Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 3₹29.7 CrAccepted-AOC | ₹29.7 Cr Quoted ₹39.1 Cr | 3 | Accepted-AOC after negotiation with ULHPPC firm is new L1 |
| 2 | 1₹38.6 CrRejected-AOC 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | ₹38.6 Cr | 1 | Rejected-AOC quoted rates after negotiations with ULHPPC are high |
| 3 | 2₹38.9 CrRejected-AOC | ₹38.9 Cr | 2 | Rejected-AOC quoted rates after negotiations with ULHPPC are high |
| 4 | 4₹92.3 CrRejected-AOC | ₹92.3 Cr | 4 | Rejected-AOC quoted rates are high |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per approval of WTD on GST issue |
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
16 Jun 2020, 3:00 pmClosed
XEN CHP
XEN CHP RGTPP KHEDAR HISAR
Annual Running Contract for Operation and Maintenance of 2400 TPH Automated Coal Handling Plant at 2 x 600 MW RGTPP HPGCL Khedar Hisar
2020_HBC_129648_1
01/RGTPP/CHP/F-265/2020-21
Open Tender
Miscellaneous
1095 days
RGTPP Khedar Hisar
as per NIT
5 documents required · 5 mandatory
₹1,180
Yes
SR AO RGTPP
₹25 L
Yes
7 Oct 2020
26 May 2020
19 Jun 2020
26 May 2020
16 Jun 2020
26 May 2020
Amount
Rates for Part A
Operation & Maintenance of Automated Coal Handling Plant involving Wagon Tippler, Apron Feeders, Dribble feeders, Conveying Systems, Transfer Chutes, Skirt Boards, Grizzly Feeders, Roller Screens, Coal Crushers, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors etc. The work also includes all types of maintenance such as Mechanical / Electrical / C&I (PLC) of all CHP equipments. Operation and Maintenance of Dust Extraction system, Dust Suppression System, Coal Sampler & Analyzer system, Ventilation system, Water sprinkling System, Pre wetting system, AC system, Sump Pumps, Compressors (De-watering Pump), Dewatering of tunnels and trenches including railway demurrage charges. (As per detailed scope of work attached as Annexure-VI).
Operation of equipment for feeding coal to the bunkers of Unit-I
Operation of equipment for feeding coal to the bunkers of Unit-II
Cleaning and House Keeping of entire Coal Handling Plant including Control Rooms, Electrical Rooms, Buildings, open cable trenches, Wagon Tipplers, Apron Feeders, Dribble feeders, Transfer Chutes, Skirt Boards, Crusher House, Transfer Points, Emergency Reclaim Hoppers, Vibrating Feeders, Stacker-Reclaimers, Tipper Trolleys at bunker floors and Coal Bunkers etc. Deployment of Stone Pickers for picking of stones, and other foreign material from running conveyors, removal of wild grass etc including Horticulture & Beautification activities of complete CHP, Cleaning of Road, Trenches, Drains in CHP area etc. (As per detailed scope of work attached as Annexure-VI).
Operation & Maintenance of Heavy Machinery such as Diesel Locomotives, Bulldozers, Loaders, Cranes, Dumpers and Excavators etc. (As per detailed scope of work attached as Annexure-IX).
Upkeep/Maintenance of Marshalling yard (As per detailed scope of work attached as Annexure-X).
Description of Work / Item(s)
Amount
Rates for Part B
Diesel charges per coal rake for first year. It will include taxes, handling charges and storage charges etc. (Firm has to enter the rate for diesel charges per rake and value shown in total amount tab will be of for full year with estimated 697 rakes per year (No GST will be paid extra). However, firm will be paid monthly charges on the basis of actual nmber of rakes received in that month.
STAR OANDM GROUP
Veenus Engineering
OSM PROJECTS PRIVATE LIMITED
STAR OANDM GROUP
AKA Logistics Private Limited
OSM PROJECTS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid