| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹6.6 L+₹3,257.29 (0.50%)Accepted-Finance KARUR | L2 | Accepted-Finance Admitted |
Tender Value
₹6.6 L
EMD Value
₹7,000
Closing Date
8 Dec 2022, 3:00 pmClosed
The Block Development Officer VP
BDO Office Bargur
Krishnagiri Dt Bargur Block AGAMT II 2022_23 2 Works For Strengthening of Bund, Weir Repair, Revetment work at MGNREGS Pond and Providing Link Drainage at Madepalli Near Burial Ground (40M) at Madhepalli Panchayat Package No BRG_31
2022_RDTN_267434_1
RocNo_5214_2022_R10_12_10_2022
Open Tender
Civil Works - Others
Item Rate
180 days
Bargur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
BDO Office Bargur
14 Dec 2022
24 Nov 2022
8 Dec 2022
24 Nov 2022
8 Dec 2022
24 Nov 2022
28 Nov 2022
Amount
1.Strengthening of Bund, Weir Repair, Revetment work @ MGNREGS Pond H/O Madhepalli Estimate Amount :4.000 Lakhs
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders And Hard Gravelly Soil As per SI62 Inflow Channel Clearance
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 m to 100 m deploying earth moving machinary and tippers including benching formation of bunds breaking clods sectioning etc complete., Add Consolidation charges by Machinary
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Below Ground Level
Above Ground level
Cement concrete 1:3:6 using 40mm HBG metal including cost and conveyance of all materials and labour charges etc., complete.,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Rough stone dry packing for revetment
Provision for Name Board
2.Providing Link Drainage With Horizontal Filter at Madepalli Near Burial Ground (40M) H/O Madhepalli Estimate Amount : 2.631 Lakhs
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Inspection Chamber
Drain
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid .
Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supply and Filling of Rough stone from Approved Qurry including all labour charge
Supply and Filling of 40 mm Metal from Approved Qurry including Cost and Conveyance
Collection and supply of gritty graval from appd qurry including cost and conveyance of all materials to site including all labour charges for filling
Supply and Fixing of 0.60x0.60m Vertical Filter steel Fabrication including cost and Conveyance
Supply and Filling of Char Coal including all labour charges
supplying and fixing of 110mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
supplying and fixing of 63mm dia 6ksc pvc pipe including all cost and conveyance etc., all complete
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and levelling to required profile
Provision for writing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPE Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .