| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.8 LAccepted-AOC | ₹15.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹20.1 L+₹4.3 L (27.2%)Rejected-AOC | ₹20.1 L+₹4.3 L (27.2%) | 2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical 1 No experience of similar works during last 07 years 2 No valid work order in similar works in last 5 years is submitted |
| 4 | Rejected-Technical 173 SHAMLI SHIV VIHAR RAIL PAR SHAMLI UTTAR PRADESH 247776 | SHAMLI | UTTAR PRADESH | 247776 | - | - | Rejected-Technical 1 Signed Integrity Pact on Rs 200 stamp paper is not submitted 2 Registered office is not in Mumbai or Navi Mumbai |
| 5 | Rejected-Technical UNIT NO 7 AARKAY GOLD INDUSTRIAL ESTATE BILALPADA NEAR CHINCHPADA WALIV VASAI EAST DIST PALGHAR THANE MAHARASHTRA 401208 | PALGHAR | MAHARASHTRA | 401208 | - | - | Rejected-Technical 1 Signed Integrity Pact on Rs 200 stamp paper is not submitted 2 No documents submitted by the bidder for any prequalification criteria |
Tender Value
₹15.3 L
EMD Value
₹30,600
Closing Date
27 Mar 2024, 3:00 pmClosed
M. K. Gupta, DGM
DPSP, NABARD, Head Office, Plot C-24, G Block, Bandra Kurla Complex, BKC Road, Bandra East, Mumbai, Maharashtra-400051
Work of Installing of FRP Sunshades over Windows of 5A, 5B, 5C, 5D and 5E Buildings, NABARD Staff Quarters, Damodar Park, Ghatkopar(W), Mumbai
2024_NABA_799399_1
NB.DPSP/2565/FRP Sunshades/DP,Ghatkopar/2023-24
Open Tender
Civil Works - Others
Item Rate
120 days
NABARD Staff Quarters, Damodar Park, Ghatkopar(W)
Please refer Tender Document
2 documents required · 2 mandatory
₹0
₹30,600
Yes
NABARD Head Office, BKC, Mumbai
29 Apr 2024
7 Mar 2024
28 Mar 2024
7 Mar 2024
27 Mar 2024
7 Mar 2024
20 Mar 2024
Amount
SCAFFOLDING ON ALL FLOORS: Providing and fixing double scaffolding system (cup lock type) on the exterior side, on all floors made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.
SCAFFOLDING NET: Providing and fixing Scaffolding net of required width made of high density Polyethylene UV stabilized knitted on warp knitting machines having density 100grams/sqm and shading coefficient minimum 75% around the construction site/ for vertical extension as per requirement including fastening/tying with building/scaffolding pipes or with any other fixtures etc. complete as per direction of Engineer-in-Charge. (One time payment shall be made for providing Scaffolding net from start of work till completion of work including shifting if any. The Scaffolding net shall be the property of the contractor on completion of the work)
INSTALLATION OF FACTORY-MADE F.R.P. SUNSHADES: Providing and fixing factory made Fiberglass Reinforced plastics (F.R.P.) chajja 4 mm thick of required colour, size and design made by Resin Transfer Moulding (RTM) Machine Technology, resulting in void free compact laminate in single piece, having smooth gradual slope curvature for easy drainage of water and duly reinforced by 2 nos vertically and 1 nos horizontally 50x2 mm thick M.S. flat with 12 mm in built hole for grouting on the existing wall along with the 50 mm flanges duly inserted and sealed in the wall complete in one single piece casted monolithically, including all necessary fittings. The FRP Chajja should be manufactured using unsaturated Polyester resin as per IS:6746, duly reinforced with fibre glass chopped strand mat (CSM) as per IS:11551 complete with protective Gel coat U/V coating on Top for complete resistance from the extreme of temperature, weather & sunlight (Only plan area of chajjas shall be measured for making payment). Note: - The debris generated during its installation has to be disposed-off as per instructions of Bank.
Sanico Sanitation
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .