Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
6 Oct 2026, 5:00 pm
Executive Engineer,Minor Distribution Division No-
Executive Engineer, Minor Distribution Division No-03, Mango, Jamshedpur
Repair and maintenance of Rudia Minor (Main Minor, OR- 5.1 and OR-5.2 ) and its water courses Ex. Km 6.86 of CLMC.
2026_WRD_118598_1
WRD/SMP/CC/MDD NO-03/JAMSHEDPUR/F2-01/2026-27
Open Tender
Civil Works
Percentage
365 days
Chandil
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹3.0 L
Yes
11 Sept 2026
11 Sept 2026
8 Oct 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation,grass bushes,shrubs saplings and trees girth upto 300 mm removal of stamps of cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness) (i) By manual means A. In area of light jungle | 5.02 | Per Hectare | 88,499.5 | ₹4,44,072.79 |
| 2 | Earthwork in bed clearance or desilting of canals carrying F.s Discharge of b/w 8.50 cumecs and 0.14 cumecs and rennovation of pynes etc. disposal of excavated earth etc. in ordinary soil including rough dressing with initial lead of 10 m and lift of 1.5 m as per direction of E/I. | 2,764.7 | Per M3 | 120.61 | ₹3,33,450.47 |
| 3 | Earthwork in excavation of canal having discharge b/w 8.5 cumecs and 0.14 cumecs in ordinary soil(vide classification of soil item-A) including clod breaking having earth in 225mm layers and rough dressing of soil with initial lead of 10 m and lift of 1.5 m and all complete as per specification and direction of E/I. | 429.89 | Per M3 | 120.61 | ₹51,849.03 |
| 4 | Earthwork in filing in flood embankment canal banks(canal dischcharge upto 28 cumecs) as well as special repair of embankment and canal banks in ordinary soil in proper profile (vide classification of soil item-A) obtained from borrow area or any other sources free from logs, roots or any other ingredients etc. with initial lead of 15 M and initial lift of 1.5 m including breaking clods to maximum50 mm cube placing the earth in layers not exceeding 225 mm thick complete as per specification and direction of E/I.(Mode of measurement -sectional measurement shall be of compacted earth) | 910.38 | Per M3 | 127.93 | ₹1,16,464.91 |
| 5 | Watering and Consolidation of Earth laid in 150 mm to 225 mm layer by manual labour with C.I hammer to achieve minimum 85 % of maximum dry density including supply of water and necessary tools and plants with all lead and lift all complete as per specification and direction of E/I | 910.38 | Per M3 | 39.8 | ₹36,233.12 |
| 6 | Providing compacted 75 mm thick sand filter required F.M. As per design on side slope and bed complete job as per specification and direction of E/I | 865.01 | Per M2 | 144.3 | ₹1,24,820.94 |
| 7 | Supplying and laying of L.D.P.E sheet of 100 micron over fine sand cushioning below p.c.c slab in bed all complete job as per specification and direction of E/I | 3,940.5 | Per M2 | 8.5 | ₹33,494.25 |
| 8 | Supply and placing of Hessian Cloth(0.3kg/Mw cot.) (M-268 of WRD SOR 2022) | 6,956.6 | M2 | 43.68 | ₹3,03,864.29 |
| 9 | Providing 100 mm thick P.C.C lining in M-150 with nominal mix of (1:2:4) with well graded stone chips (20 mm and down) and coarse sand of approved quality of required F.M(2.5 to 3.0) in side and bottom curved portion of the canal in panel with construction joint including cost of form work and its removal ,curing,royalty and all other taxes,complete job as per specification and direction of E/I. | 921.04 | Per M3 | 8,289.57 | ₹76,35,025.55 |
| 10 | Providing 10 mm thick vertical joints at suitable interval joints filled with bituminous materials of approved quality including royalty all taxes etc. all complete job as per specification and direction of E/I. for canal side slope 7.2.10.1 | 1,994.07 | Per M | 166.78 | ₹3,32,570.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
document.pdf
Tender Documents • 11.34 MB
BOQ_160406.xls
BOQ • 0.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .