Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAdmitted-Finance UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | ₹6.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical WARD NO 10 15 51 JAIKALI ROAD DUBRAJPUR SONEPUR BAZARI BIRBHUM 731123 WEST BENGAL INDIA | DUBRAJPUR | BIRBHUM | WEST BENGAL | 731123 | - | - | Rejected-Technical TC recommendation |
| 3 | Rejected-Technical ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISE L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Arrangement of dismantling the drum pinion through proper support with the help of chain pulley block,brake system and wooden props, | 1 | EA | 12,190 ₹12,190 |
| 3.00 | Dismantling 2nos keys and opening the bolt and nuts for dis assembling 2 halves of the pinion. | 1 | EA | 8,499 ₹8,499 |
| 4.00 | 1" Halves & 2" Halves of the pinion taken out from wending drum. | 1 | EA | 17,500 ₹17,500 |
| 5.00 | Dismantling the main block of the drum shaft and taken out brass bush bearing with proper support arrangement | 1 | EA | 5,995 ₹5,995 |
| 6.00 | Carrying and shifting the pinion (2halves) inside the winding room for repairing | 1 | EA | 14,990 ₹14,990 |
| 7.00 | Drum shaft with pinion fold) opening the hydraulic jack | 1 | EA | 13,000 ₹13,000 |
| 8.00 | Drum pinion re assembling the 2 nos halves from haulage winding engine room outside for repairing special arrangement by iron structure for welding of the worn out portion of the pinion. | 1 | EA | 12,000 ₹12,000 |
| 9.00 | 2nd motion block rebuilding | 1 | EA | 6,000 ₹6,000 |
| 10.00 | Welding the bore of the drum pinion by special welding rod (L&T) make from 2244mm | 5 | KG | 8,995 ₹44,975 |
Tender Value
₹7.2 L
EMD Value
₹9,000
Closing Date
21 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete repairing and overhauling of 154 HP,550V,712 RPM Jhon Tinsley make Surface Haulage at Sankalp khani of Bankola colliery.
2026_ECL_356287_1
ECL/GM/BA/E TENDER/25-26/ENM/377 Dt 11.03.2026
Open Tender
Electrical and Maintenance Works
15 days
Bankola Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,000
24 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
11 Mar 2026 - 15 Mar 2026
Item Description/ Heading
Arrangement of dismantling the drum pinion through proper support with the help of chain pulley block,brake system and wooden props,
Dismantling 2nos keys and opening the bolt and nuts for dis assembling 2 halves of the pinion.
1" Halves & 2" Halves of the pinion taken out from wending drum.
Dismantling the main block of the drum shaft and taken out brass bush bearing with proper support arrangement
Carrying and shifting the pinion (2halves) inside the winding room for repairing
Drum shaft with pinion fold) opening the hydraulic jack
Drum pinion re assembling the 2 nos halves from haulage winding engine room outside for repairing special arrangement by iron structure for welding of the worn out portion of the pinion.
2nd motion block rebuilding
Welding the bore of the drum pinion by special welding rod (L&T) make from 2244mm
Drum pinion welding portion machining by bspecia;l arrangement site with the boring machine as per original profile.
pinion keyway making 2 nos by welding & grinding
New keyway making by EN-19 materials
After matching the pinion again dismantle from the structure & making 2 nos halves for carrying inside if winder room
Carring and shifting to pinion 2 nos halves to inside of the winding room
Placing the pinion halves in the winder drum by proper arrangement of support and safety
Worn out of the drum shaft welding by special welding rod and grinding for original size the shaft
setting and fitting the pinion in the shaft and fitted worn out and 2 nos of key with the shaft
pinion fitting pressing by hydraulic įack
Assembling the main drum shaft and fitted worn out and 2 nos of key with the shaft.
Finally setting the related components and adjust accordingly
Drum check dog clutch place-10 nos plongated hole nėw socket making pushing as per size require for proper size 10 nos.
socket fitting by welding both side by Cl rode & grinding finishing
Dog flange 10 nos socket hole oversize making with actual hole center.
Dog hex pole bore rebuilding as per shaft size &marching
Brass screw 1/2" x 2"
Shaft group lock clamp new making and fitting socket type 2 hubs
Drum collar place plate
block stud new making 3/4" x 51/2" long -8 nos
Oxygen Cylinder
Different size nut bolt washer
Dismentling of completev break both side
complete cleaning of brake
Dismentling of break plate with Glazing welding Rod both side
Making of new high carbon bush material & heat treated
Pin with material forged heat treatment and machining
Making of completete brake shoe for 2pair
Fitting charge for CSK copper rivet for brake shoe
Charger for grinding finishing & alignment etc.
Bed plate cracked portion grinding for preparation of repairing
Damage portion of bedplate gruging by electrode 21.03 ESAB make
Cost of Electrode for badse layer welding std make 27
Cost of Electrode for final laying welding by
Cost of steel Electrode for plate welding ESAB make durochrome 4mm
Industrial DA
Oxygen Cylinder
Transportation
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_369128.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid