Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.7 LAdmitted-Finance | -23.56% | ₹9.7 L | L1 | Admitted-Finance |
| 2 | L2₹9.9 LAdmitted-Finance | -21.81% | ₹9.9 L | L2 | Admitted-Finance |
| 3 | L3₹11.5 LAdmitted-Finance N A | NA | NA | 121004 | -9.00% | ₹11.5 L | L3 | Admitted-Finance |
| 4 | L4₹11.8 LAdmitted-Finance LUCKNOW | UTTAR PRADESH | 226001 | -7.10% | ₹11.8 L | L4 | Admitted-Finance |
| 5 | L5₹12.4 LAdmitted-Finance | -2.00% | ₹12.4 L | L5 | Admitted-Finance |
Tender Value
₹12.6 L
EMD Value
₹25,300
Closing Date
29 May 2026, 5:00 pmClosed
AMA ZP SAMBHAL
OFFICE ZP SAMBHAL
6- GRAM BEHTA JAYSINGH ME ZILA PANCHAYAT KARYALYA BHAWAN KE SAMPARK MARG PR CC NIRMARN KARYA
2026_UPPRD_1147589_6
158/ZPS/NIANU/PRV/2026-27 dt 11/05/2026
Open Tender
Civil Works
Percentage
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
ZILA NIDHI ZP SAMBHAL
₹25,300
9 Jun 2026
12 May 2026
30 May 2026
12 May 2026
29 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | (G.S.B G-1) Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 55.5 | Cum | 3,962.96 | ₹2,19,944.28 |
| 3 | (WBM G-3) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading- 3 as per Technical Specification Clause 405. | 41.63 | Cum | 4,719.55 | ₹1,96,474.87 |
| 4 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (1:3:6) | 3.38 | Cum | 7,009 | ₹23,690.42 |
| 5 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 | 15.53 | Cum | 6,258.54 | ₹97,195.13 |
| 6 | Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (1:2:4) | 0.86 | Cum | 7,831.43 | ₹6,735.03 |
| 8 | (CC road Slab) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse an using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 83.25 | Cum | 8,598.44 | ₹7,15,820.13 |
| 10 | Supplying and fixing of Informatary stone including cost of its frame, Labour , material etc comp. | 1 | No. | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.81 MB
BOQ_2147047.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].