Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 314 L I G SECOND INDIRA NAGAR UJJAIN M P | UJJAIN | UJJAIN | MADHYA PRADESH | Accepted-Technical all document ok |
Tender Value
₹2.5 L
EMD Value
₹2,545
Closing Date
22 Apr 2026, 5:30 pmClosed
COMMISSIONER OF UJJAIN MUNICIPAL CORPORATION
CCHATRAPATI SHIVAJI BHAWAN, AGAR ROAD UJJAIN
REMAINING WORK OF BHAAMI SAMAJ DHARAMSHALA NEAR RAMDEV BABA TEMPLE UNDER WARD NO. 10
2026_UAD_485296_2
202/ZONE1/E-TENDER/2026
Open Tender
Civil Works - Others
Percentage
30 days
NEAR RAMDEV BABA TEMPLE UNDER WARD NO. 10
PLEASE REFER TENDER DOCUMENT
4 documents required · 4 mandatory
₹2,000
₹2,545
2 Jul 2026
7 Apr 2026
24 Apr 2026
7 Apr 2026
22 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centering and shuttering including strutting, propping stretching etc.complete for and removal of form work by sheet plate or ply wood shuttering for Columns, Pillars, Piers, Abutments, Posts and Struts. | - | SqM | 362 | - |
| 2 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses,fillets, columns, pillars, piers, abutments, posts and struts etc.aboveplinth level and up to floor two level excluding cost of centering, shuttering and reinforcement etc.Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size of stone aggregate. | - | CUM | 5,656 | - |
| 3 | Brick work with fly ash lime bricks (FALG Bricks) conforming to IS:12894- 2002, class designation 50 (average compressive strength) in superstructure above plinth level up to floor 2 level including the cost of
scaffolding :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 4,607 | - |
| 4 | 12 mm cement plaster of mix :1:4 (1 cement: 4 sand) | 1 | CUM | 149 | ₹148.85 |
| 5 | 15 mm cement plaster on rough side of single or half brick wall of mix.1:4 (1 cement: 4 sand) | - | CUM | 174 | - |
| 6 | Granite of any colour and shade.Area of slab upto 0.50 sqm | - | SqM | 2,591 | - |
| 7 | Providing and fixing stainless steel ( Grade 304) railing made of
Hollow tubes, channels, plates etc. including welding, grinding,
buffing, polishing and making curvature (wherever required) and
fitting the same with necessary stainless steel nuts and bolts
complete i/c fixing the railing with necessary accessories and stainless
steel dash fasteners , stainless steel bolts etc., of required size, on
the top of the floor or the side of waist slab with suitable
arrangement as per approval of Engineer-in-charge. | - | KG | 407 | - |
| 8 | Wall painting with plastic emulsion paint of approved brand and
manufacture to give an even shade: Two or more coats on new work | - | SqM | 58 | - |
| 9 | Reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding upto floor level including cost
of binding wire, wastage and over laps upto 12mm horizontal/ inclined
position of reinforcement bars in slab and beams, plinth, chajjas,
lintels, upto 4.5m vertical length of reinforcement in wall columns (over
laps shall be provided as per requirement of IS : 13920; IS 456 & SP : 34) etc. complete.Mild steel and Medium Tensile steel bars. | - | KG | 57 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
tender.pdf
Tender Documents • 1.85 MB
NIT.pdf
Other Document • 0.04 MB
BOQ_598263.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .