Loading…
Loading…
Tender Value
₹30.7 L
EMD Value
₹61,400
Closing Date
4 Jul 2026, 10:30 am
Annual Maintenance Shutdown of Wheel Shop Equipments for 2026-27 (MWFPS) - Group 4 - Sand Plant, RT-14&15, Draw Furnace, Hot Wheel Line Turn Tables and WFPS Grinding Stations.
RWF-M-OT-MWFPS-2026-27-31
RWF-M-OT-MWFPS-2026-27-31
Open
12 Months
Tonk, Rajasthan
₹0
₹61,400
12 Jun 2026
12 Jun 2026
20 Jun 2026
A-Repair / Servicing of sand plant equipments/MMS (Rates are inclusive
1. Replacement of Drier shells along with refractory lining -01 Unit 2. Servicing of support rollers and guide rollers of Cooler and Drier -08 Nos 3. Servicing of Rotary plate and wearing 1 plate feeder- 01 Unit. 4. Servicing of wet dust collector Exhaust chimney01 Unit 5. Attention to M1 Belt conveyor- 01 Unit 6. Attention to M3 & M8 Belt conveyor- 02 Unit 7. Attention to M2 & M10 Bucket Elevator belts -02 Unit 8. Attention to Pugmill unit -01 Unit 9. Servicing of Sand Batch Heater- 01 Unit 10. Servicing of Cope Tilter -A return sand screw conveyor- 01 Unit 11. Fabrication and installation of standby blower unit for sand plant dust collector - 1 unit
B-REPAIR OF RT-14 WHEEL LOADER (Rates are inclusive of GST)
1. Removal of Gravity rollers, Centring unit assembly, hydraulic cylinders, chain, sprocket, pillow block bearings, shaft and hoses. -01 Set 2. Dismantle the Transfer car with wheel lifting arm assembly from the existing location for repair works. -01 Set 3. Replace all gravity roller assemblies with new bearings.- 01 Unit 4. Replacement of wheel lift arm shaft, sprocket, bearings & 1 chain. Repair guide ways & replace / servicing of cam rollers.- 01 Set 5. Replacement of defective trolley wheel rails (Vgroove rails). Servicing of transfer car trolley vgroove wheels assembly. -04 Nos 6. Repair centring unit arm & rollers, fit back serviced / new pneumatic cylinder & connect all accessories.-01 Set 7. Lifting & positioning of transfer car after repair works. Fitment of wheel lift arm cylinder, Finger cylinder, hoses & connect all accessories. Check transfer car movements with DF charge transfer car with wheel loading charge hook assembly.- 01 Set 8. Paint with one coat of apple green paint. 01 Unit 9. Shifting of all removed scrap to earmarked area. -01 MT
C- REPAIR OF RT-15 WHEEL UNLOADER (Rates are inclusive of GST)
1. Dismantle hydraulic cylinders, hoses, Chain, Pillow block bearings, sprocket, arm with shaft from the equipment. -01 Unit 2. Replacement of wheel lower arm shaft, bearings, sprocket 1 chain & cam rollers. -01 Unit 3. Fitment of wheel lift arm cylinder, Finger cylinder, cam rollers, hoses & all accessories. Check wheel unloader movements with DF discharge transfer car & wheel unloading from charge hook assembly after replacement of gravity rollers. -01 Unit 4. Remove & replacement of defective gravity roller assembly. -01 Unit 5. Paint with one coat of apple green paint. -01 Unit 6. Shifting of all removed scrap material to earmarked area. -01 MT
D-REPAIR OF DRAW FURNACE (Rates are inclusive of GST)
1. Replacement of charge, discharge door chain and worn-out pulleys. Replacement of refractory material on both the doors. -2 units 2. Servicing of charge & discharge end transfer car assemblies, replacement of transfer car rails, chains, sprockets, bearings & worn-out guides.-2 units 3. Fabrication & fitment of charge & discharge side puller unit assembly as per existing one. - 2 unit 4. Removal of existing indexing beam guide bracket with pawl assembly, indexing beam guide roller assemblies, indexing beam dogs & pins charge to discharge end. -16 unit 5. Fabrication of indexing beam guide bracket with pawl assembly as per the existing one & Fitment from charge to discharge end -16 unit 6. Servicing of indexing beam guide roller assemblies, indexing beam dogs & pins and fitment from charge to discharge end -4+16 set 7. Replacement of all Hydraulic cylinders with serviced one & replace hydraulic hoses for Charging, discharging, transfer cars & indexing mechanism. -9 units 8. Fabrication of the water cooled skid as per RWF drg No. 722210510470. - 3 units 9. Removal of water-cooled skids along with guides from charge to discharge end for trolley 1 cooling system & removal of watercooling pipelines of both inlet & outlet of water-cooled jackets and skids. - 3 units 10. Fitment of water-cooled skids along with guides from charge to discharge end for trolley cooling system. - 3 units 11. Fitment of new water-cooling pipelines of both inlet & outlet of water-cooled jackets and skids -3 units 12. Removal, servicing & fitment of water-cooled jackets for charge & discharge doors. - 1 set 13. Repair / replacement of bottom & top return track conveyor frames. Replacement of return track chain with proper alignment. Check Gearbox assembly, replace defective bearings, drive sprockets & chain. - 1 set 14. Repair to damaged roof and side wall panels - 3 units 15. Repair to damaged Hearth refractory. -1 unit 16. Servicing of RC fan assemblies. (Servicing includes repair of blower casing, replacement of new bearing, defective impeller, pulley, belt & dynamic balancing of impellers) -08 Nos 17. Removal of combustion tubes after dismantling burner assembly. Repair & relining of combustion tubes. Fitment of combustion tubes & burners. (08 Nos) 18. Servicing of Combustion blower assemblies. (Servicing includes repair of blower casing, replacement of defective bearing, Impeller, pulley belt & dynamic balancing of impellers) -03 Nos. 19. Painting of furnace with one coat of aluminium paint -1 unit 20. Shifting of removed scrap materials & refractory to earmarked area. -4 MT approx
E-HWL TURN TABLES-04 Nos. (NW-1, RT-1, RT-10 & RT12) Rates are
1. Removal of CDLR rollers, cylinders, chain, sprocket, pillow block bearings, shaft and hoses. 02 unit 2. Dismantle the Turn table structure from the existing location for repair works. 01 units 3. Remove all caster wheels and damaged supporting brackets 06 units 4. Replacement/ repair of damaged caster wheel brackets, Fitment of new/ serviced caster wheels on the brackets 1 after servicing and replacing bearings oil seals 06 units 5. Replace all CDLR roller assemblies with new bearings. Replace/ repair damaged CDLR channel and angles 02 units 6. Replacement of new/ serviced pivot bearing 01 No 7. Lifting & positioning of turn table structure after repair works. Fitment of new/ serviced cylinder, hoses & connect all accessories. 01 unit 8. Repair / replacement of jack shaft with bearings and sprockets. Connects jack shaft sprocket with gear box with new chains. 01 unit 9. Paint with one coat of apple green paint. 01 unit 10. Shifting of all removed scrap material to earmarked area. 0.5 MT
F-FRC Grinding stations- 05 Nos (3,4,4A,5&5A) (Rates are inclusive of
1. Repair / Replacement of structure frames. 01 Unit 2. Repair/ replacement of tiling 1 table bearings and shafts. 01 Unit 3. Repair / replacement of kicker support structures & replacement of defective kicker & support bearings. 01 Unit 4. Repair / replacement of work rotator drive and idler shafts with bearings and sprocket. 02 Unit 5. Fabrication and replacement of air motor mounting frame, Fitment of new/ serviced air motor on the frame, with sprockets and new chains. 01 Unit 6. Repair/ replacement of wheel support guide rollers. 02 Unit 7. Replacement of all defective pneumatic cylinders, pneumatic hoses & pipes and valves. 02 Unit 8. Replacement of guide rail adjustable guides and defective guide and main rails. 02 unit 9. Paint the all replaced structures, column with one coat of red-oxide and 2 coats of Apple green paint. 01 Unit
G-WFPS MAGNA TESTING STATIONS - 1, 1A & 2 (TOTAL - 03 UNITS)
1. Removal of work rotator assembly, sprocket and drive chains, kicker assembly, shaft and bearings 01 set 2. Removal of all pneumatic cylinders. 02 Nos 3. Replacement of defective kicker shaft, kicker arm, Pneumatic cylinders, D.C valves, flow control valves, Hoses & accessories. 01 set 4. Fabrication and fitment of kicker cylinder mounting base 01 set 5. Replacement of work rotator & idler shafts, roller polyurethane with bearings 01 set 6. Replacement of defective water & 1 pneumatic pipelines & hoses, pumps 01 set 7. Clean the spray tank and replacement of drain valves 01 set 8. Fabrication of new cover for water tank with 25mm angles and wire mesh and fitment 01 set 9. Fabrication and fitment of boom actuating cylinder mounting base 01 set 10. Servicing of boom shaft with bearings, actuator valves, cylinders etc. 01 set 11. Replacement of guide rails and main rails, structure supports and strengthening 01 set 12. Replacement of drive & driven chain sprockets, chains, filling of gear oil for drive gearbox. 06 Nos. 13. Paint with one coat of red oxide and Two coat of apple green paint after thorough cleaning. 01 set 14. Disposal of released materials and dispose it to the earmarked area. 01 MT
H-WFPS ULTRA SONIC TESTING STATIONS - 1 & 1A (TOTAL - 02 UNITS)
1. Removal of all pneumatic cylinders. 06 Nos. 2. Removal of work rotator assembly, UT bridge assembly, Kicker & stopper assembly. 01 set 3. Removal of Guide rollers, wheel runway, wheel clamping assembly. 01 set 4. Service & Fitment of work rotators assemblies by replacing defective bearings & plumber blocks. Fitment of flanges and glands to ensure leak proof tanks 1 set 5. Fabrication & fitment of spare motor mounting base and align with work rotator sprocket 01 set 6 Fabrication and fitment of kicker cylinder mounting base 01 set 7. Fabrication and fitment of stopper 1 cylinder mounting base 01 set 8. Fabrication and fitment of lowerator cylinder mounting base 02 set 9. Fabrication and fitment of bridge cylinder mounting base 01 set 10. Repair & fitment of wheel run way, UT bridge, Kicker & stopper assembly and ensure alignment with entry & exit side conveyors. 01 set 11. Repair & fitment of wheel clamping assembly. 01 set 12. Service & fitment of guide rollers. Replacement of guide rails and main rails 01 set 13. Replacement of defective water & pneumatic pipelines & hoses. 01 set 14. Fitment of all pneumatic cylinders & replacement of damaged hoses, valves and fittings. 06 Nos. 15. Paint with one coat of red oxide and Two coat of apple green paint after thorough cleaning. 01 set 16. Disposal of released materials and dispose it to the earmarked area. 01 MT
I-FR 1, 201, 7, 8, 249, 290,244 (TOTAL - 07 UNITS) (Rates are inclusive
1. Repair / Replacement of guide and main rail supporting structures. 06 Unit 2. Repair/ Strengthening of pivot bearing supports, removal, inspection & fitment of pivot bearings 02 1 units 3. Repair / Strengthening of lift guide mountings and replacement of defective guide rollers. 08 units 4. Repair / Strengthening of lift cylinder mountings & support structures. 01 units 5. Repair / Strengthening of kicker support structures & replacement of defective kicker & support bearings. 1 unit 6. Replacement of all defective pneumatic cylinders, pneumatic hoses & pipes. 02 units 7. Replacement of guide rail adjustable guides and defective guide and main rails. 06 unit
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
PartIOfferletter.pdf
ATTACHMENT
PartIIInstructionstoTenderers.pdf
ATTACHMENT
PartIIISpecialconditions.pdf
ATTACHMENT
PartIVPricesandpayments.pdf
ATTACHMENT
PartVBreakupofratesandschedule.pdf Part V Schedule of Works
ATTACHMENT
PartVIAnnexures.pdf
ATTACHMENT
PartVIINITfore-tender.pdf
ATTACHMENT
Part VIII GCC
ATTACHMENT
PartVBreakupofratesandschedule.pdf
ATTACHMENT
GCC_April-2022_merged_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid