| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.0 CrAccepted-AOC 142 | ₹9.0 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹9.3 Cr+₹25.2 L (2.80%)Rejected-Finance CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹9.3 Cr+₹25.2 L (2.80%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹11.0 Cr+₹2.0 Cr (21.7%)Rejected-Finance | ₹11.0 Cr+₹2.0 Cr (21.7%) | L-3 | Rejected-Finance L-3 |
Tender Value
₹14.6 Cr
EMD Value
₹29.2 L
Closing Date
7 Nov 2022, 12:00 pmClosed
SUPERINTENDING ENGINEER
DRAINAGE CIRCLE, ALIGARH
Construction of Inter Connecting Regulator at Km. 228.451 And Renovation of Mundakheda Ghat On U.G.C. and P.U.G.C. For 43 Cusec water supply to T.H.D.C. Khurja , Distt. Bulandshahr
2022_UPIDC_743028_1
08/SE/2022-23
Open Tender
Civil Works
Item Wise
365 days
Construction of Inter Connecting Regulator at Km
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹29.2 L
30 Jan 2023
1 Nov 2022
7 Nov 2022
1 Nov 2022
7 Nov 2022
1 Nov 2022
Amount
Earth work in filling and removing for Ring Bundh of canal with carriage earth up to 1 Km. distance by power transport including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge.
Earth work in cutting for making diversion and back filling the same in ordinary soil with proper ramming, dressing ,mechanicaly compaction including all cost of material, Labour and T&P etc. for proper completion of work as directed by Engineer In- charge.
Dewatering of foundation by 5 BHP including all cost of materials, labour and T&P etc. for proper completion of job as per direction by Engineer in-charge.
Dismantling of old Brick or stone Work i/c labour, T&P etc. completion of work.
Earth work in excavation mixed with dry wet or under water including Ramming and dressing the surface to the required levels slope and also including all lead & lifts.
Supplying and laying fine sand(1.25FM) in deep areas & below the raft foundation including all cost of material, labour and T&P et.
Providing and laying Cement concrete M15 (1:2:4) with cement , coarse sand , and 25mm to 10mm stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying porous Cement concrete M15( 1:2:4) with cement and , coarse sand including cost of all material, labour and T&P etc.complete.
Providing and laying R.C.C M25 (1:1:2) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying R.C.C M30 (Design mix) with cement , coarse sand , and 10-20mm stone grit including cost of all material, labour and T&P etc.complete.
Centering and shuttering for R.C.C. work including all cost of material, labour and T&P etc.
Centering and shuttering for for C.C. Block including all cost of material, Labour and T&P etc.
Steel Reinforcement including bending , binding , cutting , and placing at position including all cost of material , labour and T&P etc. complete.
200 MM graded filter of coarse sand below C.C blocks including all cost of material, labour and T&P etc.
200 MM Graded filter of 4-10 mm pea gravel below C.C blocks including all cost of material, labour and T&P etc.
200 MM Graded filter of 10-20 mm pea gravel below C.C blocks including all cost of material, labour and T&P etc.
Supplying and laying Boulder in Apron in bed and side slopes including cost of all material, Labour and T&P etc. complete.
Supplying and Fixing 75 mm dia P.V.C. pipe 6kg/sq.cm mm dia as drainage spouts in bridge. Including all cost of Material Labour , T&P etc. complete.
Supply of H.D.P.E. Geo bags made of 240 GSM woven fabric confirming to 15351 (2015) of size 1.09x0.69 mtr. Filling of Geo bags with R.B.M. laying and machine sewing with geo material.
Supplying and fixing of diamond(copper) seal in position including cost of all material,Labour and T&P etc. complete
Providing and fixing Rubber water stop for lift joint of 150 mm in position including all cost of material, labour T&P all lead and lifts, cutting, forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer In-charge.
Supplying and laying tar paper bearing on abutment and piers including cost of material , labour T&P all lead and lifts cutting, forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer In-charge. .
Supplying and fixing sheet piles driving into the ground up to required depth including all cost of materials cutting, welding ,painting with bitimen including cost of all materials, Labour T&P etc. for proper completion of work.
Providing and fixing Expansion joint in bridge slab including cost of all material ( Angle iron) M.S. p;ate etc,) cutting, welding, labour and T&P required for completion of work.
Supplying fabricating and erection of structural steel gate, vertical lift crest gates, as per IS 4622 with skin plate stiffeners, ballast weight, guides, embeded parts, sill beam, fitted with stainless steel flat, track beam and sealing frame fitted with stainless steel flat, roller, rubber seals, rope drum hoist as per IS 6938-2005 Electricially operated hoist ( With inbuilt manual operation) including cost of hoisting arrangement and deckinfg etc. complete as per direction of the Engineer In-charge.
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished . (Red sand stone)
Providing and weaving G.I. wire crate of 8 SWG double knot 150X150 mm mesh of size 3.00X1.50X1.00 .placing in positions and packing boulder in them i/c all cost of material,labour and T&P etc complete. (per no)
Supplying and laying 200 Micron LDPE Film under CC lining side slope of canal i/c all cost of material,labour and T&P etc complete.
Supplying and laying coarse sand (FM 1.50 or Avobe) under CC lining side slope of canal i/c all cost of material,labour and T&P etc complete.
Supplying, fixing and extraction of sheet piles driving into the ground for making bundhas and diversion of required depth including all cost of materials cutting, welding , Labour T&P all lead and lifts, cutting forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer in-charge.
Supplying and laying 300X300X40 mm precast CC tails (M-15 ) in 1:3 CM over 10 mm Thick cement mortar in 1:5 i/c all cost of material,labour and T&P etc complete.
M/S AJAY KUMAR
M/S ARUN CONSTRUCTION
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1209110.xls
BOQ Document • 0.25 MB
107999841.pdf
Tender Document • 1.64 MB
107999843.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .