Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAdmitted-Finance | ₹30.4 L | L1 | Admitted-Finance |
| 2 | L2₹32.7 LAdmitted-Finance | ₹32.7 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical PQC NOT FULFILL |
| Sl No | Description | Qty | Unit | MAARFAT CONSTRUCTION L2 | M/s Sarkar Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Boiler furnace Ist Pass & IInd Pass | 165 | M2 | 1,913 ₹3.2 L | 1,777 ₹2.9 L |
| 2.00 | Steam/water piping of dia. above 100 mm. | 115 | M2 | 2,636 ₹3.0 L | 2,448 ₹2.8 L |
| 3.00 | Flue gas duct. Expansion / bellows in duct, APH hoppers ESP. | 135 | M2 | 1,611 ₹2.2 L | 1,496 ₹2.0 L |
| 4.00 | Hot air duct (Primary and Secondary) | 115 | M2 | 1,910 ₹2.2 L | 1,775 ₹2.0 L |
| 5.00 | Steam / water / oil piping of dia. up to 100mm | 115 | M2 | 1,670 ₹1.9 L | 1,551 ₹1.8 L |
| 6.00 | Valves having dia. | - | - | - | - |
| 6.01 | 25mm to 40mm | 14 | Nos. | 1,658 ₹23,212 | 1,540 ₹21,560 |
| 6.02 | 50mm to 100mm | 14 | Nos. | 2,227 ₹31,178 | 2,068 ₹28,952 |
| 6.03 | 150mm to 200mm | 7 | Nos. | 2,470 ₹17,290 | 2,294 ₹16,058 |
| 6.04 | 250mm to 300mm | 7 | Nos. | 2,606 ₹18,242 | 2,420 ₹16,940 |
Updated dates
Tender Value
₹29.8 L
EMD Value
₹50,000
Closing Date
31 Jan 2026, 1:00 pmClosed
SE OMC II DTPS Kasimpur Aligarh
Office of the SE OMC II DTPS Kasimpur Aligarh Mobile No 9415900792
Biennial Contract for Insulation and Refractory work in unit 7 8 and 9 HTPS Kasimpur
2025_RVUNL_1100552_1
ET-23/OMC-II/BMD-I/DTPS/25-26
Open Tender
Repair and Maintenance Works
730 days
HTPS Kasimpur
As per PQC of Tender Documents
4 documents required · 4 mandatory
₹3,540
SAO EPAD HTPS KASIMPUR ALIGARH
₹50,000
17 Feb 2026
20 Dec 2025
2 Feb 2026
20 Dec 2025
31 Jan 2026
20 Dec 2025
20 Dec 2025 - 30 Jan 2026
Boiler furnace Ist Pass & IInd Pass
Steam/water piping of dia. above 100 mm.
Flue gas duct. Expansion / bellows in duct, APH hoppers ESP.
Hot air duct (Primary and Secondary)
Steam / water / oil piping of dia. up to 100mm
Valves having dia.
25mm to 40mm
50mm to 100mm
150mm to 200mm
250mm to 300mm
Removal of old and damaged refractory from installed side by breaking it & then cleaning the area & collecting at desired place at zero meter level/scrap yard/garbage by him. Firm has make own arrangement to down the refractory from the floor of boiler & disposal to dump yard.
Recasting of refractory including the welding of MS rod. Lifting of refractory from site/central store to work place is included in scope of work. Firm will have to made arrangement of lifting up refractory up to boiler false roof On his own cost. (MS rod & refractory to be supplied by the dept. free of cost).
Insulation work of ESP area.
Sheet metal covering
Flue gas duct (I D fan inlet to chimney)
Hot air duct (Primary and Secondary)
Supply and fixing of 50 mm thick L.R.B. insulation pads in triple layer i.e. 100 mm with applying new aluminum sheet of 20/22 gauge.
Supply and fixing of 50 mm thick L.R.B. insulation pads in triple layer i.e. 150 mm with applying new aluminum sheet of 20/22 gauge.
Complete spray insulation and repair of spray insulation on following equipments including supply of self setting ce-ment compound, spray wool alkali silicate binder retainers, N. S. plate, aluminum shields, S.S. and GI wire nettings, removal of old and damaged insulation, re-fixing of end shields, plastering and finishing as per BHEL norms and specifications:- a) H.P. casing 315 to 380mm thickness. b) IP casing 315 to 380 mm thickness. c) ESV & HO control valves 315 mm thickness. d) Interceptor valves & I.P. control valves 315 mm thick-ness. e) LP bye-pass, stop and control valves 315 mm thick-ness. All the above equipments including their end shield on front and rear side.
Dismantling of insulation including removal of sheet metal cladding/plastering
Laying of insulation by mineral wool pads/Loose glass wool for 60mm thick insulation of density 120Kg./m3
Plastering over the damaged plaster of insulation
Sheet metal covering
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
TenderSpecificationET23INSULATION.pdf
Tender Documents • 1.54 MB
BOQ_2028141.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid