Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76,302Accepted-AOC VILL PARBIRHATA P O SRIPALLY DIST PURBA BARDHAMAN | PURBA BARDHAMAN | WEST BENGAL | ₹76,302 | L1 | Accepted-AOC L1 |
| 2 | L2₹76,718+₹416 (0.55%)Rejected-Finance 31 PARKAS ROAD BURDWAN | HOWRAH | WEST BENGAL | 711101 | ₹76,718+₹416 (0.55%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹76,999+₹697 (0.91%)Rejected-Finance | ₹76,999+₹697 (0.91%) | L3 | Rejected-Finance 3RD LOWEST |
| Sl No | Description | Qty | Unit | CHATTERJEE DECORATORS L2 | BHOWMIK DECORATOR L1 | Biswapriya Decorator L3 |
|---|---|---|---|---|---|---|
| 1.00 | Hire and labour charges for erection of pandel for counters of distribution and receiving of polling materials with strong sallballha/ bamboo structure with tarpaulin shed , 3 side cover with blue drill , front and both side top cover with blue drill, ceiling with cloth , low height partition with bamboo frame and cloth for all sides of each counter including bamboo barricade as required in front and all side of counter. Including provision of 6 chairs and 2 Nos(4’ x 3’ size) tables in each counter and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. | 1 | Sqm | 146 ₹146 | 143 ₹143 Lowest | 147 ₹147 |
| 1.10 | Rate for Hire charges only 0n material Beyond 4days Per Day | 1 | Sqm | 35 ₹35 | 33 ₹33 Lowest | 36 ₹36 |
| 2.00 | Hire and labour charges for erection of pandel for other counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling back side full cover with blue drill, front and both side top cover with blue drill, front and both side cover with 3’-0’’ high low height partition with both side cloth including bamboo structure and bamboo barricade as required. Including provision of 2 Nos (4’ x 3’ size) table & 4 chairs in each counter including cutting drain in all side counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. | 1 | Sqm | 140 ₹140 | 137 ₹137 Lowest | 141 ₹141 |
| 2.10 | Rate for Hire charges only 0n material Beyond 4days Per Day | 1 | Sqm | 34 ₹34 | 32 ₹32 Lowest | 35 ₹35 |
| 3.00 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete a) With 3 side cover with blue drill . Rate for hire and labour charges including carriage up to 4 days. | 1 | Sqm | 127 ₹127 | 125 ₹125 Lowest | 128 ₹128 |
| 3.10 | Rate for Hire charges only 0n material Beyond 4days Per Day | 1 | Sqm | 33 ₹33 | 31 ₹31 Lowest | 34 ₹34 |
| 4.00 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete b) With 3 side cover with hessian. Rate for hire and labour charges including carriage up to 4 days. | 1 | Sqm | 99 ₹99 | 97 ₹97 Lowest | 100 ₹100 |
| 4.10 | Rate for Hire charges only 0n material Beyond 4days Per Day | 1 | Sqm | 24 ₹24 | 22 ₹22 Lowest | 25 ₹25 |
| 5.00 | Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. c) With 3 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. | 1 | Sqm | 184 ₹184 | 180 ₹180 Lowest | 185 ₹185 |
| 5.10 | Rate for Hire charges only 0n material Beyond 4days Per Day | 1 | Sqm | 45 ₹45 | 42 ₹42 Lowest | 46 ₹46 |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
28 Mar 2026, 1:00 pmClosed
BLOCK DEVELOPMENT OFFICER RAINA-I
RAINA-I DEVELOPMENT BLOCK, SHYAMSUNDAR, PURBA BARDHAMAN, PIN-713424
Erection of Temporary structures for Distribution and Collection Centre, Vehicle, Police Tagging, Commissioning for 261 Raina SC AC at Shyamsundar College under Raina-I Development Block i.c.w WBLA-2026 under Purba Bardhaman District
2026_ZPHD_1023341_1
WB/RAINA-I/BDO/Elec./NIT-186
Open Tender
CIVIL WORKS
Item Rate
30 days
RAINA-I DEVELOPMENT BLOCK
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,000
22 May 2026
21 Mar 2026
30 Mar 2026
21 Mar 2026
28 Mar 2026
21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Hire and labour charges for erection of pandel for counters of distribution and receiving of polling materials with strong sallballha/ bamboo structure with tarpaulin shed , 3 side cover with blue drill , front and both side top cover with blue drill, ceiling with cloth , low height partition with bamboo frame and cloth for all sides of each counter including bamboo barricade as required in front and all side of counter. Including provision of 6 chairs and 2 Nos(4’ x 3’ size) tables in each counter and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. | |||||
| 1.1 | Rate for Hire charges only 0n material Beyond 4days Per Day | - | Sqm | - | - |
| 2Hire and labour charges for erection of pandel for other counters with strong Salballah/ bamboo structure with tarpaulin shed with cloth ceiling back side full cover with blue drill, front and both side top cover with blue drill, front and both side cover with 3’-0’’ high low height partition with both side cloth including bamboo structure and bamboo barricade as required. Including provision of 2 Nos (4’ x 3’ size) table & 4 chairs in each counter including cutting drain in all side counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. Rate for hire and labour charges including carriage up to 4 days. | |||||
| 2.1 | Rate for Hire charges only 0n material Beyond 4days Per Day | - | Sqm | - | - |
| 3Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete a) With 3 side cover with blue drill . Rate for hire and labour charges including carriage up to 4 days. | |||||
| 3.1 | Rate for Hire charges only 0n material Beyond 4days Per Day | - | Sqm | - | - |
| 4Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete b) With 3 side cover with hessian. Rate for hire and labour charges including carriage up to 4 days. | |||||
| 4.1 | Rate for Hire charges only 0n material Beyond 4days Per Day | - | Sqm | - | - |
| 5Hire and labour charges for erection of pandel with strong sal ballah /bamboo structure with tarpaulin shed including ceiling with cloth including bamboo barricade as required With front and both side top cover with blue drill including cutting drain in all side of counters and cutting drain in all side of counters and dressing, chilchilling and cleaning counter area complete. c) With 3 side cover with CGI sheet. Rate for hire and labour charges including carriage up to 4 days. | |||||
| 5.1 | Rate for Hire charges only 0n material Beyond 4days Per Day | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
AnnexureA.pdf
Tender Documents • 3.84 MB
BOQ_2515210.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .