Loading…
Loading…
Tender Value
₹14.1 L
EMD Value
₹28,200
Closing Date
25 Jun 2026, 5:00 pm
Earthing of Lighthouse towers under Sri VijayaPuram
9380503
GEM/2026/B/7585824
Two Packet Bid
Labour charges for laying of copper tape,Labour charges for making earth pit,Labour charges for fix
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
3 yrs
₹6 L
80%
Director of Lighthouses and Lightships, Sri VijayaPuram, Deep Bhavan, 44 B. S Road, Sri Vijaya Puram, (Director)
₹28,200
3 Jun 2026
3 Jun 2026
25 Jun 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping on the outside surface of tower. | 45 | Mtr | mkpathak_68 | 90 |
| 2 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate | 1 | Job | mkpathak_68 | 90 |
| 3 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | 1 | Each | mkpathak_68 | 90 |
| 4 | Labour charges for removal of old earthing | Labour charges for removal of old earthing strip layed on the surface of lighthouse tower from top to bottom, lighting arrestor etc complete as required. | 1 | Job | mkpathak_68 | 90 |
| 5 | Transportation of earthing materials from Sri Vijayapuram to aerial bay by bus or boat or cargo vehicle. | Transportation of earthing materials from Sri Vijayapuram to aerial bay by busorboator cargo vehicle. | 1 | Job | mkpathak_68 | 90 |
| 6 | Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. | Transportation of earthing materials from aerial Bay to East Island Jetty including dinghi hire charges along with safety boat. | 2 | Trip | mkpathak_68 | 90 |
| 7 | Labour charges for transportation of earthing materials from shore to lighthouse. | Labour charges for transportation of earthing materials from shore to lighthouse. | 1 | Job | mkpathak_68 | 90 |
| 8 | Labour charges for laying of copper tape | Labour charges for laying of copper tape from top of the lighthouse tower to bottom upto earthing pit by clamping ornut bolt on the outside surface of tower. | 18 | Mtr | mkpathak_68 | 90 |
| 9 | Labour charges for making earth pit | Labour charges for making earth pit of size 1000mm x1000mm x1800mm and refilling the pit after inserting earthing plate | 1 | Job | mkpathak_68 | 90 |
| 10 | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | Labour charges for fixing of lighting arrester at the top of the tower including cost of nuts and bolts. | 1 | Each | mkpathak_68 | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9380503.pdf
GEM_BID • 0.50 MB
earthing_specification_2026-05-26-11-30-37_9ffcde58481458ed7d9c257a34cdb4e5.pdf
BOQ • 0.40 MB
boqearthing_2026-05-26-11-30-38_ecc8f3c605dd7917dcee5774605841a8.csv
BOQ • 0.02 MB
ATCLabour_82390d4a-8131-4242-b1e01780482824900_b_raju.docx
GEM_OTHER • 0.36 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid