Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
12 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SR.DEN E
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or(iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.(b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b) (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b)(3)To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contract or through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements asper clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financialyears excluding the current financial year, listed on National Stock Exchange or BombayStock Exchange, incorporated/registered at least 5 years prior to the date of closing oftender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Similar nature of work: "Any Earth work".
14 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
The Bid Security should be paid through online payment. In case the tenderer withdraw his offer within the validity period of his offer or fails to undertake the contract after acceptance of his tender the full Bid Security shall be forfeited. If the tender is accepted the amount of Bid Security will be retained and adjusted as security deposit for the due and faithful fulfillment of the contract. The Bid Security of the unsuccessful tenderers shall save as here-in-before provided be returned to the unsuccessful tenderers within a reasonable time but the Railway shall not be responsible for any loss or depreciation that my happen to the security for the due performance of the stipulation to keep the offer open for the period specified in the tender documents or to the Bid Security while in their possession nor be liable to pay interest thereon.
The tenderers shall keep the offer open for a minimum period as mentioned in NIT from the date of opening of the tender, within which period the tenderers can not withdraw their offer, subject to the period being extended further if required, by mutual agreement from time to time. Any intervention of the above condition will make the tenderer liable for forfeiture of his security deposit for due performance of the foregoing stipulation.
If it is not mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender. The tenderer whether sole proprietor / a company or a partnership firm / registered society / registered trust / HUF / LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/Contract up to the stage of signing the agreement except in the case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association / Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he / they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him / them to deal with all other contractual activities subsequent to signing of agreement, if required. NOTE : A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed and Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if nt carries a conforming Apostille certificate.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
The quantities shown in above Schedule are approximate and are as a guide to give the tenderer(s) an idea of quantum of work involved. The Railway reserves the right to increase/decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
Ajmer-Chanderia Section - Shallow Screening of Track by SBCM for 36.078 TKM including Earthwork.
126-2026~NWR
126-2026
Open
Works - General
12 Months
Ajmer, Rajasthan
₹0
₹5.5 L
16 Oct 2026
16 Oct 2026
29 Oct 2026
13 items across 1 schedule · ₹2,73,15,438.74 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| in filling in embankment, guide bunds, buried type abutments, bridge gaps, refuges, platforms etc. with contractor's conforming to Soil Quality Class after preparation of foundations benching in existing banks wherever spreading in layers with motor grader, the moisture content to OMC, compaction to specified density and bank to final profile as per RDSO RDSO/2020/GE: IRS-0004 with correction slips. Note: 1) Foundation Benching including additional on account of this, wherever required, extra under relevant schedule item 2) Payment for Earthwork under shall be made based on the cross measurements calculated (i) with original profile of existing bank based on initial before doing benching and (ii) final the bank worked out with final levels guidelines. | as as | — | — | — | |
| 1 | Class SQ2 | cum | 11364.31 | 227.72 | 25,87,880.67 |
| in cutting in formation, trolley refuges, level crossing approaches, platforms, drains, diversion of nallah & finishing dimension and slopes to obtain appearance to standard profile inclusive materials, plant & machinery, leading either to make spoil dumps or embankment with leads within 2 km of edge of the cutting(s) including descent, loading, unloading, bailing out water, if required, clearance all other works incidental thereto the work as per RDSO Specification RDSO/2020/GE: IRS-0004 with latest updated slips and to the satisfaction of Note: (i) All usable earth cut spoils shall be led into bank and Unusable spoils shall be dumped away from toe of embankment. (ii) /and boulders not fit for filling will the contractor and will be property (iii)Cut trees shall be property and to be deposited in the railway unless specified otherwise in of Contract. | a of for on all of for the / All be of of the | — | — | — | |
| 2 | conditions and classifications of soil except | cum | 7217.18 | 107.39 | 7,75,052.96 |
| 3 | profiling of ballast as per procedure in latest edition of IRPWM including on both sides of track. The work removing excess ballast from track the same in crib and shoulder a maximum of 50m including crossing deweeding on ballast section etc and Engineer-In charge. | TRM by as | 36078.00 | 28.14 | 10,15,234.92 |
| of ballast from Railway's Hopper quantity distribution as per pre-defined requirement, clearing infringements/jammed distributing the unloaded ballast over the track, profiling and boxing prescribed safety norms. | — | — | — | — | |
| 4 | Block Conditions: | cum | 16777.91 | 56.2 | 9,42,918.54 |
| 5 | repair/widening work as per RDSO and guidelines RDSO/2020/GE: or latest in running line with suitable designed profile The work shall include and disposing of all the vegetation, at every 30 Cm vertical height, in benching portion and compaction slope vibratory Rollers/Compactors achieve prescribed MDD. Note: cess repairs shall be based on worked out from the cross sectional only and worked out from the initial levels before doing benching and final done for new embankment. The earth benching portion shall not be paid extra has been included in the rate. 2. shall be started only after Completing benching and certified. 3. The benching be done for a maximum height of 1.50 time based on the progress starting from toe of the embankment. | cum 1. the The of | 61333.34 | 309.11 | 1,89,58,748.73 |
| of LWR/CWR track of any density line block with contractor's labours, equipments and consumables inclusive & lift. Activities include cutting into convenient panels of specified removal of ERCs, liners, greasing of ERCs contact area, lifting rails and keeping rollers provided at every 15 sleepers, elongation of rail ends depending site conditions, pulling rails with Hydraulic Tensor to achieve the desired cutting rails, as required, removing placing rail in position, re-fixing ERCs adjustment of gap at SEJs : Note: rail joints will be paid separately. (2) and Hole drilling shall be paid (3) Opening and closing of LC will be paid separately. (4) As per prescribed in latest edition of IRPWM Circulars for destressing of LWR/CWR, | of of on the (1) if if | — | — | — | |
| 6 | tensor | TRM | 36078.00 | 42.59 | 15,36,562.02 |
| 7 | of screened muck discharged where muck disposal on side slope due to platform, cutting, OHE mast etc. it beyond 5m from edge of cutting deep or alternatively carting it up disposing off beyond the end of cutting and making up cess wherever low. | by TRM is to / | 36078.00 | 21.25 | 7,66,657.5 |
| out pre-tamping, during tamping and work for tamping track with rails, sleepers & sleeper density Track Tamping machines, like Machines which include : (1) of ballast, heaping-up of ballast, cavities in tamping zone by picking stacks / shoulders / crib of adjoining to lead of 50 m to ensure effective (2) Clearing of ballast on sleepers visible to operator, (3) Clearing rail foot to facilitate holding of rail TTRM; (4) Digging, screening and of ballast at mud pumping ballast in sleeper crib location; of loose fittings immediately before tamping; (6) Replacement of broken fittings supplied by Railway; displaced sleepers to position along (8) Re-setting of worked-out (9) Removing and re-fixing joggled & wooden blocks, wherever necessary; consolidation of ballast in crib (11) Removing and refixing of traction the block in electrified sections (12) ballast Note: 1. Tamping blocks are & it may be given at any time either or night. 2. Stages of payment a) 30% will be paid on completion of attention, b) Balance 70% of the rate on completion of post tamping. at the rate of twice the above rate will be effected in case contractor carry out pre/during/post operation. shall be made only once of numbers of TTRM packing round restoration of normal speed and of complete ballast profile. | all by Re- to of by / (5) & / (7) / / pre 3. in | — | — | — | |
| 8 | block working | TRM | 36078.00 | 20.3 | 7,32,383.4 |
| Schedule total | ₹2,73,15,438.74 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022-ACS10_compressed.pdf
ATTACHMENT
ACS-11.pdf
ATTACHMENT
ACS12.pdf
ATTACHMENT
JPOforcablecut.pdf
ATTACHMENT
126TenderForm.pdf
ATTACHMENT
1262SpecialConditiion.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .