| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 CrAccepted-AOC | ₹22.2 Cr | L1 | Accepted-AOC RESPONSIVE |
| 2 | L2₹22.4 Cr+₹14.3 L (0.64%)Rejected-AOC | ₹22.4 Cr+₹14.3 L (0.64%) | L2 | Rejected-AOC RESPONSIVE |
Tender Value
₹22.7 Cr
EMD Value
₹45.4 L
Closing Date
14 Mar 2026, 12:30 pmClosed
EXECUTIVE ENGINEER
E. E. PROVINCIAL DIVISION NO. 1 PWD B AND R PATIALA
Construction of Entry Pavilion Front Boundary Wall Satsang Hall and Covered Corridor connecting Main Mandir Bhawan alongwith Renovation and Repair of Areas Surrounding Rajrajeshwari Mandir at Shri Kali Mata Mandir Patiala Phase II
2026_CEPW_161660_1
Bid No. 101 Dt. 19.02.2026
Open Tender
Civil Works - Buildings
Percentage
210 days
PATIALA
Please refer Tender documents.
3 documents required · 3 mandatory
₹50,000
₹45.4 L
Yes
17 Apr 2026
21 Feb 2026
14 Mar 2026
21 Feb 2026
14 Mar 2026
21 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING BLOCK : Earth work in excavation by manual or mechanical means in foundation trenches, rafts, basements, or drains in all sections and widths including open timbering over areas requiring struting ,shoring etc. complete where ever necessary and including required dewatering & dressing of sides and ramming of bottoms, lift up to 1.5 m including getting out the excavated soil and disposal of surplus excavated soil, as directed for all leads in all type of soil. (Excluding rock/boulder) | 934.5 | Cum | 35.82 | ₹33,473.79 |
| 2 | Back Filling with available earth within site in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers & rolling every third & top most layer with power roller of minimum 8 tonne & dressing up in embankments for roads, flood banks, marginal banks & guide banks etc to achieve minimum 95% Proctor density for all leads & lifts. | 781.1 | Cum | 66.37 | ₹51,841.61 |
| 3 | ATT: Providing and applying Anti Termite Treatment using pre constructional chemical treatment measures as per IS - 6313 - 2001 ( Part 2 ) & using Chemical containg chloropyrifos systemic insecticide diluted to manufacturer's specifications (i) In foundation pits, by treating the bottom & sides upto height of 300mm by uniformly spraying solution @ 5 Litre / Sqm (ii) In the refill earth on both sides of all built up walls @ 7.5 Litre / Running meter ( width - 300 mm, depth - 450 mm ) (iii) Before laying the floor, by uniformly sprinkling the top surface of the consolidated earth within the outer perimeter @ 5 Litre solution per Sqm. | 373.8 | Ltr | 391.9 | ₹1,46,492.22 |
| 4 | PCC WORK: P/L cement concrete 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) M10/M15 | 37.27 | Cum | 4,837.67 | ₹1,80,299.96 |
| 5 | REINFORCED CEMENT CONCRETE: Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel
reinforcement centring and shuttering in
foundation and plinth. M-25 Grade (with minimum of 360/385 kg of cement per cu meter) Super Structure | 144.72 | Cum | 6,352.61 | ₹9,19,349.72 |
| 6 | Reinforced cement concrete M-25 mechanically batchmixed using batch type concretemixer asper IS:1791and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 264.26 | Cum | 7,143.32 | ₹18,87,693.74 |
| 7 | Extra for pumping charges of Batch Mix Concrete / Ready mix conrete work (RMC) | 409 | Cum | 92.71 | ₹37,918.39 |
| 8 | Extra for using computerised concrete batch mixing plant including carriage by transit mixer within 1km lead(note: whereconcrete
mixer is already included in the rate the same shall be deducted ) | 409 | Cum | 130.63 | ₹53,427.67 |
| 9 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 396.42 | Sqm | 221.24 | ₹87,703.96 |
| 10 | Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 748.8 | Sqm | 560.46 | ₹4,19,672.45 |
stage.html
html • 0.04 MB
techsummary_327627.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_327627.xls
BOQ • 1.51 MB
dnit.pdf
Tender Documents • 17.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .