Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | -3.55% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹10.6 L (2.64%)Admitted-Finance R O FIRDOUS COLONY BUCHPORA SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | -1.00% | ₹4.1 Cr+₹10.6 L (2.64%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹8.3 L
Closing Date
3 Aug 2026, 4:00 pmClosed
Executive Engineer
R and B Division Karan Nagar Srinagar
Restoration of Heritage Building of Kashapa Karanagar
2026_PWDJK_316206_1
etendering NIT No. 21 Karan Nagar Sgr
Open Tender
Civil Works
Percentage
540 days
Karan Nagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,500
Executive Engineer
₹8.3 L
Office of the Superintending Engineer
29 Aug 2026
15 Jul 2026
4 Aug 2026
16 Jul 2026
3 Aug 2026
18 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 2 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of G.S. Sheet | 604.09 | Sqm | 125.35 | ₹75,722.68 |
| 3 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead Of sectional area 40 sqcm. and above. | 18.59 | Cum | 3,488.65 | ₹64,854 |
| 4 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead Of area beyond 3 sqm | 45 | No | 390.5 | ₹17,572.5 |
| 5Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | |||||
| 5.01 | In mud mortar | 85.69 | Cum | 499.2 | ₹42,776.45 |
| 5.02 | In cement mortar | 17.74 | Cum | 1,458.45 | ₹25,872.9 |
| 6 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 34.64 | Cum | 2,516.85 | ₹87,183.68 |
| 7 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) | 224.64 | Cum | 1,725.2 | ₹3,87,548.93 |
| 8 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In lime mortar | 72.39 | Cum | 820.4 | ₹59,388.76 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_1029954.xls
BOQ • 0.49 MB
CorrigendiumNIT21.pdf
PDF • 0.40 MB
Extension_NIT21.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .