Tender Value
₹10.4 L
EMD Value
₹20,840
Closing Date
1 Aug 2026, 4:00 pm6d left
XEN PWD REASI
XEN PWD REASI
Construction of Elementary ACR at Govt MS Salal Kotali Zone Chinkah under PAB SAMAGRA
2026_PWDJK_316099_2
e-NIT No.29 of 2026-27 Dated 14-07-2026
Open Tender
Civil Works
Percentage
180 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN PWD REASI
₹20,840
15 Jul 2026
15 Jul 2026
3 Aug 2026
15 Jul 2026
1 Aug 2026
15 Jul 2026
15 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres.All kinds of soil : | 29.19 | Cum | 256.85 | ₹7,497.45 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in M-7.5(1:4:8) grade, with 40mm nominal size of (Crushed stone aggregates). | 10.79 | Cum | 5,202.9 | ₹56,139.29 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.26 | Cum | 7,788.4 | ₹40,966.98 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in M-10(1:3:6) grade, with 20mm nominal size of Crushed stone aggregates. | 12.02 | Cum | 5,733.6 | ₹68,917.87 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 15.63 | Cum | 7,571.55 | ₹1,18,343.33 |
| 6 | Extra for brick work in superstructure above plinth level (by manual mean). | 15.63 | Cum | 1,455.62 | ₹22,751.34 |
| 7 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6mm angle iron and 3mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer | 6.04 | Sqm | 5,493.9 | ₹33,183.16 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 14.97 | Cum | 9,821.85 | ₹1,47,033.09 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,813 | Kg | 123.2 | ₹2,23,361.6 |
| 10 | Centring and shuttermg including strutting, propping etc. and removal of form for removal of form work for Foundations, footings, bases of columns etc. for mass concrete. | 67.18 | Sqm | 286.35 | ₹19,236.99 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1029137.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].