Tender Value
₹24.9 L
EMD Value
₹49,860
Closing Date
5 Sept 2026, 6:00 pm
Er. Sanjeev Sharma
XEN PWd Akhnoor
BOQ
2026_PWDJK_321816_2
e-NIT No. 45 of 2026-27 Dated 21-08-2026
Open Tender
Civil Works
Percentage
120 days
Doomi
NIT
2 documents required · 2 mandatory
₹600
XEN PWD Akhnoor
₹49,860
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge. | 3.6 | cum | 2,516.85 | ₹9,060.66 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including
stacking material within 50 meters lead. | 600.86 | sqm | 89.95 | ₹54,047.36 |
| 3 | Engagment of labour for dismantling and shifting of material from one room to another | 12 | day | 500 | ₹6,000 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides an ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: | 38.4 | cum | 479.3 | ₹18,405.12 |
| 5 | Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.25 mm thick with zinc coating not less than 350 gram/m2 | 120 | sqm | 1,579.95 | ₹1,89,594 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 28.8 | CUM | 4,826.5 | ₹1,39,003.2 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size | 19.2 | CUM | 6,591.25 | ₹1,26,552 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 44.26 | CUM | 5,733.6 | ₹2,53,746.2 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.9 | cum | 7,788.4 | ₹7,009.56 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 153.6 | SQM | 286.35 | ₹43,983.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1076116.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].