Karnataka Forest Department
MANAGER
Construction of Hoskambi Range Forest Official Building at Hoskambi
KFD/2026-27/OW/WORK_INDENT42258
KFD/2026-27/OW/WORK_INDENT42258
Open
Other Works
Two Tender Document System(Two Cover)
KFD ACF Territorial Sub Division Office Ankola
1 document required · 0 mandatory · 1 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
As prime contractor you should satificatrly completed atleast one similar nature of work such as construction of building work an extent of 50 percent of the cost of the work
The contractor should submit a satisfactory work done certificate from the competent authority last 3 years
To qualify for award of this contract, each Tenderer in its name should have done the similar nature of work in the last five years ie 2021-22,2022-23, 2023-24, 2024-25 & 2025-26
Tenderer should produce PWD Contract Class I , Class II & Class III Registration Certificate
Tender Documents should be submitted in KW-2 Form
Auditing Balance sheet from last 3 years By CA
Tenderer should upload Credit/Over Draft facilities Minimum 50. lakhs
GST Registration certificate & Pan CardAddress proof (Aadhar Card/EPIC card/Driving license/bank pass book or any other documents issued by competent government authority
₹820
₹76,380
9 Sept 2026
9 Sept 2026
24 Sept 2026
22 Sept 2026
Construction of Hosakambi Range Forest Official Building at Hoskambi
1.5 Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, ...
2.1.2 Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS ...
2.2.3 Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregatesas per relevant IS Codes machine mixed with ...
Sl.No. 1 b.Addendum I -Percentage Additionalities for Formwork,Centering & ScaffoldingFor fast paced monolithic constructions, the Mivan Shuttering (Aluminium formwork) shall be preferred. 1. Foundat...
2.5.2 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The grani...
Sl.No. 9 : Addendum I -Percentage Additionalities for Formwork, Centering & Scaffolding For fast paced monolithic constructions, the Mivan Shuttering (Aluminium formwork) shall be preferred. 9. RCC Co...
5.5 Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less t...
2.2.3 Providing and laying in position Cement Concrete for all Foundation works The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with...
Sl.No. 2 Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding For fast paced monolithic constructions, the Mivan Shuttering (Aluminium formwork) shall be preferred. 2. Plinth Be...
5.7 Providing and constructing laterite size stone masonry including cost and conveyance of all materials curing etc complete as per specification I.S. 3620/1979 having compressive strength not less t...
2.5.2 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The grani...
Sl.No. 14 Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding For fast paced monolithic constructions, the Mivan Shuttering Aluminium formwork shall be preferred.14. RCC Beam...
2.5.2 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The grani...
Sl.No. 15- Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding For fast paced monolithic constructions, the Mivan Shuttering (Aluminium formwork) shall be preferred. 15. RCC ...
2.5.2 Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The grani...
Sl.No. 19 Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding For fast paced monolithic constructions, the Mivan Shuttering Aluminium formwork shall be preferred. 19. Chejja...
2.11a Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lap...
12.11 Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete a...
12.17 Providing and fixing in position fully panelled Honne wood shutters for doors with , stiles and rails of 35mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per d...
12.13.1 Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete an...
12.15 Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as p...
12.83.1 Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance -1mm), with wall thickness 2.0 mm (- 0.2 mm), corners of the do...
12.55.2 Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat mo...
11.34A Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed t...
12.86 Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elas...
12.85 Providing and fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and l...
8.3.2 Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, i...
2.1.2 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
9.17.2 Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 percentage and conforming to I.S. 15622, of approved make, in all colours & s...
8.39 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar dro...
8.33.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied at 0.90L/10 m² over an under coat of primer applied at0.75 L/10 m² of approved brand and manufacture to ...
8.33.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied at 0.90L/10 m² over an under coat of primer applied at 0.80 L/10 m² of approved brand and manufactu...
Providing & Fitting Electrification 4percentage
Providing & Fitting Sanitory & Water Supply 7 percentage (Including Septic Tank, Water Tank & Sump Etc.,)
Providing & Fitting Interior Works including Cabin & Compartment
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BID_DOCUMENT.pdf
Tender Document • 1.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .