| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹9.9 L+₹23,951.45 (2.49%)Accepted-AOC | ₹9.9 L+₹23,951.45 (2.49%) | L2 | Accepted-AOC L1 |
| 2 | L1₹9.6 LRejected-AOC | ₹9.6 L | L1 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹39,000
Closing Date
4 Oct 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer, Provincial Division, PWD BandR Br., Palwal
Dismantling of Existing Building of ITI at Hathin in Palwal Distt.
2022_HRY_241002_1
PWD/Palwal/3825
Open Tender
Civil Works - Buildings
Works
30 days
Palwal
As per DNIT
2 documents required · 2 mandatory
₹500
₹39,000
Palwal
21 Oct 2022
27 Sept 2022
6 Oct 2022
27 Sept 2022
4 Oct 2022
27 Sept 2022
27 Sept 2022 - 4 Oct 2022
30 Sept 2022
Amount
Civil Works
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.(HSR 5.23.1) Nominal concrete 1: 1.5:3 or richer mix (i/c equivalent cum design mix)
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): (HSR 5.8.3)
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:(HSR 5.29.1) Door
Window
Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.(HSR 5.14)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (HSR 5.7.4) In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (HSR 5.2.2) In cement mortar
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Good Brick
Brick Bats
Steel
Window Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Anwar Ali, Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .