| Sl No | Description | Qty | Unit | M/s. Jaichand Lal Singhi L2 | BIJAY BUCHA L1 |
|---|---|---|---|---|---|
| 1.00 | 1. Kathalguri to Wirwar via Parkup Pahar (Priloo to Nornocho), L=3.00 Km
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
i) By Manual Means
(A) In area of non thorny jungle | 0.9 | Hact. | 53,000 ₹47,700 Lowest | 53,000 ₹47,700 Lowest |
| 2.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000
m as per Technical Specification Clause 302.3 | 5,116.9 | Cum | 70 ₹3,58,183 | 68 ₹3,47,949.2 Lowest |
| 3.00 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5 | 4,093.52 | Cum | 205 ₹8,39,171.6 | 203 ₹8,30,984.56 Lowest |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 as per Technical Specification Clause 301.5
i) Private Land | 1,586.1 | Cum | 260 ₹4,12,386 Lowest | 260 ₹4,12,386 Lowest |
| 5.00 | Construction of subgrade and earthen shoulders with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
i) Private Land | 4,701.77 | Cum | 340 ₹15,98,601.8 Lowest | 340 ₹15,98,601.8 Lowest |
| 6.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
(ii) For Grading II Material | 1,687.5 | Cum | 2,500 ₹42,18,750 | 2,220 ₹37,46,250 Lowest |
| 7.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
(A) By Manual Means | 843.75 | Cum | 3,800 ₹32,06,250 | 3,500 ₹29,53,125 Lowest |
| 8.00 | Inter locking concrete Block pavement
(A) Interlocking pavement block
(i) Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.
a) Including Edge block/ Edge restraints | 11,250 | Sqm | 1,160 ₹1,30,50,000 | 1,153 ₹1,29,71,250 Lowest |
| 9.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
II) Ordinary Soil
Upto 3 m depth | 687.54 | Cum | 127 ₹87,317.58 Lowest | 128 ₹88,005.12 |
| 10.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
A With crushed Stone
I. P.C.C grade M10
Nominal mix 1:3.6 (Hand mixing) | 20.43 | Cum | 6,080 ₹1,24,214.4 Lowest | 6,100 ₹1,24,623 |
Tender Value
₹3.9 Cr
EMD Value
₹7.7 L
Closing Date
8 Sept 2025, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
MMPPNA_RIDF_XXXI_25_26_365 Construction of Road from (1)Kathalguri to Wirwar via Parkup Pahar (Priloo to Nornocho),(2)Improvement of road from Kathalguri to Wirwar via Parkup Pahar (From 6.00 km to 8.00km), L-2.00 Km under Mukhya Mantrir Paki Path N
2025_PWD_46685_24
CE/DEV/TB/60/2025-26/13 Dtd- 31.07.2025
Open Tender
Civil Works – Roads
Item Rate
365 days
Karbi Anglong
Please refer Tender Documents
5 documents required · 5 mandatory
₹7,700
₹7.7 L
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
31 Jul 2026
21 Aug 2025
9 Sept 2025
21 Aug 2025
8 Sept 2025
22 Aug 2025
21 Aug 2025 - 8 Sept 2025
21 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Kathalguri to Wirwar via Parkup Pahar (Priloo to Nornocho), L=3.00 Km
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
i) By Manual Means
(A) In area of non thorny jungle | - | Hact. | 52,995.08 | - |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000
m as per Technical Specification Clause 302.3 | 1 | Cum | 67.8 | ₹67.73 |
| 3 | Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5 | 1 | Cum | 202.72 | ₹202.52 |
| 4 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.50 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.1 and 300.2 as per Technical Specification Clause 301.5
i) Private Land | 1 | Cum | 258.21 | ₹257.95 |
| 5 | Construction of subgrade and earthen shoulders with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
i) Private Land | - | Cum | 339.68 | - |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
(ii) For Grading II Material | - | Cum | 1,767.32 | - |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
(A) By Manual Means | - | Cum | 3,240.61 | - |
| 8 | Inter locking concrete Block pavement
(A) Interlocking pavement block
(i) Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage.
a) Including Edge block/ Edge restraints | - | Sqm | 1,161.08 | - |
| 9 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
II) Ordinary Soil
Upto 3 m depth | 1 | Cum | 127.69 | ₹127.56 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
A With crushed Stone
I. P.C.C grade M10
Nominal mix 1:3.6 (Hand mixing) | 1 | Cum | 6,078.04 | ₹6,071.96 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 11.28 MB
Tendernotice_1.pdf
PDF • 5.37 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_74488.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .