Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -15.10% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 L+₹1.9 L (33.1%)Admitted-Finance | +13.00% | ₹7.8 L+₹1.9 L (33.1%) | L2 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹13,820
Closing Date
2 Jun 2026, 6:00 pmClosed
Executive Officer
Municipal Board Sheoganj
1. Repairing and Construction of Nallah in khadiyawas in Nagarpalika Sheoganj.
2026_DLB_562514_1
NPS/E-Nivida/2026-27/768 Date 16-05-2026
Open Tender
Civil Works
Percentage
30 days
Municipal Board Sheoganj
1. Repairing and Construction of Nallah in khadiyawas in Nagarpalika Sheoganj.
3 documents required · 3 mandatory
₹500
Executive Officer, MDRISL
₹13,820
Yes
8 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. 4.2.1 In all type of soil | 78.75 | Cum | 235.5 | ₹18,545.63 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 5 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size) | 15 | Cum | 4,575 | ₹68,625 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:4 (1 cement : 4 coarse sand) | 47.25 | Cum | 4,860 | ₹2,29,635 |
| 4 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 30.3.2 75mm thick | 60 | Sqm | 792 | ₹47,520 |
| 5 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 32.1.2 1:6 (1 cement : 6 fine/ coarse sand). | 150 | Sqm | 213.5 | ₹32,025 |
| 6 | Neat cement punning | 150 | Sqm | 52.1 | ₹7,815 |
| 7 | Stone slab roofing on ground floor with fine grained stone slab 90mm average thickness from approved quarry including filling of joints slab in cement sand mortar 1:4 with ceiling pointing in cement sand mortar 1 : 3 complete as per specification for span: 31.61.3 Above 2.50 metre and up to 3.00 metre. | 150 | Sqm | 1,362 | ₹2,04,300 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm. | 15 | Cum | 5,510 | ₹82,650 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.15 MB
NITVikas04.PDF
Tender Documents • 4.13 MB
BOQ_1000916.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .