Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹22.9 L+₹17,740 (0.78%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NITHYASHREE ENTERPRISES L2 | MOHAN AGENCIES L1 |
|---|---|---|---|---|---|
| 1.10 | MS Plate (6mm Thick.) | 9 | MT | 81,000 ₹7,29,000 | 79,500 ₹7,15,500 Lowest |
| 1.20 | ISMC 175x75x5.7mm | 0.4 | MT | 70,000 ₹28,000 | 69,900 ₹27,960 Lowest |
| 1.30 | ISMC 150x75x6mm | 1.1 | MT | 70,000 ₹77,000 | 69,900 ₹76,890 Lowest |
| 1.40 | ISMC 75x40x4.4mm | 0.9 | MT | 70,000 ₹63,000 | 69,900 ₹62,910 Lowest |
| 1.50 | ISA 75x75x8mm | 0.8 | MT | 70,000 ₹56,000 | 69,900 ₹55,920 Lowest |
| 2.00 | Dismantling of wornout mill inlet hot air duct & mixed air duct portion between Hot air gate and Cold air gate at above 9m level by scaffolding, marking, cutting hot air duct & cold air duct, inspection doors, seal air duct joint & hot air & cold air duct joints, leading, lifting, loading and transporting and devoluting the reterived scraps at stores | 6 | MT | 19,900 ₹1,19,400 | 19,500 ₹1,17,000 Lowest |
| 3.00 | Fabrication, erection of mill inlet hot air duct & mixed air duct portion between hot air gate & cold air gate (from main hot air bus & cold air bus to above 9 meter level as per standards and as per the direction of site incharge). Work involves fabrication of ducts, venturi, transition bend duct with stiffiner, channels, angles and replacement of expansion bellows as per existing. Complete welding with leak testing, leading, lifting, loading and transporting charges, special electrodes, cost of consumables and hire charges for crane, winch and T&P’s. | 12.2 | MT | 89,000 ₹10,85,800 | 88,900 ₹10,84,580 Lowest |
| 4.00 | Scaffolding, including supporting pipes for arresting the Hot primary air duct & Cold air duct - up stream and down stream of worn-out expansion Bellow; cutting and removal of worn out expansion Bellow; gougeing and edge preparation; leading, lifiting and erection of new / reconditioned Expansion Below in position; through welding and providing cover plate inside the Expansion Bellow with one side welding, including cutting and removal of the existing cover plate; Drawal & devolution of material | 3 | Nos | 44,000 ₹1,32,000 | 43,900 ₹1,31,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹23,400
Closing Date
9 Jun 2026, 2:00 pmClosed
As per schedule
As per schedule
MPM UII sup erc of Mill hot air duct
2026_EB_678150_1
CE NCTPS II SE M I O M 102R1 2025 26
Open Tender
Power/Energy Projects/Products
Works
30 days
As per schedule
As per schedule
3 documents required · 3 mandatory
₹0
₹23,400
Yes
28 Aug 2026
25 May 2026
10 Jun 2026
25 May 2026
9 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | MS Plate (6mm Thick.) | 9 | MT | - | - |
| 1.2 | ISMC 175x75x5.7mm | 0.4 | MT | - | - |
| 1.3 | ISMC 150x75x6mm | 1.1 | MT | - | - |
| 1.4 | ISMC 75x40x4.4mm | 0.9 | MT | - | - |
| 1.5 | ISA 75x75x8mm | 0.8 | MT | - | - |
| 2 | Dismantling of wornout mill inlet hot air duct & mixed air duct portion between Hot air gate and Cold air gate at above 9m level by scaffolding, marking, cutting hot air duct & cold air duct, inspection doors, seal air duct joint & hot air & cold air duct joints, leading, lifting, loading and transporting and devoluting the reterived scraps at stores | 6 | MT | - | - |
| 3 | Fabrication, erection of mill inlet hot air duct & mixed air duct portion between hot air gate & cold air gate (from main hot air bus & cold air bus to above 9 meter level as per standards and as per the direction of site incharge). Work involves fabrication of ducts, venturi, transition bend duct with stiffiner, channels, angles and replacement of expansion bellows as per existing. Complete welding with leak testing, leading, lifting, loading and transporting charges, special electrodes, cost of consumables and hire charges for crane, winch and T&P’s. | 12.2 | MT | - | - |
| 4 | Scaffolding, including supporting pipes for arresting the Hot primary air duct & Cold air duct - up stream and down stream of worn-out expansion Bellow; cutting and removal of worn out expansion Bellow; gougeing and edge preparation; leading, lifiting and erection of new / reconditioned Expansion Below in position; through welding and providing cover plate inside the Expansion Bellow with one side welding, including cutting and removal of the existing cover plate; Drawal & devolution of material | 3 | Nos | 1 | ₹3 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_814766.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .