Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹5.0 L+₹36,703 (7.93%)Rejected-Finance | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹5.3 L+₹65,803 (14.2%)Rejected-Finance 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹5.9 L+₹1.3 L (27.2%)Rejected-Finance | L4 | Rejected-Finance BEING L4 | |
| 5 | L5₹7.3 L+₹2.7 L (58.3%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L5 | Rejected-Finance BEING L5 |
| Sl No | Description | Qty | Unit | Atharva Enterprises L2 | DARSHAN CONSTRUCTION Co. L4 | sapana enterprises L3 | Shree Ayyappa Engineering L5 | LAXMI ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and fix in repair cooling tower fan assembly with fan speed not exceeding 60m/s, out let air velocity not less than 610 m/min and noise level not exceeding 75 dB made out of propeller type light weight solid/ hollow FRP rust resistant with statically and dynamically balanced blades alongwith galvanised steel guard protection to protect fan and out side area suitable for upto 120 TR capacity AC plants, complete all as specified and directed by Engr-in-Charge. | 1 | EACH | 17,000 ₹17,000 Lowest | 18,000 ₹18,000 | 18,000 ₹18,000 | 20,000 ₹20,000 | 60,000 ₹60,000 |
| 2.00 | Material and labour for taking out all old unserviceable PVC fills from cooling tower of capacity upto 100 TR and supply and fix in replacement of eliminator of cooling tower upto 100 TR, complete all as specified and directed by Engr-in-Charge. | 100 | EACH | 1,400 ₹1,40,000 | 150 ₹15,000 Lowest | 1,500 ₹1,50,000 | 400 ₹40,000 | 200 ₹20,000 |
| 3.00 | Cleaning the cooling tower of capacity upto 100 TR by applying wire brush, washing powder and other solvent by removing the deposited impurities such as silt, dust particles mud/ sand inside the dome and around the fins, cleaning of base tray & grills, pot stainer, main shaft etc and other connected items, servicing of fan motor including changing of bearings and greasing refixing the fan, frill & top cover including testing commissioning after reassembling complete including painting all as directed by Engr-in-charge. | 6 | EACH JOB | 3,200 ₹19,200 | 3,500 ₹21,000 | 3,300 ₹19,800 | 7,000 ₹42,000 | 2,400 ₹14,400 Lowest |
| 4.00 | Supply and fix in repairs Sprinkler Assembly complete with Header Nozzles made out of Galvanised iron suitable to fix in cooling towers of upto 120TR and above Capacity AC plant, complete all as specified and directed by Engr-in-Charge. | 1 | EACH | 19,000 ₹19,000 | 22,000 ₹22,000 | 20,000 ₹20,000 | 23,000 ₹23,000 | 18,000 ₹18,000 Lowest |
| 5.00 | Material and Labour for Charging of refrigerant gas R- 407C/ R134/R22 in sealed cylinder after making system leak proof, complete all as specified and directed by Engr-in-Charge.
Note:-Refrigerant shall be issued to contractor for each AC plant from AGE E/M -II store yard. Transportation as well as loading/unloading of cylinder from AGE E/M store yard to AC plant is inclusive in the quoted rate. | 60 | KG | 1,100 ₹66,000 | 1,050 ₹63,000 Lowest | 1,200 ₹72,000 | 2,000 ₹1,20,000 | 1,230 ₹73,800 |
| 6.00 | Complete servicing of AHUs installed in Zone-IV AC plants, removing of air filters and refixing after cleaning with air blower and water with suitable cleaning agent , cleaning of cooling coil with wire brush ,air blower and water spraying pump with gun and mixing the chemical sittable for removing of scales on aluminium fins and straighten the fins of cooling coil by using suitable brush for capacity upto 10000 CFM as directed by Engr-in-Charge. | 3 | EACH JOB | 7,800 ₹23,400 Lowest | 12,500 ₹37,500 | 7,900 ₹23,700 | 12,500 ₹37,500 | 9,000 ₹27,000 |
| 7.00 | Material and Labour for repairs to condenser of AC plant up to 35 TR Capacity by blocking the damaged/corroded tubes with the following instructions :-
(i) Disconnecting the side covers of the condenser from their existing positions.
(ii) Leakage testing of the condenser using pressurised nitrogen gas and finding the leaked tubes.
(iii) Blocking the damaged/leaked tubes by brass plugs.
(iv) Re-fixing the side covers of the condenser and the condenser valves from their existing positions with new nuts, bolts, rubber gasket and washers etc and painting the surface with approved shade of synthetic enamel paints . | 3 | EACH JOB | 12,500 ₹37,500 Lowest | 20,000 ₹60,000 | 12,600 ₹37,800 | 20,000 ₹60,000 | 15,600 ₹46,800 |
| 8.00Supply and fix regenerable coarse type, dust proof AHU air filter for following sizes:- | ||||||||
| 8.01 | AHU air filter of size 60cm x 60 cm x 5 cm. | 2 | EACH | 2,200 ₹4,400 | 7,500 ₹15,000 | 2,300 ₹4,600 | 9,000 ₹18,000 | 1,500 ₹3,000 Lowest |
| 8.02 | AHU air filter of size 60cm x 50 cm x 5 cm | 2 | EACH | 1,400 ₹2,800 | 8,000 ₹16,000 | 1,500 ₹3,000 | 9,000 ₹18,000 | 1,300 ₹2,600 Lowest |
Tender Value
₹5 L
EMD Value
₹20,000
Closing Date
19 Feb 2026, 6:00 pmClosed
GE AF THANE
Office of Military Engineer Services ,Garrison Engineer (AF) Thane, Kolshet Road, Sandoz Baugh Post, Thane 400607
COMPREHENSIVE MAINTENANCE OF AC PLANT S AT NIRALA BUILDING POCKET (B) SANTACRUZ AT AF STATION MUMBAI UNDER GE (AF)THANE (2ND CALL)
2025_MES_746358_2
GE (AF) T-54 OF 2025-26 (8570)
Open Tender
Miscellaneous Works
Item Rate
180 days
THANE
AS PER NIT
8 documents required · 8 mandatory
₹500
GE AF THANE
₹20,000
Yes
2 Apr 2026
7 Feb 2026
26 Feb 2026
7 Feb 2026
19 Feb 2026
14 Feb 2026
Supply and fix in repair cooling tower fan assembly with fan speed not exceeding 60m/s, out let air velocity not less than 610 m/min and noise level not exceeding 75 dB made out of propeller type light weight solid/ hollow FRP rust resistant with statically and dynamically balanced blades alongwith galvanised steel guard protection to protect fan and out side area suitable for upto 120 TR capacity AC plants, complete all as specified and directed by Engr-in-Charge.
Material and labour for taking out all old unserviceable PVC fills from cooling tower of capacity upto 100 TR and supply and fix in replacement of eliminator of cooling tower upto 100 TR, complete all as specified and directed by Engr-in-Charge.
Cleaning the cooling tower of capacity upto 100 TR by applying wire brush, washing powder and other solvent by removing the deposited impurities such as silt, dust particles mud/ sand inside the dome and around the fins, cleaning of base tray & grills, pot stainer, main shaft etc and other connected items, servicing of fan motor including changing of bearings and greasing refixing the fan, frill & top cover including testing commissioning after reassembling complete including painting all as directed by Engr-in-charge.
Supply and fix in repairs Sprinkler Assembly complete with Header Nozzles made out of Galvanised iron suitable to fix in cooling towers of upto 120TR and above Capacity AC plant, complete all as specified and directed by Engr-in-Charge.
Material and Labour for Charging of refrigerant gas R- 407C/ R134/R22 in sealed cylinder after making system leak proof, complete all as specified and directed by Engr-in-Charge. Note:-Refrigerant shall be issued to contractor for each AC plant from AGE E/M -II store yard. Transportation as well as loading/unloading of cylinder from AGE E/M store yard to AC plant is inclusive in the quoted rate.
Complete servicing of AHUs installed in Zone-IV AC plants, removing of air filters and refixing after cleaning with air blower and water with suitable cleaning agent , cleaning of cooling coil with wire brush ,air blower and water spraying pump with gun and mixing the chemical sittable for removing of scales on aluminium fins and straighten the fins of cooling coil by using suitable brush for capacity upto 10000 CFM as directed by Engr-in-Charge.
Material and Labour for repairs to condenser of AC plant up to 35 TR Capacity by blocking the damaged/corroded tubes with the following instructions :- (i) Disconnecting the side covers of the condenser from their existing positions. (ii) Leakage testing of the condenser using pressurised nitrogen gas and finding the leaked tubes. (iii) Blocking the damaged/leaked tubes by brass plugs. (iv) Re-fixing the side covers of the condenser and the condenser valves from their existing positions with new nuts, bolts, rubber gasket and washers etc and painting the surface with approved shade of synthetic enamel paints .
Supply and fix regenerable coarse type, dust proof AHU air filter for following sizes:-
AHU air filter of size 60cm x 60 cm x 5 cm.
AHU air filter of size 60cm x 50 cm x 5 cm
Dismantling and taking down defective parts of chiller/condenser pump set of capacity 7.5 to 10HP, replacement of defective parts like-bearing, bushes, impeller and shaft including lathe work and reassembling complete set including connecting and testing in presence of MES rep with entire satisfaction of Engr-in-Charge. Notes:- (i) bearing, bushes and impeller and shaft shall be measured and paid separately. (ii) Quoted rates are also deemed to be included for replacement of gaskets, packing with bearing grease, glands with graphite packing , nuts bolts , washers etc. (iii) Cost of transportation shall be deemed to be included in the rate quoted for these items. (iv) While taking out pump for repairs , the contractor will make arrangement plugging suction and discharge line with dead flanges, so that pumping of installation is not disturbed and there is no leakage of water.
Dismantling and taking down defective parts of chiller/condenser pump set of capacity 3 to 5 HP, replacement of defective parts like-bearing, bushes, impeller and shaft including lathe work and reassembling complete set including connecting and testing in presence of MES rep with entire satisfaction of Engr-in-Charge. Notes:- (i) bearing, bushes and impeller and shaft shall be measured and paid separately. (ii) Quoted rates are also deemed to be included for replacement of gaskets, packing with bearing grease, glands with graphite packing , nuts bolts, washers etc. (iii) Cost of transportation shall be deemed to be included in the rate quoted for these items. (iv) While taking out pump for repairs , the contractor will make arrangement plugging suction and discharge line with dead flanges, so that pumping of installation is not disturbed and there is no leakage of water.
Material and Labour for painting of motor & pump Capacity upto 7.5 HP for removing the existing deteriorated paint by scrapping the complete body along with complete foundation of Pump and Motor and filling the cavities with filter spray painting with Anti corrosive paint, two coats over a coat of red oxide zinc chrome and marking of SM/MES No. with black/white paint, complete all as specified and directed by Engr-in-Charge.
Material and Labour for rewinding of induction motor capacity upto 20 HP, 900RPM, 3 phase, 50 Hz, 415 volt of compressor motor and AHU Blower , chiller , condenser motor comprising of the following activities for induction motor of following capacities complete all as specified and directed as per manufacturer's instructions. :- Notes :- (i) Any adjustment in the pump set if required. The same shall also be carried out by the contractor without any extra cost. (ii) Any damage to the pump set occurs due to improper installation of motor, contractor shall be liable for repair.
Supply only electronic timer 800 SQA, working voltage 240V 50 Hz complete all as specified and directed by Engr-in-Charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TD8570.pdf
Tender Documents • 2.02 MB
BOQ_841973.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .