Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 153 PKT 21 SECTOR 24 ROHINI NEW DELHI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | Admitted-Finance |
| 2 | Admitted-Finance 2 MORE SARAI CH CHOWK DELHI CENTRAL DELHI DELHI 110006 | NORTH DELHI | DELHI | 110006 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | Admitted-Finance |
| 5 | Admitted-Finance PP 32 MAURYA ENCLAVE PITAMPURA CHAITANYA CONSTRUCTION CO PP 32 MAURYA ENCLAVE PITAMPURA DELHI NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9,400
Closing Date
30 Nov 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER (EM) M-10
GREATER KAILASH, PART-I, NEW DELHI
Flushing / cleaning of various UGRs at Ambedkar Nagar Constituency.
2023_DJB_250494_1
NIT No. 12/EE(EM)M-10/(23-24)
Open Tender
Electrical Work/ Equipment
Works
45 days
EXECUTIVE ENGINEER (EM) M-10
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹9,400
Yes
13 Dec 2023
23 Nov 2023
30 Nov 2023
23 Nov 2023
30 Nov 2023
23 Nov 2023
Flushing /cleaning of 9 Nos UGR’s at Ambedkar Nagar Constituency as given below: 1. DakshinPuri HT BPS. 2. DakshinPuri OHT BPS. 3. Gurudwara Madangiri BPS. 4. J-II Madangiri BPS. 5. Budh Vihar Madangiri BPS. 6. JJR Khanpur BPS. 7. RPS Madamgiri BPS. 8. Khanpur Village BPS. 9. 3 No- Madangiri BPS Cleaning of underground sump, Over Head R.C.C. Tank (independent staging) including disposal of slit and rubbish, all as per direction of Engineer-in-Charge. The cleaning shall consist following operations:- (i)Tank shall be emptied of water by pumping & bottom shall be Cleaned of silt and other deposits. (ii) Entire surface area of the sump shall then scrubbed thoroughly With wire brush etc. and pressure washed with water. (iii) Chlorination of RCC internal surface by liquid chlorine. (iv) The treated surface shall be dried using air jetting and all loose Particles shall be removal from the surface. (v) Finally the surface shall be treated with ultraviolet radiation etc. as per direction of Engineer-in-Charge.
DEEPAK ENTERPRISES
M/S CHAITANYA CONSTRUCTION CO.
ARIHANT ENGINEERS AND TRADERS
CHANDERA BUILDERS
Premier Engineering Company
M G Traders and Engineers
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .