Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹5.6 L
EMD Value
₹5,700
Closing Date
23 Nov 2026, 5:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE,RW (PH) DIVISION ,BBSR
SE,RW (PH) DIVISION ,BBSR BEHIND ESPLANDE MALL,BOMIKHAL,751010
Construction of P.H. works to Revenue Inspector s Office Cum Residence building at Manikyapur in Dharakote Block in the District of Ganjam for the year 2026-27
2026_CERWI_145783_30
EERWPH-54/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Manikyapur
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹5,700
Yes
13 Nov 2026
13 Nov 2026
25 Nov 2026
13 Nov 2026
23 Nov 2026
13 Nov 2026
13 Nov 2026 - 21 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in all kinds of soil in excavation of foundation trenches within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc all complete as per direction of the E.I.C.Initial lift upto 1.5 mtr ,3.04 m x 1.94 m x 1.50 m= | 8.85 | Cum | 306.01 | ₹2,706.96 |
| 2 | From 1.5 mtr to 3.0 mtr depth,3.04 m x 1.94 m x 0.70 m= | 4.13 | Cum | 328.49 | ₹1,356.01 |
| 3 | Supplying all materials, labour, T&P and filling in foundation and plinth with river sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per the direction of the E.I.C.3.04 m x 1.94 m x 0.15 m= | 0.88 | Cum | 1,021.6 | ₹903.09 |
| 4 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 40mm H.G metal including watering, curing and conveyance of all materials to site payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.3.04 m x 1.94 m x 0.10 m= | 0.59 | Cum | 6,409.7 | ₹3,775.31 |
| 5 | Supplying all materials, labour, T&P and providing plain cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.(3.04 m x 1.94 m x 0.10 m=0.589 cum+2.04 m x 0.94 m x 0.038 m = 0.072 Cum) | 0.66 | Cum | 8,699.9 | ₹5,750.63 |
| 6 | Supplying all materials,labour, T&P and providing Brick work with K.B.Brick having crushing strength not less than 75 Kg/CM2 with dimensional tolerence of +/- 8% in C.M(1:4) including watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.In Foundation and Plinth in C:M (1:4),2 x ( 2.74 + 0.94 ) m x 0.35 m x 1.10 m = 2.833 cum+ 2 x ( 2.50 + 0.94 ) m x 0.23 m x 0.80 m = 1.265 cum | 4.1 | Cum | 6,473.6 | ₹26,528.81 |
| 7 | In Foundation and Plinth in C:M (1:6) 1 x 0.40 m x 0.40 m x 0.60 m = 0.096 cum | 0.1 | Cum | 6,257.2 | ₹600.69 |
| 8 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.12 mm thick C.P in C:M (1:4),2 x ( 2.04 + 0.94 ) m x 1.90 m =11.324sqm + 2.04 x 0.94 m = 1.917sqm+ 4 x 0.40 x 0.60 m = 0.96 sqm | 14.2 | Sqmt | 220.5 | ₹3,131.32 |
| 9 | Supplying all materials, labour, T&P and providing cement punning on plastered surface including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.,2 x ( 2.04 + 0.94 ) m x 1.90 m =11.324sqm +2.04 x 0.94 m =1.917 sqm | 13.24 | Sqmt | 41.8 | ₹553.47 |
| 10 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. 2 x ( 2.50 + 1.40 ) m x 0.10 m = 0.78 sqm+2.04 x 0.94 m = 1.917 sqm | 2.7 | Sqmt | 769.2 | ₹2,074.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_620275.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .