| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.3 LAdmitted-Finance | -35.01% | ₹18.3 L | L1 | Admitted-Finance |
| 2 | L2₹18.5 L+₹28,659.35 (1.57%)Admitted-Finance G 16 1 2ND FLOOR SECTOR 15 ROHINI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | -33.99% | ₹18.5 L+₹28,659.35 (1.57%) | L2 | Admitted-Finance |
| 3 | L3₹19.5 L+₹1.3 L (6.92%)Admitted-Finance | -30.51% | ₹19.5 L+₹1.3 L (6.92%) | L3 | Admitted-Finance |
| 4 | L4₹20.2 L+₹2.0 L (10.8%)Admitted-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | -28.00% | ₹20.2 L+₹2.0 L (10.8%) | L4 | Admitted-Finance |
| 5 | L5₹22.0 L+₹3.7 L (20.2%)Admitted-Finance | -21.87% | ₹22.0 L+₹3.7 L (20.2%) | L5 | Admitted-Finance |
Tender Value
₹28.1 L
EMD Value
₹56,195
Closing Date
5 Aug 2026, 3:00 pmClosed
EE,NMD-3,DDA
EE,NMD-3,DDA
Providing and fixing of 3 Nos Stainless Steel main entry gate and 12 Nos Staircase entrance gate, Providing and fixing of F.R.P. chajja at remaining flats and repairing of floor near electricity meter at Ground floors at pocket A2, Lawrence Road.
2026_DDA_919785_1
23/EE/NMD-3/DDA/2026-27
Open Tender
Civil Works
Works
45 days
ASHOK VIHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹56,195
11 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 8.14 | cum | 2,434.25 | ₹19,814.8 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 12.6 | cum | 7,294.7 | ₹91,913.22 |
| 3 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete. | 126 | sqm | 978.45 | ₹1,23,284.7 |
| 4 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 2.61 | cum | 3,551.25 | ₹9,268.76 |
| 5 | Providing and fixing factory made Fiberglass Reinforced Plastic (F.R.P.) Chhajja 4mm thick of required colour size and design made of Resin Transfer moulding (RTM)Machine technology, resulting in void free compact laminate in single piece, having smooth gradual slope curvature for easy drainage of water and duly reinforced by 2 nos vertically and 1 no horizontally mm thick MS flat with 12mm inbuilt hole for grouting on the existing wallalongwith 50mm flangesduly inserted and sealed in the wall completein one single piece casted monolithically, including all necessary fittings. The FRP chhajja should be manufactured using unsaturated polyester resin as per IS: 6746, duly reinforced with fiber glass chopped strand mash (CSM) as per IS:11551 complete with protective Gel coat U/V coating on top for complete resistance from the extreme of tempetrature, weather & sunlight (only plan area of chhajjas shall be measured for making payment) | 29.52 | sqm | 5,207.45 | ₹1,53,723.92 |
| 6 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.
Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 1,200 | sqm | 338.25 | ₹4,05,900 |
| 7 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 29.52 | sqm | 1,147.2 | ₹33,865.34 |
| 8 | Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-incharge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). | 2,507.19 | kg | 772.4 | ₹19,36,553.56 |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 400 | kg | 172.6 | ₹69,040 |
| 10 | Credit of M.S. Gate / Reinforcement bar complete .The material so received shall be the property of contractor after dismantling, duly weighed / measured before removing from the site in the presence of Engineer - in - charge or his authorised representative all complete. and nothing extra shall be paid. | 996 | kg | 40 | ₹39,840 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
NIT23.pdf
Tender Documents • 1.74 MB
BOQ_966595.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .