| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 LAdmitted-Finance | ₹2.0 L | L2 | Admitted-Finance |
| 3 | L3₹3.8 LAdmitted-Finance | ₹3.8 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gupta Elect and Engg Works L1 | Perfect Power Transformer Associates L2 | Meena Elect & Engg. Works L3 |
|---|---|---|---|---|---|---|
| 1.00Following works are required to be carried out for erection of 40 MVA 132/33 KV Transformer at 220 KV S/S Charla under ETD-II Meerut. The Detail of work to be executed is as given below :- | ||||||
| 2.00 | Dismantling of 132/33 KV 40 MVA T/F ABB Make transformer including all mounting and accessories along with draining of required quantity of Oil from transformer at 220 KV S/S Charla | 1 | Job | 5,000 ₹5,000 | 9,950 ₹9,950 | 29,500 ₹29,500 |
| 3.00 | Shifting of damaged 40 MVA T/F ABB from plinth to safe place up to 20 Mtrs Distance including turning of tank if required. Including all T&P and work required to complete the job satisfactorily | 1 | Job | 5,000 ₹5,000 | 5,500 ₹5,500 | 20,000 ₹20,000 |
| 4.00 | Complete erection of 132/33 KV 40 MVA TF (Bharat Bijlee make repaired by TAL) by erection of radiators, conservators tank, all bushing with their turrets, connecting of all Oil pipe lines erection of cooling fans making control cable connection, buchhloz relay etc, topping up of transformer oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work. | 1 | Job | 42,500 ₹42,500 | 45,000 ₹45,000 | 49,500 ₹49,500 |
| 5.00 | Replacement of RTCC panel of this 40 MVA T/F in control room at 220 KV S/S Charla, Meerut including its termination and fitting as per site requirement and its connections. | 1 | Job | 12,500 ₹12,500 | 14,500 ₹14,500 | 13,800 ₹13,800 |
| 6.00 | Electrical connection of 40 MVA 132/33 KV T/F with laying of cable and termination in between WTI, OTI buchholz relay. Cooling fans. OLTC, Marshaling box etc. with proper feruling as per drawing. | 1 | Job | 12,000 ₹12,000 | 13,500 ₹13,500 | 1,28,000 ₹1.3 L |
| 7.00 | Earthing of main tank of 40 MVA 132/33 KV T/F by using MS flat 50x6/75x10 mm size its joints with already laid earthmat/deltas preparing neutral bushing support for its erathing including all work. | 1 | Job | 9,950 ₹9,950 | 7,500 ₹7,500 | 10,000 ₹10,000 |
| 8.00 | Centrifuging of complete T/F oil in transformer by connecting centrifuging pipes circulating the Transformer oil through Private Centrifuging machine (to be arranged by the contractor) including taking BDV & PPM value of Oil periodically till required value is achieved (App. 18500 Ltr. Oil) | 18,500 | Ltr. | 2.5 ₹46,250 | 3 ₹55,500 | 3.5 ₹64,750 |
| 9.00 | Jumpering of 40 MVA T/F HV & LV side including cutting of conductor and tightening of conductor with connector | 6 | Job | 500 ₹3,000 | 400 ₹2,400 | 600 ₹3,600 |
| 10.00 | Carriage of 20 KL Oil tank from 220 KV S/S Modipuram to 220 KV S/S Charla and return back the oil tank after completion of work. | 2 | Job | 10,000 ₹20,000 | 10,500 ₹21,000 | 15,000 ₹30,000 |
Tender Value
₹2.3 L
EMD Value
₹3,000
Closing Date
26 May 2026, 5:00 pmClosed
SE ETC Meerut
130-D Victoria Park Paareshan Bhawan, Meerut
Dismantling and shifting of defective 40 MVA TF ABB make and erection of 40 MVA TF Bharay Bijlee make repaired by TAL with all associated works at 220 KV SS Charla under ETD II Meerut
2026_UPTCL_1151170_1
T-01/2026-27/ETC/MRT
Open Tender
Electrical Works
10 days
Charla
Dismantling and shifting of defective 40 MVA TF ABB make and erection of 40 MVA TF Bharay Bijlee make repaired by TAL with all associated works at 220 KV SS Charla under ETD II Meerut
2 documents required · 2 mandatory
₹590
SE ETC Meerut
₹3,000
Yes
1 Jun 2026
20 May 2026
27 May 2026
20 May 2026
26 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Following works are required to be carried out for erection of 40 MVA 132/33 KV Transformer at 220 KV S/S Charla under ETD-II Meerut. The Detail of work to be executed is as given below :- | - | - | - | - |
| 2 | Dismantling of 132/33 KV 40 MVA T/F ABB Make transformer including all mounting and accessories along with draining of required quantity of Oil from transformer at 220 KV S/S Charla | - | Job | - | - |
| 3 | Shifting of damaged 40 MVA T/F ABB from plinth to safe place up to 20 Mtrs Distance including turning of tank if required. Including all T&P and work required to complete the job satisfactorily | - | Job | - | - |
| 4 | Complete erection of 132/33 KV 40 MVA TF (Bharat Bijlee make repaired by TAL) by erection of radiators, conservators tank, all bushing with their turrets, connecting of all Oil pipe lines erection of cooling fans making control cable connection, buchhloz relay etc, topping up of transformer oil and final oil filling in tank, radiator, conservator tank and all other associates work for completion of work. | - | Job | - | - |
| 5 | Replacement of RTCC panel of this 40 MVA T/F in control room at 220 KV S/S Charla, Meerut including its termination and fitting as per site requirement and its connections. | - | Job | - | - |
| 6 | Electrical connection of 40 MVA 132/33 KV T/F with laying of cable and termination in between WTI, OTI buchholz relay. Cooling fans. OLTC, Marshaling box etc. with proper feruling as per drawing. | - | Job | - | - |
| 7 | Earthing of main tank of 40 MVA 132/33 KV T/F by using MS flat 50x6/75x10 mm size its joints with already laid earthmat/deltas preparing neutral bushing support for its erathing including all work. | - | Job | - | - |
| 8 | Centrifuging of complete T/F oil in transformer by connecting centrifuging pipes circulating the Transformer oil through Private Centrifuging machine (to be arranged by the contractor) including taking BDV & PPM value of Oil periodically till required value is achieved (App. 18500 Ltr. Oil) | - | Ltr. | - | - |
| 9 | Jumpering of 40 MVA T/F HV & LV side including cutting of conductor and tightening of conductor with connector | - | Job | - | - |
| 10 | Carriage of 20 KL Oil tank from 220 KV S/S Modipuram to 220 KV S/S Charla and return back the oil tank after completion of work. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tenderdoc1.pdf
Tender Documents • 0.65 MB
BOQ_2156199.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid