| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC HOUSE NO A 31 POWER CITY JAMSHEDPUR KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹3.7 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹3.9 L+₹17,915.29 (4.83%)Rejected-Finance KORBA | KORBA | CHHATTISGARH | 495119 | ₹3.9 L+₹17,915.29 (4.83%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹6.1 L+₹2.4 L (63.4%)Rejected-Finance | ₹6.1 L+₹2.4 L (63.4%) | L3 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | SARITA AGRAWAL L1 | S.B Construction L2 | TOTAL PEST CONTROL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Street fogging for mosquito control at residential colonies & non-residential building campus as per instruction of Engineer-in-Charge. Cost of deisel, petrol,fogging machine to be provided by the contractor and as per actual consumption. The contractor will also make arrangements for carriage of auto or jeep with trolly in good & running condition. (One cycle in 30 days) ( King Fogg and others chamicals supplied by the department) | 24 | Times | 3,000 ₹72,000 Lowest | 3,400 ₹81,600 | 5,554.99 ₹1,33,319.76 |
| 2.00 | Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Total A-Type | 13,572 | no | 6 ₹81,432 Lowest | 6 ₹81,432 Lowest | 9 ₹1,22,148 |
| 3.00 | Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Total B- type | 3,744 | no | 6 ₹22,464 Lowest | 6 ₹22,464 Lowest | 9 ₹33,696 |
| 4.00 | Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)C - type old colony | 504 | no | 10 ₹5,040 | 8 ₹4,032 Lowest | 12.6 ₹6,350.4 |
| 5.00 | Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)D - type | 72 | no | 15 ₹1,080 | 11 ₹792 Lowest | 16.65 ₹1,198.8 |
| 6.00 | Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Cheap House | 180 | no | 25 ₹4,500 | 16 ₹2,880 Lowest | 28.35 ₹5,103 |
| 7.00 | Labour rate for mixing and spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of non-residential building premises (One cycle in 30 days) | 2,50,318.8 | Sqm | 0.15 ₹37,547.82 | 0.14 ₹35,044.63 Lowest | 0.23 ₹57,573.32 |
| 8.00 | Labour rate for mixing and spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of non-residential building premises open area (One cycle in 30 days) | 1,85,544 | Sqm | 0.17 ₹31,542.48 | 0.15 ₹27,831.6 Lowest | 0.23 ₹42,675.12 |
| 9.00 | Labour rate for mixing and spraying of chemical (Bytex/
B-Larva 100ml 2.5% solution + 10 litre drinking water) in main drains, small drains, stagnated dirty water logged area in side premises of colony. (One cycle in 30 days) | 2,94,250.32 | Mtrs | 0.2 ₹58,850.06 Lowest | 0.25 ₹73,562.58 | 0.38 ₹1,11,815.12 |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 56,602.15 ₹56,602.15 Lowest | 59,334.99 ₹59,334.99 | 92,498.31 ₹92,498.31 |
Tender Value
₹8.0 L
EMD Value
₹10,100
Closing Date
24 Oct 2025, 5:00 pmClosed
Staff Officer Civil SECL Korba Area
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Eradication mosquitoes with Medicine (K- Othrine / Solfac) and other insects by fogging, anti-larva spreading in RB and NRB buildings at DSB Sub area of Korba Area.(For Two year with Street fogging and spraying of chemicals once a month)
2025_SECL_345499_1
SECL/GM/C/eTender/25-26/103 Dt13.10.2025
Open Tender
Civil Works - Others
Item Rate
730 days
Office of General Manager SECL Korba Area
As per NIT
3 documents required · 3 mandatory
₹10,100
10 Apr 2026
13 Oct 2025
27 Oct 2025
14 Oct 2025
24 Oct 2025
14 Oct 2025
14 Oct 2025 - 17 Oct 2025
Amount
Street fogging for mosquito control at residential colonies & non-residential building campus as per instruction of Engineer-in-Charge. Cost of deisel, petrol,fogging machine to be provided by the contractor and as per actual consumption. The contractor will also make arrangements for carriage of auto or jeep with trolly in good & running condition. (One cycle in 30 days) ( King Fogg and others chamicals supplied by the department)
Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Total A-Type
Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Total B- type
Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)C - type old colony
Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)D - type
Labour rate for mixing & spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of residential building (One cycle in 30 days)Cheap House
Labour rate for mixing and spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of non-residential building premises (One cycle in 30 days)
Labour rate for mixing and spraying of chemical (K-Othrine 100ml 2.5% solution + 10 litre drinking water) in side of non-residential building premises open area (One cycle in 30 days)
Labour rate for mixing and spraying of chemical (Bytex/ B-Larva 100ml 2.5% solution + 10 litre drinking water) in main drains, small drains, stagnated dirty water logged area in side premises of colony. (One cycle in 30 days)
Total impact of GST for the purpose of CTC
S.B Construction (BID ID -1192679)
TOTAL PEST CONTROL (BID ID -1193567)
stage.html
html • 0.04 MB
techsummary_358166.pdf
finsummary_358166.pdf
aoc.pdf
finance_358166.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.36 MB
Tendernotice_3.pdf
PDF • 0.07 MB
BOQ_358166.xls
BOQ • 27.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .