| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.3 LAccepted-AOC | ₹97.3 L Quoted ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹22.2 L (21.8%)Rejected-AOC | ₹1.2 Cr+₹22.2 L (21.8%) | L2 | Rejected-AOC Not L1 |
| 3 | L3₹1.4 Cr+₹33.9 L (33.3%)Rejected-AOC 1 20 OCHERI ROAD AMMANOOR POST ARAKKONAM 631 002 | ARAKKONAM | RANIPET | TAMIL NADU | 631002 | ₹1.4 Cr+₹33.9 L (33.3%) | L3 | Rejected-AOC Not L1 |
| 4 | Rejected-Technical SITE OFFICE PTPS PANIPAT | - | - | Rejected-Technical As per decision of committee |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per decision of committee |
| Sl No | Description | Qty | Unit | APEX PROJECTS | CHANDA CONSTRUCTION CO. | M/s Power Tech Engineering Co. |
|---|---|---|---|---|---|---|
| 1.00Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / RECJs of ducting of 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024 | ||||||
| 1.01 | Repairing / Replacement of all ducting (cold air ducts, hot primary air ducts, secondary air ducts, flue gas ducts etc.) for 210 MW, Unit-6 as per scope of work of Part-A | 1 | L/S | 27,27,227 ₹32,18,127.86 Lowest | 38,65,000 ₹45,60,700 | 37,30,300 ₹37,30,300 |
| 1.02 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4390 x 3402, Lip Style:01 (FS) installed at RAH outlet, (Lenght of each mtr. exp. joints 15.58 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 31.17 | Mtr. | 1,27,797 ₹1,50,800.46 Lowest | 1,44,940.5 ₹1,71,029.79 | 1,87,020 ₹1,87,020 |
| 1.03 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1300X3402 Lip Style 02 (FS), (Installed at Interconnected Sec Air Duct of Both A & B), (Lenght of each mtr. exp. joints 9.40 mtr: total qty. 1 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 9.4 | Mtr. | 38,540 ₹45,477.2 Lowest | 43,710 ₹51,577.8 | 56,400 ₹56,400 |
| 1.04 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 04 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Length of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 21.81 | Mtr. | 89,421 ₹1,05,516.78 Lowest | 1,01,416.5 ₹1,19,671.47 | 1,30,860 ₹1,30,860 |
| 1.05 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 01 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Lenght of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 21.81 | Mtr. | 89,421 ₹1,05,516.78 Lowest | 1,01,416.5 ₹1,19,671.47 | 1,30,860 ₹1,30,860 |
| 1.06 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3650x1950, Lip Style 04 (FS) (Installed at Wind Box Inlet) (Lenght of each mtr. exp. joints 11.20 mtr: total qty. 4 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 44.8 | Mtr. | 1,83,680 ₹2,16,742.4 Lowest | 2,08,320 ₹2,45,817.6 | 2,68,800 ₹2,68,800 |
| 1.07 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 6199x2802, Lip Style: 04 (FS) (Installed at Eco Outlet) (Lenght of each mtr. exp. joints 18.16 mtr: total qty. 2 No.) for 210 MW, Unit-6 as per scope of work of Part-B | 36.32 | Mtr. | 2,65,789.76 ₹3,13,631.92 | 1,68,888 ₹1,99,287.84 Lowest | 3,63,200 ₹3,63,200 |
| 1.08 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404, Lip Style 04 (FS) (Installed at RAH Inlet) (Lenght of each mtr. exp. joints 23.99 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 47.98 | Mtr. | 3,51,117.64 ₹4,14,318.82 | 2,23,107 ₹2,63,266.26 Lowest | 4,79,800 ₹4,79,800 |
| 1.09 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404 Lip Style: 01 (FS) (Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 23.83 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 47.66 | Mtr. | 1,95,406 ₹2,30,579.08 Lowest | 2,21,619 ₹2,61,510.42 | 2,85,960 ₹2,85,960 |
Tender Value
₹96.8 L
EMD Value
₹2.3 L
Closing Date
21 Aug 2025, 1:00 pmClosed
Raman Yadav
CE PTPS Panipat
Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from ou
2025_HBC_456304_1
2025B3374DEA A7DB 49F8 ABCE 19CEAD847A47713PGC
Open Tender
Civil Works
Works
48 days
ASSAN KALAN
as per tender set
2 documents required · 2 mandatory
₹1,180
₹2.3 L
Yes
15 Dec 2025
4 Jul 2025
25 Aug 2025
4 Jul 2025
21 Aug 2025
4 Jul 2025
4 Jul 2025 - 6 Jul 2025
Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / RECJs of ducting of 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Repairing / Replacement of all ducting (cold air ducts, hot primary air ducts, secondary air ducts, flue gas ducts etc.) for 210 MW, Unit-6 as per scope of work of Part-A
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4390 x 3402, Lip Style:01 (FS) installed at RAH outlet, (Lenght of each mtr. exp. joints 15.58 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1300X3402 Lip Style 02 (FS), (Installed at Interconnected Sec Air Duct of Both A & B), (Lenght of each mtr. exp. joints 9.40 mtr: total qty. 1 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 04 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Length of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 01 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Lenght of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3650x1950, Lip Style 04 (FS) (Installed at Wind Box Inlet) (Lenght of each mtr. exp. joints 11.20 mtr: total qty. 4 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 6199x2802, Lip Style: 04 (FS) (Installed at Eco Outlet) (Lenght of each mtr. exp. joints 18.16 mtr: total qty. 2 No.) for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404, Lip Style 04 (FS) (Installed at RAH Inlet) (Lenght of each mtr. exp. joints 23.99 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404 Lip Style: 01 (FS) (Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 23.83 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3502 X 3404, Lip Style 02 (FS) (Installed at Inclined Duct after RAH to RC Feeder Floor (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 13.81 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 2494 X 2465 Lip Style 02 (FS) (Installed at ESP Inlet Funnel (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 9.92 mtr: total qty. 8 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1982 X 2465, Lip Style 02 (FS) (Installed at ESP Outlet Funnel (ESP) To ID Fan) (Lenght of each mtr. exp. joints 8.89 mtr: total qty. 8 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3100 X 3100, Lip Style 02 (FS) (Installed at ESP Outlet Common HDR and 90 Deg Duct (ESP To ID Fan) (Lenght of each mtr. exp. joints 12.40 mtr: total qty. 5 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3633 X 3772 Lip Style 02 (FS) (Installed at ESP Outlet to ID Fan) (Lenght of each mtr. exp. joints 14.81 mtr: total qty. 3 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4032 X 1387 Lip Style 04 (FS) (ID Fans Inlet (ESP to ID Fan) (Lenght of each mtr. exp. joints 10.84 mtr: total qty. 6 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 2970 X 1762, Lip Style 01 (FS) (Installed at ID Fans Outlet (ID Fan to Chimney) (Lenght of each mtr. exp. joints 9.46 mtr: total qty. 3 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Repairing only of remaining eroded and repairable metallic Expansion Bellows /RCEJS: for 210 MW, Unit-6 as per scope of work of Part-B
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: At Interconnected Sec Air Duct of Both AandB (Length 12 mtr. and Width 400 MM, total qty. 1 No.): size:1300X3402, Lip Style: 02 (FS) Lip Width =290 mm for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet Funnel (ESP to ID Fan) (Length 12 mtr. and Width 400 MM, total qty. 8 No.) Size: 1982 X 2465, Lip Style: 02 (FS) Lip Width=287 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Inlet Funnel (BOF to ESP Inlet) (Length 13 mtr. and Width 400 MM, total qty. 8 No.) Size: 2494 X 2465, Lip Style: 02 (FS) :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans Outlet (ID Fan to Chimney) (Length 13 mtr. and Width 400 MM, total qty. 3 No.) Size: 2970 X 1762, Lip Style: 01 (FS) Lip Width=185 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans to 90° Duct (ID Fan to Chimney) (Length 16 mtr. and Width 400 MM, total qty. 4 No.) Size: 3100 X 3100, Lip Style: 02 (FS) Lip Width=272 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans Outlet to Common Header Duct (ID Fan to Chimney) (Length 16 mtr. and Width 400 MM, total qty. 1 No.) Size: 3100 X 3100, Lip Style: 01 (FS) Lip Width=185 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Inclined Duct after RAH To RC Feeder Floor (BOF to ESP Inlet)(Length 17 mtr. and Width 400 MM, total qty. 4 No.) Size: 3402 X 3504, Lip Style: 02 (FS) Lip Width=106 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Wind Box Inlet (Length 14 mtr. and Width 500 MM, total qty. 4 No.) Size: 3650x1950, Lip Style: 04 (FS) Lip Width -645 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Length 27 mtr. and Width 300 MM, total qty. 2 No.) Size: 8510x3404, Lip Style: 01 (FS) Lip Width=106 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet to WB Slanting Duct (Length 14 mtr. and Width 400 MM, total qty. 2 No.) Size: 3402x2050, Lip Style: 01 (FS) Lip Width -185 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet to WB Slanting Duct (Length 14 mtr. and Width 400 MM, total qty. 2 No.) Size: 3402x2050, Lip Style: 04 (FS) Lip Width -582 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: ID Fan Inlet (ESP to ID Fan) (Length 14 mtr. and Width 400 MM, total qty. 6 No.) Size: 4032 X 1387, Lip Style: 04 (FS) Lip Width=282 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet Common HDR and 90 Deg Duct (ESP To ID Fan) (Length 15 mtr. and Width 400 MM, total qty. 5 No.) Size: 3100 X 3100, Lip Style: 02 (FS) Lip Width=272 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet to ID Fan (Length 18 mtr. and Width 400 MM, total qty. 3 No.) Size: 3633 X 3772, Lip Style: 02 (FS) Lip Width=272 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ECO Outlet (Length 21 mtr. and Width 600 MM, total qty. 2 No.) Size: 6199x2802, Lip Style: 04 (FS) Lip Width -200 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet (Length 18 mtr. and Width 300 MM, total qty. 2 No.) Size: 4390X3402, Lip Style: 01 (FS) Lip Width -192 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Inlet (Length 27 mtr. and Width 600 MM, total qty. 2 No.) Size: 8510x3404, Lip Style: 04 (FS):for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Chimney Inlet (Length 31 mtr. and Width 400 MM, total qty. 1 No.) Size: 8764 X 3506, Lip Style: 02 (FS) Lip Width -272 mm: for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Any other location/area for installation of any size of fabric compensators / Conveyor Belt which has not mentioned above. The payment of the same will be made based on the total running meter length utilized (lump sum) for 210 MW, Unit-6 as per scope of work of Part-C
Running meter Welding of ducting plate / sheet etc (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Replacement / Repair of ducting Sheet /plate/ Angle/ Grills/ Channels/Guide vanes etc. using patch work etc. (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Replacement of duct support pipe etc. (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Application of refractory (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Semi Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Un-Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .