90m to 120m depth
Labour charges for inserting casing pipe supply & packing of pebbles (200mm)
Supply & delivery of 200mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 200mm Dia PVC Slotted Casing pipe as per IS 12818 / 2010
Charges for developing the borewell using air compressor in hours
Supply and Delivery of 7.5 HP Submersible Pumpset having Duty of 50 lpm x 175m head
Supply and Delivery of the 3 Phase panel board to suit 7.5 HP Submersible Pumpset
Supply and Delivery of 6.00sqm Copper cable for pumpset errection
Supply and Delivery of 63mm dia HDPE Pipe for pumpset errection
Labour charges for errection of Pump set upto 7.5HP
Costruction of Bore Pit arrangements
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Providing Pumping Mainline
Supply,delivery, laying and jointing of 90mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the Departmental Officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
90mm PVC Bend
90mm PVC Threaded coupler
Supply and delivery of GI pipes medium class as per IS.1239/part I/ 1990 to site of work with ISI Marking
80mm GI pipe
Supply and delivery of GI specials to site of work as per IS specification with ISI marking
80mm GI Elbow
80mm GI coupling
Laying and jointing of GI Pipes with GI specials and PVC specials etc
Provision of Water meter, Dirt Box and Erection charges for Pumping Main
Construction of Pump Room
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by the Departmental Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by the Departmental Officers
Brick work in CM 1:5 (one cement and five sand) using country bricks of size 8.75" X 4.25" X 2.00" including cost of all materials, labour charges, curing etc., complete and as directed by the Departmental Officers
For foundation and basement
For super structure
Reinforced cement concrete 1:1 /2:3 (one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by the Departmental Officers
Reinforced cement concrete 1:1 /2:3 (one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by the Departmental Officers
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak (country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5 (One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by the Departmental Officers
Special ceiling plastering for RCC Slab with C.M.1:3 (One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by the Departmental Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by the Departmental Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.60 x 0.45 m
Painting two coats of Surface with ready mixed Plastic enamel paint of first quality and of approved colour over a priming coat including thorough scrapping, clean removal of of dirt and including necessary all labour Charges etc., complete complying with standard specifications
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by the Departmental Officers
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete complying with standard specifications
Provision for writing emblem and Scheme details on the side wall of the Pump room
Provision of lock and key for pump room and OHT ladder
Provision for Name Board
4.Construction of 60000 Litre OHT at Sannasinallur Habitation of Sannsinallur Panchayat
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by the Departmental Officers
First depth of 2m From 0 to 2 m below GL
Second depth of 2m From 2m to 4 m below GL
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by the Departmental Officers
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the Departmental Officers
Reinforced cement concrete 1:1.5:3 (one cement, one and half sand and three hard granite broken stone of 20mm size ISS gauge) mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
From 1.50m to 4.50m Below GL
From 0m to 1.50m Below GL
0m to 4.50m above GL
4.50m to 7.32m above GL
7.32m to 10.98 m above GL
10.98m to 14.64 m above GL
14.64m to 18.3 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the Departmental Officers
Plane Surface - Below GL
From GL to 3.30m
Above 5.30m to 6.30m
Above 8.30m to 9.30m
Above 11.30m to 12.30m
Square Column - Below GL and upto 3.30m above GL
Above 3.30m to 4.30m
Above 4.30m to 5.30m
Above 5.30m to 6.30m
Above 6.30m to 7.30m
Above 7.30m to 8.30m
Above 8.30m to 9.30m
Above 9.30m to 10.30m
Above 10.30m to 11.30m
Above 11.30m to 12.30m
Curved Surface - 11.30m to 12.30m
Above 12.30m to 13.30m
Above 13.30m to 14.30m
Above 14.30m to 15.30m
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Painting two coats of Surface with ready mixed Plastic enamel paint of first quality and of approved colour over a priming coat including thorough scrapping, clean removal of of dirt and including necessary all labour Charges etc., complete complying with standard specifications
Fabrication, supply, delivery and fixing of MS Ladder of 45cm made out of 50 mm x 50mm x 6mm MS angle for sides and steps in 16mm MS Plain rods at 30 cm centre to centre as directed by the departmental officers
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by the departmental officers
Providing GI Pipe Ventilating arrangements mosquito proof nylon net with 110mm PVC Cowl and as directed by the departmental officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed by the departmental officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by the departmental officers
Painting Emblem on the SR with enamel paint and as directed by the departmental officers
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes, specials, valve, labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete
65mm GI pipes for inlet connection
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm dia GI bend (short)
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75mmx63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
63 mm PVC 6Ksc Pipe
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by the departmental officers
Providing Hand rails over the Standing Platform by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by the departmental officers
Provision for levelling the site
Provision for Name board
5.Providing 182 FHTC to Anganur Habitation of Sannasinallur Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
6.Providing Pipeline (Distribution) to Anganur Habitation of Sannasinallur Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
7.Providing Borewell, Construction of Pump Room and Providing Pumping Main line at Anganur in Sannasinallur Panchayat
Providing Borewell
Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the Departmental Officers) including construction of mud pit.
0m to 60m depth
60m to 90m depth
90m to 120m depth
Reaming of 200mm Dia Borewell to 350mm Dia Borewell as directed at site
0m to 60m depth
60m to 90m depth
90m to 120m depth
Labour charges for inserting casing pipe supply & packing of pebbles (200mm)
Supply & delivery of 200mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 200mm Dia PVC Slotted Casing pipe as per IS 12818 / 2010
Charges for developing the borewell using air compressor in hours
Supply and Delivery of 7.5 HP Submersible Pumpset having Duty of 50 lpm x 175m head
Supply and Delivery of the 3 Phase panel board to suit 7.5 HP Submersible Pumpset
Supply and Delivery of 6.00sqm Copper cable for pumpset errection
Supply and Delivery of 63mm dia HDPE Pipe for pumpset errection
Labour charges for errection of Pump set upto 7.5HP
Costruction of Bore Pit arrangements
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Providing Pumping Mainline
Supply,delivery, laying and jointing of 90mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the Departmental Officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
90mm PVC Bend
90mm PVC Threaded coupler
Supply and delivery of GI pipes medium class as per IS.1239/part I/ 1990 to site of work with ISI Marking
80mm GI pipe
Supply and delivery of GI specials to site of work as per IS specification with ISI marking
80mm GI Elbow
80mm GI coupling
Laying and jointing of GI Pipes with GI specials and PVC specials etc
Provision of Water meter, Dirt Box and Erection charges for Pumping Main
Construction of Pump Room
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by the Departmental Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the Departmental Officers
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by the Departmental Officers
Brick work in CM 1:5 (one cement and five sand) using country bricks of size 8.75" X 4.25" X 2.00" including cost of all materials, labour charges, curing etc., complete and as directed by the Departmental Officers
For foundation and basement
For super structure
Reinforced cement concrete 1:1 /2:3 (one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by the Departmental Officers
Reinforced cement concrete 1:1 /2:3 (one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by the Departmental Officers
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak (country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5 (One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by the Departmental Officers
Special ceiling plastering for RCC Slab with C.M.1:3 (One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by the Departmental Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by the Departmental Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.60 x 0.45 m
Painting two coats of Surface with ready mixed Plastic enamel paint of first quality and of approved colour over a priming coat including thorough scrapping, clean removal of of dirt and including necessary all labour Charges etc., complete complying with standard specifications
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by the Departmental Officers
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete complying with standard specifications
Provision for writing emblem and Scheme details on the side wall of the Pump room
Provision of lock and key for pump room and OHT ladder
Provision for Name Board
8.Construction of 60000 Litre OHT at Anganur Habitation of Sannsinallur Panchayat
Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by the Departmental Officers
First depth of 2m From 0 to 2 m below GL
Second depth of 2m From 2m to 4 m below GL
Sand filling for foundation with clear river sand including cost of sand, watering ,ramming and consolidation etc complete as directed by the Departmental Officers
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the Departmental Officers
Reinforced cement concrete 1:1.5:3 (one cement, one and half sand and three hard granite broken stone of 20mm size ISS gauge) mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
From 1.50m to 4.50m Below GL
From 0m to 1.50m Below GL
0m to 4.50m above GL
4.50m to 7.32m above GL
7.32m to 10.98 m above GL
10.98m to 14.64 m above GL
14.64m to 18.3 m above GL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the Departmental Officers
Plane Surface - Below GL
From GL to 3.30m
Above 5.30m to 6.30m
Above 8.30m to 9.30m
Above 11.30m to 12.30m
Square Column - Below GL and upto 3.30m above GL
Above 3.30m to 4.30m
Above 4.30m to 5.30m
Above 5.30m to 6.30m
Above 6.30m to 7.30m
Above 7.30m to 8.30m
Above 8.30m to 9.30m
Above 9.30m to 10.30m
Above 10.30m to 11.30m
Above 11.30m to 12.30m
Curved Surface - 11.30m to 12.30m
Above 12.30m to 13.30m
Above 13.30m to 14.30m
Above 14.30m to 15.30m
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Painting two coats of Surface with ready mixed Plastic enamel paint of first quality and of approved colour over a priming coat including thorough scrapping, clean removal of of dirt and including necessary all labour Charges etc., complete complying with standard specifications
Fabrication, supply, delivery and fixing of MS Ladder of 45cm made out of 50 mm x 50mm x 6mm MS angle for sides and steps in 16mm MS Plain rods at 30 cm centre to centre as directed by the departmental officers
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by the departmental officers
Providing GI Pipe Ventilating arrangements mosquito proof nylon net with 110mm PVC Cowl and as directed by the departmental officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed by the departmental officers
Providing manhole cover of size 0.60 x 0.60M in RCC 1:1.5:3 with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by the departmental officers
Painting Emblem on the SR with enamel paint and as directed by the departmental officers
Pipe connection arrangements for inlet,outlet,scour and overflow etc. including cost of pipes, specials, valve, labour charges for lifting, aligning, cutting, threading ,fixing and painting of GI pipes with two coats of approved quality enamal paint etc. complete
65mm GI pipes for inlet connection
65mm GI pipes for over flow & rain water harvesting pipe
50mm GI pipes for scour pipe
65mm GI pipe for delivery pipe
90mm PVC Threaded coupler
63mm PVC Threaded coupler
65mm dia GI Tee
65mm dia GI bend 90
65mm dia GI bend (short)
65mm GI coupler
65mm GI union
65mm GI Elbow
50mm GI union
50mm GI Elbow
65mm GI Tee
65x50mm GI reducer
75mmx63mm PVC reducer
65mm GM gate valve
50mm GM gate valve
63 mm PVC 6Ksc Pipe
Refilling the foundation with excavated earth including consolidation as directed by the departmental officers
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by the departmental officers
Providing Hand rails over the Standing Platform by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixied with 12mm dia Fastner Bolt 75mm long and as directed by the departmental officers
Provision for levelling the site
Provision for Name board
9.Providing 176 FHTC to Sivaramapuram Habitation of Sannasinallur Panchayat
Saddle Piece (63 x 20)
PVC MTA
GM 20mm Ferrule
20 mm UPVC Pipe
20 mm GI Elbow
20 mm GI Coupling
20 mm GI Pipe (0.9 + 0.60)
20 mm GI Coupling
20 mm GI Bend
20 mm GI Coupling
20 mm GI Pipe
20 mm x 15 mm GI Reducer Coupling
15 mm PVC Screw Down Tap
Shellace
Thread Ball
PVC Adhesive Solution
Cutting charges
Threading Charges
Earth work excavation in all soil for laying of Pipes and specials including all labour charges for other than loose soil i.e. hard gravelly soil etc., (Earth work only) (Pipe Trench width 0.60 m and Depth 1.05 m)
20 mm UPVC Pipe Laying Charges
Refilling charges
Supply and delivery of MS clamp and fixing in wall in open space with required screw etc
Labour charges for Tap Stand works and Erecting RCC Column for Pipe stand.
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Name Board Charges
10.Providing Pipeline (Distribution) to Sivaramapuram Habitation of Sannasinallur Panchayat
Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by the departmental officers
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works
63mm PVC Bend 4kcs
63mm PVC Tee
63mm PVC FTA
50mm GI Gate valve
PVC Adhesive (Solution)
Earth work excavation in all soil for laying jointing of PVC Pipes and specials including refilling the trenches after people laying works. (Width 0.60 m, Depth - 1.05m) Main lain
Provision of Water meter, Dirt Box and Erection charges for Delivery line from OHT
Restoration of Road Cutting - Cement Concrete
Labour for cutting open, Cement Concrete Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Restoration of Road Cutting - BT
Labour for cutting open, BT Road for laying water mains
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
CC 1:2:4 using 20mm graded aggregtes of HBGS centering, shuttering strutting, but including cost of mixing concrete, placing, finishing, curing etc., complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.JANARTHANAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .