| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹55.5 L+₹12.2 L (28.2%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹57.9 L+₹14.6 L (33.9%)Rejected-Finance | L3 | Rejected-Finance Not L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Unenlisted firm and not meeting the eligibilty |
Tender Value
₹39.5 L
EMD Value
₹79,000
Closing Date
14 Aug 2021, 6:00 pmClosed
CWE (ARMY) SECUNDERABAD
CWE (ARMY) MUDFORT COMPLEX, SECUNDERABAD- 500003
PROVISION OF 02 X TOILET BLOCKS AT ASC BN AND 01 X SANITARY BLOCK AT EME BN UNDER GE (SOUTH) SECUNDERABAD
2021_MES_446713_2
CWE(S)/SOUTH/TOKEN-09 OF 2021-2022
Open Tender
Civil Works
Lump-sum
270 days
Secunderabad
As per NIT
7 documents required · 7 mandatory
₹500
GE (South) Secunderabad
₹79,000
Yes
16 Oct 2021
10 Jul 2021
21 Aug 2021
10 Jul 2021
14 Aug 2021
24 Jul 2021
Amount
Schedule 'A' Part I This Schedule is not pre-priced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Col 7.
Lump sum price worked out by the tenderer for "Construction of toilet block (containing 16 x WC, 02 x WHB, 04 x urinal and 02 x bath room) of ‘A’ COY living area of 554 ASC Bn in single storey with RCC framed structure complete all as shown on drawings and as specified " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the tenderer for "Construction of toilet block (containing 16 x WC, 02 x WHB, 04 x urinal and 02 x bath room) of ‘B’ COY living area of 554 ASC Bn in single storey with RCC framed structure complete all as shown on drawings and as specified " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the tenderer for "Construction of sanitary block of 654 EME Bn in single storey with RCC framed structure complete all as shown on drawings and as specified " NOTE:- The lumpsum price to be quoted by the Contractor.
Lump sum price worked out by the Contractor for “SITE CLEARANCE" as listed in Schedule ‘A’ Part-II Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.22,410.40 inserted by the MES in Schedule ‘A’ Part-II
Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-III Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 1,59,165.40 inserted by the MES in Schedule ‘A’ Part-III
Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLYL” as listed in Schedule ‘A’ Part-IV Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs. 1,19,824.51 inserted by the MES in Schedule ‘A’ Part-IV
Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIFICATION” as listed in Schedule ‘A’ Part-V Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs 1,21,575.19 inserted by the MES in Schedule ‘A’ Part-V
Lump sum price worked out by the Contractor for “EXTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part-VI Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.1,67,888.52 inserted by the MES in Schedule ‘A’ Part-VI
Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL ” as listed in Schedule ‘A’ Part- VII Representing ** _______ % ____________ percent *Above / Below the lump sum price of Rs.1,42,766.11 inserted by the MES in Schedule ‘A’ Part- VII
Schedule 'A' Part VIII (MISCELLANEOUS) This Schedule is not prepriced by MES and the prepriced rate has not been indicated in column No 5 and shall be treated as Rs 0.00 indicates this fact only.The tenderer is required to quote their rates in Column 7. This Schedule consists of items Serially numbered as 8.01 to 8.11
Rate for item No. 1 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 2 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 3 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 4 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No.5 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 6 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 7 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No.8 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 9 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 10 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
Rate for item No. 11 as listed in Schedule 'A' Part -VIII (MISCELLANEOUS)
BEEGEE DESIGN SYSTEMS
Srinivasa Consructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .