Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹24.7 Cr+₹1.8 Cr (7.91%)Admitted-Finance BEHIND WATER WORKS ST NO 4 JAIN NAGRI ROAD ABOHAR | L2 | Admitted-Finance |
Tender Value
₹20.8 Cr
EMD Value
₹41.6 L
Closing Date
25 Jul 2023, 6:00 pmClosed
ACE WRZ Banswara
Additional Chief Engineer, Water Resources Zone, Banswara
Construction of Pucca Water Course in Command area of Haro canal ,Jagpura canal and its distribution system of Mahi Major Irrigation Project, Banswara.
2023_WRDAS_350682_3
ACE NIT No. 4(V)(VI)(VII)/2023-24
Open Tender
Civil Works
Percentage
730 days
Banswara
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Via Egras challan
₹41.6 L
Yes
ACE WRZ Banswara
8 Aug 2023
14 Jul 2023
26 Jul 2023
14 Jul 2023
25 Jul 2023
14 Jul 2023
19 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. For dowels and outer slopes. | 1,48,000 | Sqm | 1.85 | ₹2,73,800 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 22,200 | Cum | 93 | ₹20,64,600 |
| 3 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 6,926.4 | Cum | 4,970 | ₹3,44,24,208 |
| 4 | AS PER NOTE 18.3
Add extra with the permission of Superintending Engineer,
2. Rs 175.00 per cum of concrete if computerised mobile transit mixer (i.e Fiori) is used. | 15,956.25 | cum | 175 | ₹27,92,343.75 |
| 5 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 1,51,552 | Sqm | 160 | ₹2,42,48,320 |
| 6 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 3,32,437.64 | Kg. | 95 | ₹3,15,81,575.8 |
| 7 | Providing, lowering, laying and jointing in trenches. standard lengths HDPE ISI marked Pipes as per IS-4984: l995 (amended upto date) with necessary jointing material like mechanical connectors, i.e. thread/ insert joint/ quick release coupler joint/ compression fitting joint or flanged joint and specials jointing pipe by butt fusion/ electro fusion welding method, including all taxes , transportation and freight charges, inspection charges, loading/ unloading charges, stacking of pipes, including cost of labour and material, specials (Tee, bend etc.), satisfactory hydraulic testing, disinfection etc. complete as per technical specifications and direction of Engineer-in-charge of following class and diameter. (excluding earth work)
Note : Providing and fixing of all requisite specials as per drawing, design and layout are inclusive in RM measurement of the item and shall not be paid. separately. Supply upto 110 mm dia. in coil & above 110 mm dia straight length in 6M. HDPE PE-100 PN-6 110 mm dia | 740 | RM | 409 | ₹3,02,660 |
| 8 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 300mm NP3 | 444 | RM | 1,059 | ₹4,70,196 |
| 9 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 300 mm Labour Charges only | 444 | RM | 132 | ₹58,608 |
| 10 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 450mm NP3 | 296 | RM | 2,094 | ₹6,19,824 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 21.39 MB
BOQ_623645.xls
BOQ • 0.34 MB
TechFHaroJagpura.pdf
Tender Documents • 2.14 MB
drawing.pdf
Tender Documents • 0.21 MB
FinFHaroJagpura.pdf
Tender Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .