| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.3 LAccepted-AOC | ₹97.3 L Quoted ₹1.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-AOC | ₹1.2 Cr | L2 | Rejected-AOC Not L1 |
| 3 | L3₹1.4 CrRejected-AOC 1 20 OCHERI ROAD AMMANOOR POST ARAKKONAM 631 002 VELLORE DIST | ARAKKONAM | VELLORE | TAMIL NADU | 631002 | ₹1.4 Cr | L3 | Rejected-AOC Not L1 |
| 4 | Rejected-Technical SITE OFFICE PTPS PANIPAT | - | - | Rejected-Technical As per decision of committee |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per decision of committee |
| Sl No | Description | Qty | Unit | APEX PROJECTS | CHANDA CONSTRUCTION CO. | M/s Power Tech Engineering Co. |
|---|---|---|---|---|---|---|
| 1.00Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / RECJs of ducting of 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024 | ||||||
| 1.01 | Repairing / Replacement of all ducting (cold air ducts, hot primary air ducts, secondary air ducts, flue gas ducts etc.) for 210 MW, Unit-6 as per scope of work of Part-A | 1 | L/S | 27,27,227 ₹32.2 L | 38,65,000 ₹45.6 L | 37,30,300 ₹37.3 L |
| 1.02 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4390 x 3402, Lip Style:01 (FS) installed at RAH outlet, (Lenght of each mtr. exp. joints 15.58 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 31.17 | Mtr. | 1,27,797 ₹1.5 L | 1,44,940.5 ₹1.7 L | 1,87,020 ₹1.9 L |
| 1.03 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1300X3402 Lip Style 02 (FS), (Installed at Interconnected Sec Air Duct of Both A & B), (Lenght of each mtr. exp. joints 9.40 mtr: total qty. 1 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 9.4 | Mtr. | 38,540 ₹45,477.20 | 43,710 ₹51,577.80 | 56,400 ₹56,400 |
| 1.04 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 04 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Length of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 21.81 | Mtr. | 89,421 ₹1.1 L | 1,01,416.5 ₹1.2 L | 1,30,860 ₹1.3 L |
| 1.05 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 01 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Lenght of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 21.81 | Mtr. | 89,421 ₹1.1 L | 1,01,416.5 ₹1.2 L | 1,30,860 ₹1.3 L |
| 1.06 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3650x1950, Lip Style 04 (FS) (Installed at Wind Box Inlet) (Lenght of each mtr. exp. joints 11.20 mtr: total qty. 4 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 44.8 | Mtr. | 1,83,680 ₹2.2 L | 2,08,320 ₹2.5 L | 2,68,800 ₹2.7 L |
| 1.07 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 6199x2802, Lip Style: 04 (FS) (Installed at Eco Outlet) (Lenght of each mtr. exp. joints 18.16 mtr: total qty. 2 No.) for 210 MW, Unit-6 as per scope of work of Part-B | 36.32 | Mtr. | 2,65,789.76 ₹3.1 L | 1,68,888 ₹2.0 L | 3,63,200 ₹3.6 L |
| 1.08 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404, Lip Style 04 (FS) (Installed at RAH Inlet) (Lenght of each mtr. exp. joints 23.99 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 47.98 | Mtr. | 3,51,117.64 ₹4.1 L | 2,23,107 ₹2.6 L | 4,79,800 ₹4.8 L |
| 1.09 | Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404 Lip Style: 01 (FS) (Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 23.83 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B | 47.66 | Mtr. | 1,95,406 ₹2.3 L | 2,21,619 ₹2.6 L | 2,85,960 ₹2.9 L |
Tender Value
₹96.8 L
EMD Value
₹2.3 L
Closing Date
21 Aug 2025, 1:00 pmClosed
Raman Yadav
CE PTPS Panipat
Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from ou
2025_HBC_456304_1
2025B3374DEA A7DB 49F8 ABCE 19CEAD847A47713PGC
Open Tender
Civil Works
48 days
ASSAN KALAN
as per tender set
2 documents required · 2 mandatory
₹1,180
₹2.3 L
Yes
15 Dec 2025
4 Jul 2025
25 Aug 2025
4 Jul 2025
21 Aug 2025
4 Jul 2025
4 Jul 2025 - 6 Jul 2025
Replacement / Repairing of all types of ducting (Cold Air Ducts, Hot Air Ducts, Flue Gas Ducts Etc.) from Boiler to Chimney, Metallic Expansion Bellows / Round Corner Expansion Joints (RCEJs) of ducting and Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / RECJs of ducting of 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Repairing / Replacement of all ducting (cold air ducts, hot primary air ducts, secondary air ducts, flue gas ducts etc.) for 210 MW, Unit-6 as per scope of work of Part-A
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4390 x 3402, Lip Style:01 (FS) installed at RAH outlet, (Lenght of each mtr. exp. joints 15.58 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1300X3402 Lip Style 02 (FS), (Installed at Interconnected Sec Air Duct of Both A & B), (Lenght of each mtr. exp. joints 9.40 mtr: total qty. 1 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 04 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Length of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3402x2050 Lip Style 01 (FS) (Installed at RAH Outlet to WB Slanting Duct) (Lenght of each mtr. exp. joints 10.90 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3650x1950, Lip Style 04 (FS) (Installed at Wind Box Inlet) (Lenght of each mtr. exp. joints 11.20 mtr: total qty. 4 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 6199x2802, Lip Style: 04 (FS) (Installed at Eco Outlet) (Lenght of each mtr. exp. joints 18.16 mtr: total qty. 2 No.) for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404, Lip Style 04 (FS) (Installed at RAH Inlet) (Lenght of each mtr. exp. joints 23.99 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 8510x3404 Lip Style: 01 (FS) (Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 23.83 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3502 X 3404, Lip Style 02 (FS) (Installed at Inclined Duct after RAH to RC Feeder Floor (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 13.81 mtr: total qty. 2 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 2494 X 2465 Lip Style 02 (FS) (Installed at ESP Inlet Funnel (BOF to ESP Inlet) (Lenght of each mtr. exp. joints 9.92 mtr: total qty. 8 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 1982 X 2465, Lip Style 02 (FS) (Installed at ESP Outlet Funnel (ESP) To ID Fan) (Lenght of each mtr. exp. joints 8.89 mtr: total qty. 8 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3100 X 3100, Lip Style 02 (FS) (Installed at ESP Outlet Common HDR and 90 Deg Duct (ESP To ID Fan) (Lenght of each mtr. exp. joints 12.40 mtr: total qty. 5 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 3633 X 3772 Lip Style 02 (FS) (Installed at ESP Outlet to ID Fan) (Lenght of each mtr. exp. joints 14.81 mtr: total qty. 3 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 4032 X 1387 Lip Style 04 (FS) (ID Fans Inlet (ESP to ID Fan) (Lenght of each mtr. exp. joints 10.84 mtr: total qty. 6 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Size: 2970 X 1762, Lip Style 01 (FS) (Installed at ID Fans Outlet (ID Fan to Chimney) (Lenght of each mtr. exp. joints 9.46 mtr: total qty. 3 No.): for 210 MW, Unit-6 as per scope of work of Part-B
Replacement / Repair of Metallic Expansion Bellows/ Round corner expansion joints (RCEJs) of ducting : Repairing only of remaining eroded and repairable metallic Expansion Bellows /RCEJS: for 210 MW, Unit-6 as per scope of work of Part-B
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: At Interconnected Sec Air Duct of Both AandB (Length 12 mtr. and Width 400 MM, total qty. 1 No.): size:1300X3402, Lip Style: 02 (FS) Lip Width =290 mm for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet Funnel (ESP to ID Fan) (Length 12 mtr. and Width 400 MM, total qty. 8 No.) Size: 1982 X 2465, Lip Style: 02 (FS) Lip Width=287 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Inlet Funnel (BOF to ESP Inlet) (Length 13 mtr. and Width 400 MM, total qty. 8 No.) Size: 2494 X 2465, Lip Style: 02 (FS) :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans Outlet (ID Fan to Chimney) (Length 13 mtr. and Width 400 MM, total qty. 3 No.) Size: 2970 X 1762, Lip Style: 01 (FS) Lip Width=185 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans to 90° Duct (ID Fan to Chimney) (Length 16 mtr. and Width 400 MM, total qty. 4 No.) Size: 3100 X 3100, Lip Style: 02 (FS) Lip Width=272 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ID Fans Outlet to Common Header Duct (ID Fan to Chimney) (Length 16 mtr. and Width 400 MM, total qty. 1 No.) Size: 3100 X 3100, Lip Style: 01 (FS) Lip Width=185 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Inclined Duct after RAH To RC Feeder Floor (BOF to ESP Inlet)(Length 17 mtr. and Width 400 MM, total qty. 4 No.) Size: 3402 X 3504, Lip Style: 02 (FS) Lip Width=106 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Wind Box Inlet (Length 14 mtr. and Width 500 MM, total qty. 4 No.) Size: 3650x1950, Lip Style: 04 (FS) Lip Width -645 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Vertical Duct Before Duct Hoppers (BOF to ESP Inlet) (Length 27 mtr. and Width 300 MM, total qty. 2 No.) Size: 8510x3404, Lip Style: 01 (FS) Lip Width=106 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet to WB Slanting Duct (Length 14 mtr. and Width 400 MM, total qty. 2 No.) Size: 3402x2050, Lip Style: 01 (FS) Lip Width -185 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet to WB Slanting Duct (Length 14 mtr. and Width 400 MM, total qty. 2 No.) Size: 3402x2050, Lip Style: 04 (FS) Lip Width -582 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: ID Fan Inlet (ESP to ID Fan) (Length 14 mtr. and Width 400 MM, total qty. 6 No.) Size: 4032 X 1387, Lip Style: 04 (FS) Lip Width=282 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet Common HDR and 90 Deg Duct (ESP To ID Fan) (Length 15 mtr. and Width 400 MM, total qty. 5 No.) Size: 3100 X 3100, Lip Style: 02 (FS) Lip Width=272 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ESP Outlet to ID Fan (Length 18 mtr. and Width 400 MM, total qty. 3 No.) Size: 3633 X 3772, Lip Style: 02 (FS) Lip Width=272 mm :for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at ECO Outlet (Length 21 mtr. and Width 600 MM, total qty. 2 No.) Size: 6199x2802, Lip Style: 04 (FS) Lip Width -200 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Outlet (Length 18 mtr. and Width 300 MM, total qty. 2 No.) Size: 4390X3402, Lip Style: 01 (FS) Lip Width -192 mm:for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at RAH Inlet (Length 27 mtr. and Width 600 MM, total qty. 2 No.) Size: 8510x3404, Lip Style: 04 (FS):for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Installed at Chimney Inlet (Length 31 mtr. and Width 400 MM, total qty. 1 No.) Size: 8764 X 3506, Lip Style: 02 (FS) Lip Width -272 mm: for 210 MW, Unit-6 as per scope of work of Part-C
Replacement of Fabric Compensator / Conveyor Belt from outside of Metallic Expansion Bellows / Joints of Flue Gas ducts / Primary Air ducts / Secondary air ducts / RAH ducts etc. as per scope of work: Any other location/area for installation of any size of fabric compensators / Conveyor Belt which has not mentioned above. The payment of the same will be made based on the total running meter length utilized (lump sum) for 210 MW, Unit-6 as per scope of work of Part-C
Running meter Welding of ducting plate / sheet etc (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Replacement / Repair of ducting Sheet /plate/ Angle/ Grills/ Channels/Guide vanes etc. using patch work etc. (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Replacement of duct support pipe etc. (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Application of refractory (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Semi Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
Man hour rates (including T and P gas consumables) for Un-Skilled labour/ welder (for unit rate variation purpose) for 210 MW Unit-6 PTPS Panipat during its overhauling as per scope of work & terms & conditions of E-NIT No. Ch-15 /MP-6139/Ducting Works/2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid