| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.4 LAccepted-AOC GROUND FLOOR SHIVSHANKAR NAGAR WADALA TOOK TERMINAL ROAD S P ROAD WADALA WEST MUMBAI 400 037 | MUMBAI | MUMBAI | MAHARASHTRA | 400037 | ₹63.4 L Quoted ₹63.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹69.7 L+₹5.7 L (8.93%)Rejected-AOC | ₹69.7 L+₹5.7 L (8.93%) | L2 | Rejected-AOC L2 |
| 3 | L3₹69.7 L+₹5.8 L (9.01%)Rejected-AOC D 101 THE HILLAGE SATHE VASTI LOHAGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹69.7 L+₹5.8 L (9.01%) | L3 | Rejected-AOC L3 |
| 4 | L4₹70.3 L+₹6.4 L (9.96%)Rejected-AOC 39 177 PMC COLONY JANWADI PUNE PUNE MAHARASHTRA INDIA 411016 | PUNE | MAHARASHTRA | 411016 | ₹70.3 L+₹6.4 L (9.96%) | L4 | Rejected-AOC L4 |
| 5 | L5₹70.9 L+₹6.9 L (10.8%)Rejected-AOC S NO 46 KONDHAVA PUNE 48 PUNE MAHARASHTRA INDIA 411048 | PUNE | MAHARASHTRA | 411048 | ₹70.9 L+₹6.9 L (10.8%) | L5 | Rejected-AOC L5 |
Tender Value
₹82.3 L
EMD Value
₹83,000
Closing Date
6 Apr 2026, 3:00 pmClosed
Registrar, SPPU
Registrar office, SPPU
Dismantling of existing flooring, brick work, removing brickbat coba etc,Providing Brick Masonry,Waterproofing work,Plastering workd,Flooring work,Painting work,Roofing and Ceiling work and Miscellaneous work.
2026_UOFP_1288458_1
C.A.No.2025-26/SPPU/ ESTATE/EE/CIVIL/12
Open Tender
Civil Works
Percentage
270 days
campus of SPPU
i)Single Building Work/ Building Maintenance work costing not less than 21 lakhs ii)Avg. annual turnover not less than 83 lakhs for last three financial years in all classes of civil Engineering Work (i.e. 22-23, 23-24, 24-25)
7 documents required · 7 mandatory
₹3,000
₹83,000
9 Sept 2026
20 Mar 2026
7 Apr 2026
20 Mar 2026
6 Apr 2026
20 Mar 2026
20 Mar 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. Fifth Floor | |||||
| 2Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. Fifth Floor | |||||
| 3Dismantling the R.C.C. Work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. Fifth Floor | |||||
| 4Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. i) Third Floor | |||||
| 5ii) Fourth Floor | |||||
| 6iii) Fifth Floor | |||||
| 7Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete. Fifth Floor | |||||
| 8Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete. Fifth Floor | |||||
| 9Providing and laying Cast in situ/Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade). Fifth Floor | |||||
| 10Providing and laying Cast in situ/Ready Mix cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for R.C.C.coping to plinth or parapet and sill of doors and windows moulded as per detailed drawings or chamfered as approved by the Engineer including steel centering, formwork, cover blocks, laying/pumping, compacting , curing , finishing and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade). Fifth Floor | |||||
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
tender_Cap.pdf
Tender Documents • 6.54 MB
BOQ_2215272.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .