Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹5.6 L (3.07%)Admitted-Finance | ₹1.9 Cr+₹5.6 L (3.07%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹6.2 L (3.44%)Admitted-Finance 641 PHASE LL RAMDARBAR CHANDIGARH | NA | NA | 160001 | ₹1.9 Cr+₹6.2 L (3.44%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹7.4 L (4.10%)Admitted-Finance | ₹1.9 Cr+₹7.4 L (4.10%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹16.9 L (9.29%)Admitted-Finance | ₹2.0 Cr+₹16.9 L (9.29%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Daadhich Tubewell Company L2 | SHARIF MOHAMMED SHEIKH L5 | SUDHANI CONSTRUCTION COMP L1 | shri ganesh construction company L4 | M/s J P Construction Co L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Operation of all civil, mechanical and electrical facilities of the system including wages to staff cost of consumables lubricants and spares, re-winding of burnt motors, repair of pipe line, valves etc and making good all major and minor faults and all repair / replacements as mention in the scope of work but excluding the cost of power charges for period of 5 (FIVE) years after 1 Year Defect liability period. For following MVS Schemes Saldari-Palawara GP-Saldari | ||||||||
| 1.01After completion of sucessful work and Defect Liability period | ||||||||
| 1.02 | Operation and maintenance of scheme for 5 Years after one year DLP | 1 | Each | 5,74,800 ₹5,74,800 | 6,76,264.21 ₹6,76,264.21 | 5,57,917 ₹5,57,917 Lowest | 7,00,000 ₹7,00,000 | 6,76,264.21 ₹6,76,264.21 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
17 Aug 2023, 6:00 pmClosed
Superintending Engineer PHED Circle Udaipur
Superintending Engineer PHED Circle Udaipur Near Patel circle Udaipur
NIT 105 Yr 2023_24
2023_PHCJA_354396_7
SE 99-122/2023-24
Open Tender
Civil Works - Water Works
Percentage
270 days
PHED Sub Dn Area Jhadol
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Executive Engineer PHED Distt. Rural Dn. Udaipur
₹4.4 L
Yes
5 Oct 2023
28 Jul 2023
18 Aug 2023
28 Jul 2023
17 Aug 2023
28 Jul 2023
Amount
Operation of all civil, mechanical and electrical facilities of the system including wages to staff cost of consumables lubricants and spares, re-winding of burnt motors, repair of pipe line, valves etc and making good all major and minor faults and all repair / replacements as mention in the scope of work but excluding the cost of power charges for period of 5 (FIVE) years after 1 Year Defect liability period. For following MVS Schemes Saldari-Palawara GP-Saldari
After completion of sucessful work and Defect Liability period
Operation and maintenance of scheme for 5 Years after one year DLP
Bidder Name
Amount
Daadhich Tubewell Company(GSTN-08AEKPD4429G1ZL)
SHARIF MOHAMMED SHEIKH(GSTN-NA)
SUDHANI CONSTRUCTION COMP(GSTN-NA)
shri ganesh construction company(GSTN-NA)
M/s J P Construction Co(GSTN-NA)
Daadhich Tubewell Company
M/s J P Construction Co
SHARIF MOHAMMED SHEIKH
shri ganesh construction company
M/s J P Construction Co
Daadhich Tubewell Company
shri ganesh construction company
SHARIF MOHAMMED SHEIKH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
105TDSaldariPalawara.pdf
Tender Documents • 5.66 MB
BOQ_630023.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .