| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC ASTBAL MOHALLA BANASAR BAGH ROAD PATIALA GATE SANGRUR 148001 | SANGRUR | SANGRUR | PUNJAB | 148001 | ₹1.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 Cr+₹51,200 (0.27%)Rejected-Finance 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | ₹1.9 Cr+₹51,200 (0.27%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 Cr+₹4.5 L (2.37%)Rejected-Finance 19192 STREET NO 8 BIBI WALA ROAD OPPOSITE DAV COLLEGE BATHINDA PUNJAB PIN 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹1.9 Cr+₹4.5 L (2.37%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | R D Bansal L2 | M/S MANI GARG CONTRACTOR L3 | NARINDER KUMAR SONS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Total amount of Sch 'A' Part-I (Building Works) lump sum price worked out by the contractor for "Building Works" as listed in Schedule 'A' Part-I | 1 | Lump sum | 76,00,000 ₹76,00,000 | 59,00,000 ₹59,00,000 Lowest | 71,00,000 ₹71,00,000 |
| 2.00 | Total amount of Sch 'A' Part-II (Site Clearance and Earth Work Works) lump sum price worked out by the contractor for "Site Clearance and Earth Work Works" as listed in Schedule 'A' Part-II. | 1 | Lump sum | 10,20,000 ₹10,20,000 | 8,00,000 ₹8,00,000 | 1,00,000 ₹1,00,000 Lowest |
| 3.00 | Total amount of Sch 'A' Part-III (Internal Water Supply Works) lump sum price worked out by the contractor for "Internal Water Supply Works" as listed in Schedule 'A' Part-III. | 1 | Lump sum | 35,500 ₹35,500 | 35,000 ₹35,000 Lowest | 40,000 ₹40,000 |
| 4.00 | Total amount of Sch 'A' Part-IV (Internal Electrification Works) lump sum price worked out by the contractor for "Internal Electrification Works" as listed in Schedule 'A' Part-IV. | 1 | Lump sum | 2,50,000 ₹2,50,000 Lowest | 2,50,000 ₹2,50,000 Lowest | 2,50,000 ₹2,50,000 Lowest |
| 5.00 | Total amount of Sch 'A' Part-V (Sewage Disposal Works) lump sum price worked out by the contractor for "Sewage Disposal Works" as listed in Schedule 'A' Part-V. | 1 | Lump sum | 1,50,000 ₹1,50,000 Lowest | 1,69,722.5 ₹1,69,722.5 | 2,00,000 ₹2,00,000 |
| 6.00 | Total amount of Sch 'A' Part-VI (Road, Path, Culverts Works) lump sum price worked out by the contractor for "Road, Path, Culverts Works" as listed in Schedule 'A' Part-VI. | 1 | Lump sum | 22,50,000 ₹22,50,000 Lowest | 27,00,000 ₹27,00,000 | 25,00,000 ₹25,00,000 |
| 7.00 | Total amount of Sch 'A' Part-VII (Area Drainage Works) lump sum price worked out by the contractor for "Area Drainage Works" as listed in Schedule 'A' Part-VII. | 1 | Lump sum | 10,00,000 ₹10,00,000 | 8,50,000 ₹8,50,000 Lowest | 10,00,000 ₹10,00,000 |
| 8.00 | Total amount of Sch 'A' Part-VIII ( Fencing/ Gate) lump sum price worked out by the contractor for "Boundary Wall/ Fencing/ Gate" as listed in Schedule 'A' Part-X. | 1 | Lump sum | 25,90,000 ₹25,90,000 | 25,64,664.37 ₹25,64,664.37 | 25,50,000 ₹25,50,000 Lowest |
| 9.00 | Total amount of Sch 'A' Part-IX (External Electric Supply) lump sum price worked out by the contractor for "External Electric Supply" as listed in Schedule 'A' Part-VIII. | 1 | Lump sum | 28,00,000 ₹28,00,000 Lowest | 42,00,000 ₹42,00,000 | 35,00,000 ₹35,00,000 |
| 10.00 | Total amount of Sch 'A' Part-IX (External Water Supply Works) lump sum price worked out by the contractor for "External Water Supply Works" as listed in Schedule 'A' Part-IX. | 1 | Lump sum | 1,85,000 ₹1,85,000 Lowest | 2,25,000 ₹2,25,000 | 2,00,000 ₹2,00,000 |
Tender Value
₹1.9 Cr
EMD Value
₹2.6 L
Closing Date
29 Jun 2026, 6:00 pmClosed
CWE Patiala
HQ COMMANDER WORKS ENGINEER BLDG No 26 NEW LALBAGH PATIALA 147001 Contact - 01712200082
INTEGRATED SOLID WASTE MANAGEMENT (SWM) PROJECT AT NABHA AND SANGRUR UNDER GE (S) PATIALA
2026_MES_768595_1
CWE/PAT/T-10/2026-27
Open Tender
Civil Works
Item Rate
365 days
GE (S) Patiala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹2.6 L
8 Aug 2026
29 May 2026
1 Jul 2026
29 May 2026
29 Jun 2026
22 Jun 2026
29 May 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Total amount of Sch 'A' Part-I (Building Works) lump sum price worked out by the contractor for "Building Works" as listed in Schedule 'A' Part-I | 1 | Lump sum | 69,55,000 | ₹69,55,000 |
| 2 | Total amount of Sch 'A' Part-II (Site Clearance and Earth Work Works) lump sum price worked out by the contractor for "Site Clearance and Earth Work Works" as listed in Schedule 'A' Part-II. | 1 | Lump sum | 11,37,964.33 | ₹11,37,964.33 |
| 3 | Total amount of Sch 'A' Part-III (Internal Water Supply Works) lump sum price worked out by the contractor for "Internal Water Supply Works" as listed in Schedule 'A' Part-III. | 1 | Lump sum | 25,312.38 | ₹25,312.38 |
| 4 | Total amount of Sch 'A' Part-IV (Internal Electrification Works) lump sum price worked out by the contractor for "Internal Electrification Works" as listed in Schedule 'A' Part-IV. | 1 | Lump sum | 1,36,936.26 | ₹1,36,936.26 |
| 5 | Total amount of Sch 'A' Part-V (Sewage Disposal Works) lump sum price worked out by the contractor for "Sewage Disposal Works" as listed in Schedule 'A' Part-V. | 1 | Lump sum | 1,69,722.5 | ₹1,69,722.5 |
| 6 | Total amount of Sch 'A' Part-VI (Road, Path, Culverts Works) lump sum price worked out by the contractor for "Road, Path, Culverts Works" as listed in Schedule 'A' Part-VI. | 1 | Lump sum | 20,04,909 | ₹20,04,909 |
| 7 | Total amount of Sch 'A' Part-VII (Area Drainage Works) lump sum price worked out by the contractor for "Area Drainage Works" as listed in Schedule 'A' Part-VII. | 1 | Lump sum | 9,36,815.5 | ₹9,36,815.5 |
| 8 | Total amount of Sch 'A' Part-VIII ( Fencing/ Gate) lump sum price worked out by the contractor for "Boundary Wall/ Fencing/ Gate" as listed in Schedule 'A' Part-X. | 1 | Lump sum | 25,64,664.37 | ₹25,64,664.37 |
| 9 | Total amount of Sch 'A' Part-IX (External Electric Supply) lump sum price worked out by the contractor for "External Electric Supply" as listed in Schedule 'A' Part-VIII. | 1 | Lump sum | 34,34,870.74 | ₹34,34,870.74 |
| 10 | Total amount of Sch 'A' Part-IX (External Water Supply Works) lump sum price worked out by the contractor for "External Water Supply Works" as listed in Schedule 'A' Part-IX. | 1 | Lump sum | 1,77,892.92 | ₹1,77,892.92 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Nabhadrawings.pdf
Additional Documents • 12.48 MB
Tendert102627.pdf
Tender Documents • 2.14 MB
Sangrurdrawing.pdf
Additional Documents • 10.93 MB
BOQ_860724.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .