Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC Tender Accepted. | |
| 2 | L2₹3.4 L+₹28,261.88 (9.09%)Rejected-AOC TUTICORIN | L2 | Rejected-AOC Tender not Accepted. |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
1 Apr 2024, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
Annual maintenance of BFP 5A 5B and 5C motor coolers and CEP 5A Motor and Capital Overhauling of Boiler Feed pump motor 5A 32275 A 401 01 6 and Condensate extraction pump Motor 5B SI No 32263 A 404 01 2 during Annual Overhauling for the year 2024 202
2024_EB_449509_1
CE/SE/ES /TTPS /No.64/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹3,200
Yes
8 Jun 2024
16 Mar 2024
2 Apr 2024
16 Mar 2024
1 Apr 2024
16 Mar 2024
Overhauling of the BFP coolers : Charges for removing the cooler pipe line and cooler from the motor. Dismantling the cooler cover, cleaning the cooler tubes by wire brush, air and with water. Changing the gaskets and reassembling it, checking the cooler tubes for leak, hydraulic testing of cooler with 4 Kgf / cm2 pressure for six hour duration and reerecting the cooler. Checking the motor terminal tightness and taking IR value and PI value. (Including cost of high grade nitrile rubber gasket and Anti corrosive paint
Charges for removal and refixing of floor grills at 15.5 mt level for lifting and re-erecting the coolers in the HT Motors : Removal of floor M.S. grills at 15.5 mt level by EOT Crane after providing adequate barricades for safety measure to lift coolers from the motors and refixing the M.S.grills in position. After completion of work, Removal of M.S.grills by EOT crane at 15.5 mt level after providing adequate barricades for safety measure to reerect the coolers in their motors and refixing the floor M.S.grill in its position. (Including Cost of Consumables and hire charges for T&P etc.)
Charges for carrying out an capital maintenance works in Boiler Feed Pump Motors 4B ( 32275-A-401-01-5) & 4C ( 32275-A-401-01-7) “Disconnection of Power cables at Phase & Neutral side, space heater cable” in Boiler Feed Pump motor
Removal of foundation bolts, Lifting the motor to a convenient location.
Replacement of CT and terminal box (Replacement of CT/PT in LT module and LT Breaker panel) : Charges for releasing the 3 Nos of 500/1 amp C.T, dismantling of phase & neutral side terminal boxes, dismantling of spare heater terminal box and other dummies from the released motor. Refixing the terminal boxes, dummies in the spare overhauled motor. Reassembling of 3 Nos 500/1 amp. Current transformers etc. in the spare motor (Spare Motor (Sl.No:32275-A-401-01-2).
Lifting and Erection of the motor back on its bed after cleaning and checking healthiness of pedestal insulation.
Removal of end covers and measuring the air gap and magnetic axis.
Overhaul of stator :Inspection and cleaning and checking of stator windings, fastening of the stator winding to the end ring and also the inter coil spacers and packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta. Packing in the overhang portion of the windings, tightening the wedges, spraying one coat of Dr.Beck protective enamel varnish, Drying out the stator, preheating, Checking the IR value, DC resistance and Tan delta.
Overhaul of Rotor : Inspection and cleaning of released rotor, checking the position of stampings, cleaning of corroded parts, inspection of winding bars, cleaning of overheated and burnt places, applying one coat of Dr.Beck’s insulating varnish and drying out.
Reassembling the motor complete : Assembling the end covers, checking air gap and magnetic axis.
Charges for Measurement of IR value & PI value in spare BFP Motor (210 MW generator stator), assisting MRT for testing, and Improving the IR value by flood light if necessary.
“Termination of Power cables at phase & neutral side, space heater cable” in Boiler Feed Pump motor.
Tightening the bed bolts, foundation bolts, Checking the IR value, DC resistance and trial run the motor in decouple/couple condition running the motor satisfactorily.
Boiler Feed Pump Motors (5B &5C) and Coolers scraping, cleaning and painting with two coats of enamel paint. (Including Cost of enamel paint and consumables.)
Annual maintenance works in Condensate Extraction Pump motor 5B 9SI.no.32263-A-404-01-1) Overhauling of the cooler tubes: Checking and cleaning of cooler tubes.
Charges for carrying out an capital maintenance works in Condensate Extraction Pump Motor 5B (SI.No.32263-A-404-01-2) Dismantling of the motor: “ Disconnection of Power cables at Phase & Neutral side, space heater cable ” in CEP motor.
Removal of foundation bolts, lifting the motor to a convenient location.
Dismantling of motor pulley, cooler, end covers and Threading out the rotor.
Overhauling of the stator: Labour charges for inspection and cleaning of stator and winding of stator, fastening of the winding to the end ring and also the inter coil spacers and packing in the overhang portion of the winding, tightening of the wedges, spraying one coat of Dr.Beck’s protective enamel and drying out, Stator preheating, checking the IR value and DC Resistance.
Overhauling of the rotor: Labour Charges for inspection and cleaning of rotor, checking the position of stampings, cleaning of the corroded parts, Inspection of winding bars, soldered end winding, cleaning of overheated burnt places and applying two coats of Dr.Becks protective enamel and drying out.
Overhauling of the cooler tubes : Checking and cleaning of cooler tubes.
Cleaning, checking, reassembling / replacing the bearing : Releasing the bearing, cleaning, checking, reassembling /replacing the bearing on both ends lubrication etc. (Bearings supplied by TANGEDCO)
Reassembling the motors complete : Assembling of motor after threading in the rotor, fixing end covers, providing rubber gasket and fixing of cooler unit, Checking the IR value, DC resistance and Tan delta
Lifting of motor, placing at motor bed and tightening of foundation bolts, bed bolts etc
“Termination of Power cables at phase & neutral side, space heater cable” and checking trial run.
Condensate Extraction Pump Motors and Coolers scraping, cleaning and painting with two coats of enamel paint. (Including Cost of enamel paint and consumable.)
BLUE MOUNTAIN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .