| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL BID PAPER |
| 2 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL BID PAPER |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
12 May 2026, 3:00 pmClosed
se bundelkhand circle upavp jhansi
se bundelkhand circle upavp jhansi
TOURISM DEVELOPMENT AND BEAUTIFICATION OF PARVATI SHIV TEMPLE AT LATHWARA IN DISTT. JHANSI (UP)
2026_UPHDB_1139684_1
136/AC-3/12 DATE 16.04.2026 SI 9
Open Tender
Civil Works
Percentage
90 days
PARVATI SHIV TEMPLE AT LATHWARA IN DISTT. JHANSI (
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,310
EXECUTIVE ENGINEER CD BUNDELKHAND 01 UPAVP JHANSI
₹3.0 L
22 May 2026
20 Apr 2026
12 May 2026
20 Apr 2026
12 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. DAR 2.6.1 | - | CUM | - | - |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2.27 | - | CUM | - | - |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (DSR-4.1.8) | - | CUM | - | - |
| 4 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration DSR 2.35.3.1 | - | SQM | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Plinth beam) DSR 5.1.2 | - | CUM | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Raft foundation) DSR 5.1.2 | - | CUM | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Column) DSR 5.1.2 | - | CUM | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Slab) DSR 5.3 | - | CUM | - | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).Slab beam DSR 5.3 | - | CUM | - | - |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Column DSR 5.2.2 | - | CUM | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
FINCHNINE.pdf
Tender Documents • 1.00 MB
TECHNINE.pdf
Tender Documents • 11.63 MB
BOQ_2127972.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .