Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 L+₹13,282.54 (7.65%)Admitted-Fee/PreQual/Technical/Finance | -8.50% | ₹1.9 L+₹13,282.54 (7.65%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 L+₹14,856.01 (8.55%)Admitted-Fee/PreQual/Technical/Finance | -7.73% | ₹1.9 L+₹14,856.01 (8.55%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.9 L+₹20,434.69 (11.8%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹1.9 L+₹20,434.69 (11.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.0 L+₹28,608.56 (16.5%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹2.0 L+₹28,608.56 (16.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹4,080
Closing Date
1 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_322238_10
2nd Call e-NIT No. 130 REW UDHAMPUR of 2026-27 Dated 24-08-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,080
5 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
1 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 107 | sqm | 91.75 | ₹9,817.25 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) PCC | 10.77 | cum | 4,826.5 | ₹51,981.41 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 269 | kg | 123.2 | ₹33,140.8 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 10.77 | cum | 7,104.3 | ₹76,513.31 |
| 5 | Painting runway / taxi track/ apron marking with adequate no. of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge including cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete. 16.55.1 New work (Two or more coats). | 4.23 | sqm | 165.25 | ₹699.01 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 43.9 | rmt | 262.2 | ₹11,510.58 |
| 7 | Providing and making CIB as per the direction of engineer in-charge including supply of materials, carriages all complete. L.M.R. (Painting and writing only ) | 1 | NO | 2,000 | ₹2,000 |
| 8 | carriage og Agg. Below 40mm from avg. distance Of 15 Kms by MT and 50 m AT LOCAL CRUSHER | 19.16 | cum | 545.16 | ₹10,445.27 |
| 9 | carriage of sand Of 40 Kms by Mt and 50 m at jhajhar | 9.91 | cum | 831.41 | ₹8,239.27 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1079014.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .