| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC Lowest Bidder L1 |
| 2 | L2₹6.8 L+₹9,395.93 (1.40%)Rejected-AOC NO 2B KANTHASAMY VATHIYAR STREET DHARMAPURI 636 701 | DHARMAPURI | TAMIL NADU | 636701 | ₹6.8 L+₹9,395.93 (1.40%) | L2 | Rejected-AOC Lowest Bidder L2 |
| 3 | L3₹7.0 L+₹29,671.37 (4.41%)Rejected-AOC | ₹7.0 L+₹29,671.37 (4.41%) | L3 | Rejected-AOC Lowest Bidder L3 |
| 4 | L4₹7.1 L+₹39,957.45 (5.94%)Rejected-AOC | ₹7.1 L+₹39,957.45 (5.94%) | L4 | Rejected-AOC Lowest Bidder L4 |
| 5 | L5₹7.2 L+₹49,452.28 (7.35%)Rejected-AOC | ₹7.2 L+₹49,452.28 (7.35%) | L5 | Rejected-AOC Lowest Bidder L5 |
Tender Value
₹9.9 L
EMD Value
₹9,900
Closing Date
20 Aug 2026, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer Public Works Department Buildings Construction and Maintenance Division Dharmapuri
Special repairs to leaky roof, doors, water supply, sanitary and painting arrangements in Health Sub Centre at Alankarai in Dharmapuri District.
2026_PWD_691102_1
04/NIT-01/DPI-DIV/2026-2027
Open Tender
Civil Works - Buildings
Lump-sum
90 days
Alankarai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹9,900
17 Sept 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling clearing away and carefully stacking materials useful for reuse for any thickness of walls Chipping of concrete and roughening the surface complete complying with standard specifications. | 81.55 | Sq.m | 43.2 | ₹3,522.96 |
| 2 | Earth work excavation for foundation by manual means for RR/Brick and Other step type footings for Load bearing structures in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers.
The cost of earth work excavation shall be calculated based on the classifications of soils furnished in the trial pit details appended with the estimates | 7.05 | Cu.m | 237.55 | ₹1,674.73 |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means Ground floor | 0.55 | Cu.m | 7,120.34 | ₹3,916.19 |
| 4 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. | 7 | Cu.m | 4,032.28 | ₹28,225.96 |
| 5 | Providing Polymer Coating (Water Proof Coating) for sunken Portion of toilet with following specification and the surface shall be cleaned to remove all dust, foreign, matters lose materials or any other deposits of contamination by rubbing with wire brush.
Slurry: Dry blend and polymer liquid blend shall be mixed into the desired ratio as per recommendation of the supplier. The mix shall be stirred throughly until no bubbles remain in the mix. Any lumps found in mix shall be removed.
Apply first coat of polymer modified cementitious slurry by brush on wet cleaned surface. After drying, second coat shall be applied on the first coat as directed by the departmental officers etc. The rate inclusive of cost of materials and labour, etc., complete. | 97.85 | Sq.m | 329 | ₹32,192.65 |
| 6 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officerss. | 97.85 | Sq.m | 1,343.26 | ₹1,31,437.99 |
| 7 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for foundation including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 6.1 | Cu.m | 5,474.46 | ₹33,394.21 |
| 8 | Brick work in Cement Mortar 1:5 using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 5.45 | Cu.m | 7,698.63 | ₹41,957.53 |
| 9 | Supplying and filling in foundation, basement, etc with Gravel in layers of not more than 15 cm thick well watered, rammed and consolidated complete complying with standard specification and as directed by the departmental officers. | 3.95 | Cu.m | 487.77 | ₹1,926.69 |
| 10 | Providing granolithic floor finish of the 40mm thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 6 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) : | 48.55 | Sq.m | 432.23 | ₹20,984.77 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
TenderConditions.pdf
Tender Documents • 1.66 MB
BOQ_830963.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .