Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
26 Oct 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief construction engineer
Office of the CCE NH,CIRCLE KEONJHAR
Construction of Twin E-Type (G plus 1) Quarter at Baripada under NH Division Baripada for 2026-27
2026_CENH_143037_1
CCE NHC KJR - 04/2026-27
Open Tender
Civil Works - Buildings
Percentage
300 days
Baripada
Please refer tender documents
4 documents required · 4 mandatory
₹10,000
₹1.5 L
Yes
12 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
26 Oct 2026
12 Oct 2026
12 Oct 2026 - 19 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kind of soil within 50 m initial loead and initieal lift, including dressing and levelling the bed etc. complete | 384.41 | cum | 282.88 | ₹1,08,741.9 |
| 2 | Filling in foundation and plinth with exavated material including watering and ramming as directed by the Engineering -in charge | 384.41 | cum | 188.59 | ₹72,495.88 |
| 3 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. | 324.94 | cum | 528.07 | ₹1,71,591.07 |
| 4 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 109.21 | cum | 5,964.27 | ₹6,51,357.93 |
| 5 | Cement Concrete (1:1.5:3) using 12mm size cbhg chips including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. | 8.98 | cum | 8,348.13 | ₹74,966.21 |
| 6 | R.C.C. M-20 using 20 mm & down size h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. A) For Column Base | 28.36 | CUM | 6,433.38 | ₹1,82,450.66 |
| 7 | Plinth Beam | 10.55 | cum | 7,307.78 | ₹77,089.77 |
| 8 | Coloumn/Beam(Ground Floor) Pedestal,Column upto plinth beam,columns,Roof Beam 10",Beam for stair case,Drawing cum dinning. | 31.34 | cum | 15,816.23 | ₹4,95,680.65 |
| 9 | Column/beam (First floor) Columns ,Head room,staircase,Drawing cum dinnig | 14.58 | cum | 17,876.29 | ₹2,60,636.31 |
| 10 | Column/Beam (2nd Floor) column ,head room ,roof beam | 2.89 | cum | 20,342.94 | ₹58,791.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_613125.xls
BOQ • 0.84 MB
FinalDTCN0910.pdf
Tender Documents • 8.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .