Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹140.6 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹161.0 Cr+₹20.4 Cr (14.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹168.5 Cr+₹27.9 Cr (19.9%)Admitted-Finance 1 7 80 TO 87 MITHONA TOWERS 1 PRENDERGHAST ROAD SECUNDERABAD HYDERABAD TELANGANA 500003 | HYDERABAD | TELANGANA | 500003 | L3 | Admitted-Finance | |
| 4 | L4₹175.9 Cr+₹35.3 Cr (25.1%)Admitted-Finance 2 1 RUSSEL STREET 5TH FLOOR KANKARIA CENTRE KOLKATA WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700071 | L4 | Admitted-Finance | |
| 5 | L5₹211.5 Cr+₹70.9 Cr (50.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VASCON ENGINEERS LTD L5 | Relcon Infraprojects Ltd L2 | Kunal Structure India Pvt. Ltd. L1 | BRIDGE AND ROOF COMPANY (INDIA) LIMITED L4 | Tata Projects Limited L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00A EARTHWORK General Note : 1) The contractor at his own expenses shall put up the necessary shoring, strutting and planking or cut slopes with or without steps, to a safer angle or both with due regard to the safety of the personnel and works and to the satisfaction of the Engineer-in-Charge. No extra payment shall be made to the contractor for the same. 2) Lead to be measured from the nearest boundary of the building up to the respective point of disposal by shortest motorable route. 3) All treasures, artifacts, precious metals, utensils, whether ancient or modern, found during the excavation work, should be handed over by the Contractor to the Owner / Employer. 4) The contractor should also make sure that the wheels / tyres of the hauling vehicle are adequately cleaned with water prior to leaving the site so that no mud / dirt tracks are smudged during transit outside the site premises. 5) Selected top soil shall be stored in plot area if so directed by the Engineer-in-Charge 6) Rate for excavation in hard rock to include cost of chiseling (manual / mechanical) (wherever applicable) and breaking upto smaller pieces (average 230mm size) to rubble soling size or as directed. 7) Adequate steps must be adopted to safeguard environmental norms. 8) The contractor's scope shall include for proper study & investigation of the rock structure & assessment of the implications of excavation on the strata in the surrounding buildings. Any anomalies or discrepancies shall be reported to the Engineer-in-Charge before proceeding ahead for procuring approval from the Engineer-in-Charge. 9) The contractor’s quoted rate shall include for providing and maintaining necessary dewatering system comprising of pump sets of adequate capacity, flexible or hard drainage piping system to drain out pumped water & accumulated ground / rain water at locations approved by the Engineer-in-Charge-in-charge, all labour, plants & energy (fuel or electric as the case may be) as per the type of system & methodology approved and as directed by the Engineer-in-Charge so as to ensure that the excavated pit is maintained dry . 10) Measurement : (i) The length and breadth of excavation shall be measured correct to the nearest cm. The depth of cutting shall be measured , correct to 5 mm, by recording levels for each layer of excavation before the start of the work and after the completion of the work. The cubical contents shall be worked out to the nearest two places of decimal in cubic metres. (ii) Excavation for basement raft at a depth of more than 1.5 metre from the NGL, all round excavation as shown in the drawings shall be measured for payment which shall be inclusive of allowance for centering and shuttering. Additional excavation beyond this limit shall be at the risk and cost of the contractor and shall not be measured for payment. On completion of the substructure work, the contractor shall dis-assemble the entire installed dewatering system and dispose it off. The rate quoted by the contractor shall be inclusive of necessary salvage value for the dewatering system. | ||||||||
| 2.00A-1 EARTHWORK IN MASS EXCAVATION FOR FOUNDATION / BASEMENT in all kinds of soils / weathered & soft rock / hard rock / concrete / old masonry etc. by mechanical means using hydraulic excavators, pneumatic breaking equipments, JCB, Poclains etc. to required level for all lifts & an initial lead of 50 metres in both dry and wet conditions, including stripping of any top loose soil, slush removal at locations as directed, cutting, chipping and chiseling of rock, spreading & leveling, ramming and consolidating. the bottom of excavated area to the required level and grade, dressing the sides of excavation wherever indicated and as required, unloading & double handling, cleaning the surface thoroughly for blinding concrete, and working in or under water/and/or liquid mud/slush and in or under foul positions if any, shoring, strutting, under pinning, ramming and including any additional excavation required for working space, taking necessary precautions to prevent any spillages or spoiling of the site premises / public roads during the entire process etc. complete as per the technical specifications, detailed drawings and as directed by the Engineer. The rate shall include for designing, supplying, installing and maintaining dewatering system to keep the entire excavated area dry during basement / sub-structure works and till completion as per instructions of the Engineer A-1.1 Earth work excavation by mechanical means (Hydraulic excavator) /manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge | ||||||||
| 3.00 | A-1.1.1 From 0.00 to 1.50 m depth from Average Ground Level | 1,06,590 | cum. | 294 ₹3,13,37,460 | 192 ₹2,04,65,280 | 125 ₹1,33,23,750 Lowest | 138 ₹1,47,09,420 | 128 ₹1,36,43,520 |
| 4.00 | A-1.1.2 Extra over A-1.1.1 for every additional depth of 1.50 m or part thereof in all kinds of soil | 71,070 | cum. | 138 ₹98,07,660 | 52 ₹36,95,640 | 35 ₹24,87,450 | 21 ₹14,92,470 | 15 ₹10,66,050 Lowest |
| 5.00A-1.2 Earth work excavation by mechanical means (Hydraulic excavator) manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge. | ||||||||
| 6.00 | A-1.2.1 From 0.00 to 1.50 m depth from Average Ground Level | 1,12,163 | cum. | 407 ₹4,56,50,341 | 271 ₹3,03,96,173 | 188 ₹2,10,86,644 Lowest | 345 ₹3,86,96,235 | 273 ₹3,06,20,499 |
| 7.00 | A-1.2.2 Extra over Item A-1.2.1 for every additional depth of 1.50 m or part thereof in Soft rock | 4,07,524 | cum. | 219 ₹8,92,47,756 | 100 ₹4,07,52,400 | 72 ₹2,93,41,728 | 56 ₹2,28,21,344 | 31 ₹1,26,33,244 Lowest |
| 8.00A-1.3 Earth work excavation in foundation in Hard Rock by Chiselling and / or by mechanical means (Hydraulic excavator) / Manual means including dewatering if necessary, dressing the sides, ramming the bottom, and stacking and / or disposing within a distance of 200 m and filling the sides of foundation with available selected excavated earth in layers not exceeding 500 mm in depth, each layer well rammed and consolidated etc.complete all as per specifications and as directed by the Engineer-in-Charge. | ||||||||
| 9.00 | A-1.3.1 From 0.00 to 1.50 m depth from Average Ground Level | 24,457 | cum. | 1,032 ₹2,52,39,624 | 669 ₹1,63,61,733 | 486 ₹1,18,86,102 Lowest | 793 ₹1,93,94,401 | 801 ₹1,95,90,057 |
| 10.00 | A-1.3.2 Extra over Item A-1.3.1 for every additional depth of 1.50 m or part thereof in Hard rock | 1,53,493 | cum. | 325 ₹4,98,85,225 | 40 ₹61,39,720 Lowest | 73 ₹1,12,04,989 | 90 ₹1,38,14,370 | 60 ₹92,09,580 |
Tender Value
₹151.5 Cr
Closing Date
11 Mar 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive, Nuclear Recycle Board
Nuclear Recycle Board, BARC, Anushaktinagar, Mumbai-85
Construction of Block-122 along with Excavation of Block -118 and allied works at INRPC, NRB, BARC, Tarapur
2021_NRB_663625_1
BARC/NRB/INRPC/PTC94/2021/912A
Open Tender
Civil Works
Item Rate
1080 days
BARC Tarapur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
PD Office, INRPC, NRB, BARC Tarapur
28 Jun 2022
21 Dec 2021
14 Mar 2022
21 Dec 2021
11 Mar 2022
4 Mar 2022
21 Dec 2021 - 7 Jan 2022
11 Jan 2022
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 3 | A-1.1.2 Extra over A-1.1.1 for every additional depth of 1.50 m or part thereof in all kinds of soil | 71,070 | - | - | - |
| 4 | A-1.2 Earth work excavation by mechanical means (Hydraulic excavator)
manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m complete as per specifications and as directed by the Engineer-in-charge.
A-1.2.1 From 0.00 to 1.50 m depth from Average Ground Level | 1,12,163 | - | - | - |
| 5 | A-1.2.2 Extra over Item A-1.2.1 for every additional depth of 1.50 m or part thereof in Soft rock | 4,07,524 | - | - | - |
| 6 | A-1.3 Earth work excavation in foundation in Hard Rock by Chiselling and / or by mechanical means (Hydraulic excavator) / Manual means including dewatering if necessary, dressing the sides, ramming the bottom, and stacking and / or disposing within a distance of 200 m and filling the sides of foundation with available selected excavated earth in layers not exceeding 500 mm in depth, each layer well rammed and consolidated etc.complete all as per specifications and as directed by the Engineer-in-Charge.
A-1.3.1 From 0.00 to 1.50 m depth from Average Ground Level | 24,457 | - | - | - |
| 7 | A-1.3.2 Extra over Item A-1.3.1 for every additional depth of 1.50 m or part thereof in Hard rock | 1,53,493 | - | - | - |
| 9 | A-2.2 Lead charges for lead exceeding 3 KM but not exceeding 4 KM, by mechanical transport including loading, unloading, stacking / levelling etc.
A-2.2.1 Soil | 86,590 | - | - | - |
| 11 | A-3.1 Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for pre-constructional anti-termite treatment and creating a chemical barrier under and all around the masonry pits, masonry foundations, wall trenches, plinth filling, junctions of wall and floor, expansion joints, surfaces of RCC works for a depth of min. 500mm from the finished ground level, foundation pit bottom & sides, surrounding of pipes, conduits etc., walls retaining soil above floor level, apron and drain along the perimeter of the building including all byeworks complete as per specification / IS 6313:2001 or latest revision
and direction of Engineer in charge (only ground floor plinth area of the building will be measured for the payment in the following three stages. i) 20% after completion of the foundations ii) 50% after completion of the ground floor flooring iii) 30% after completion of all treatment works including ground floor doors & windows. Work to be executed by an approved agency and specified guarantee for 10 (ten) years shall be furnished by the tenderer. Payment will be cleared only after submission of guarantee
Note :1) Guarantee for the treatment for a period 10 (ten) years shall be submitted as per specifications.
2) The plinth area of the ground floor only shall be measured for payment excluding area of portico, chajja, ramp, shafts,etc.
3) Work shall be carried out by an approved specialised agency. | 11,000 | - | - | - |
| 12 | A-3.2 Supplying and injecting with approved quality chemical emulsion at the rates and concentrations as per IS 6313-2001 Part II for pre-constructional anti-termite treatment and creating a chemical barrier under sub-base layer of PCC for open excavated area
Note :1) Guarantee for the treatment for a period 10 (ten) years shall be submitted as per specifications.
2) The plinth area of the ground floor only shall be measured for payment excluding area of portico, chajja, ramp, shafts,etc.
3) Work shall be carried out by an approved specialised agency. | 5,600 | - | - | - |
| 13 | A-4 Filling in plinth & foundation trenches, under floors / grade slabs / on top of raft slabs or any other location as directed with approved available excavated murrum / earth including loading, mechanical transportation from the location of storage / stacking within the premises of DAE, unloading, levelling, spreading in layers of maximum 150 mm depth, watering & compacting by mechanical means to achieve minimum 98% of Standard Proctor Density, all equipment, labour, supervision etc. complete as per drawings, specifications and directions of the Engineer-in-Charge
Note: a) Only compacted volume will be measured and paid.
b) Selected / approved excavated stuff stored within the DAE premises shall be issued free of cost to the contractor for filling purposes. The soft / hard rock obtained from DAE premises shall be used for filling after breaking/crushing the same to size not exceeding 150 mm in any directions for the lower courses of fill and mixed with properly graded fine material consisting of decomposed rock, murrum or selected earth to fill up the voids and the mixture shall be used for filling. The contractor shall install necessary mobile crushers of adequate capacity to this effect without any extra cost to the Owner. | 40,000 | - | - | - |
| 14 | A-5 Filling in plinth & foundation trenches, under floors / grade slabs / on top of raft slabs or any other location as directed with approved murrum brought from outside sources, spreading in 150 mm thick layers, watering & consolidating with mechanical compactors to achieve minimum 98% of Standard Proctor Density etc.and finished to the desired levels for all leads etc. complete for all leads as directed by the Engineer-in-Charge.
Note : a) The contractor’s quoted rate shall include the royalty as per the prevailing Government rates. Any increase in prevailing rate of Royalty shall be borne by the Contractor at no extra cost to the Owner.
b) Only compacted volume will be measured and paid. | 8,375 | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.80 MB
Tendernotice_1.pdf
Tender Document • 2.80 MB
TenderBook.pdf
Tender Document • 22.18 MB
TechnicalBid.xls
Tender Document • 0.20 MB
BOQ_698555.xls
BOQ • 0.41 MB
BOQ_698555.xls
BOQ • 0.37 MB
TenderBook.pdf
Tender Documents • 22.18 MB
TechnicalBid.xls
Tender Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .