Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | Rejected-Technical | - | Rejected-Technical Non-Responsive | ||
| 3 | Rejected-Technical E 207 INDUSTRIAL AREA PHASE VIII B SECTOR 74 MOHALI 160071 PUNJAB | MOHALI | MOHALI | PUNJAB | 160071 | - | Rejected-Technical Non Responsive | ||
| 4 | Rejected-Technical | - | Rejected-Technical Non-Responsive | ||
| 5 | Rejected-Technical | - | Rejected-Technical Non-Responsive |
Tender Value
₹8.3 Cr
EMD Value
₹16.7 L
Closing Date
10 Jun 2026, 4:00 pmClosed
Executive Engineer RNB Division Awantipora
Executive Engineer RNB Division Awantipora
Design, Build and operate 700 KLD Sewerage Treatment Plant (STP) on SBR Technology (Sequential Batch Rector) with SCADA system with Operation and Maintenance for 03 years including 03 months free trial run (on EPC mode), excluding Sewerage Pipe Net
2026_PWDJK_309731_1
13/EEA/RNB/of 2026-27/1046-56 DATED 11-05-2026
Open Tender
Civil Works
Percentage
365 days
PAMPORE
AS PER NIT/SBD
17 documents required · 17 mandatory
₹8,500
Executive Engineer RNB Division Awantipora
₹16.7 L
OFFICE OF CHIEF ENGINEER PW RNB DEPT SOUTH KASHMIR
15 Oct 2026
11 May 2026
11 Jun 2026
12 May 2026
10 Jun 2026
12 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Build and operate 700 KLD Sewerage Treatment Plant (STP) on SBR Technology (Sequential Batch Rector) with “SCADA” system with Operation and Maintenance for 03 years including 03 months free trial run (on EPC mode), excluding Sewerage Pipe Network at Transit Accommodations at Lethpora-I
The job among other things includes designing part to be Vetted by IIT/DIQC/NIT including Construction of STP on SBR Technology (Sequential Batch Rector) with “SCADA” system with Operation and Maintenance for 03 years including 03 months free trial run (excluding Sewerage Pipe Network)Complete in all respects. | - | CJ | 0.27 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.90 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_1002505.xls
BOQ • 0.31 MB
AddendumNIT13.pdf
PDF • 3.38 MB
Extension13NIT2nd.pdf
PDF • 0.98 MB
Extension13NIT.pdf
PDF • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .