Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹18.9 L
EMD Value
₹19,000
Closing Date
30 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE(CIVIL)
CIVIL WORKS CIRCLE,OPTCL,BBSR
CONSTRUCTION OF COMPOUND WALL WITH CONCERTINA COIL FENCING ALONG EAST and NORTH SIDE AT CONSTRUCTION STORE SITE ADJACENT TO EHT STORE SUB - DIVISION,
2026_OPTCL_146078_2
ETCN 07 of 26-27
Open Tender
Civil Works - Others
Percentage
120 days
MANCHESWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SE(CIVIL),CIVIL WORKS CIRCLE,OPTCL
₹19,000
Yes
16 Nov 2026
16 Nov 2026
4 Dec 2026
16 Nov 2026
30 Nov 2026
16 Nov 2026
16 Nov 2026 - 23 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement. of approved quality and dimensionincluding cost, conveyance royalities and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in Chage. | 836.1 | Sqm | 0.19 | ₹158.86 |
| 2 | Supplying all labour for dismantling brick or stone masonry including stacking of useful material for reuse and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 6.37 | cum | 1,646.62 | ₹10,488.97 |
| 3 | Supplying all labour for removal of cement plaster including racking out joints 12 mm deep and removal of debris within 50m initial lead including cost,conveyance,royalties & taxes of all labour with T & P required etc complete as per direction of Engineer in charge | 179.01 | Sqm | 58.95 | ₹10,552.64 |
| 4 | Earthwork in excavation in hard soil or gravelly soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceedng 0.3 m in depth on foundation trenches including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring and shuttering , dewatering if required etc complete including cost,conveyance,taxes of all labour with T&P required etc complete as per the direction of the Engineer in charge. | 52.76 | Cum | 282.88 | ₹14,924.75 |
| 5 | Supplying all labour with T&P for filling foundation and plinth with sand including watering, ramming etc comolete including cost , conveyance , royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete (measurement will be taken on finished & complete section only) as per the direction of the Engineer in charge. | 18.56 | Cum | 526.05 | ₹9,763.49 |
| 6 | Cement concrete with (1:3:6) in foundation and floors using 40 mm ( 1 ½ ‘’) size black hard crusher broken granite stone metal of approved quality from approved quarry including lower laying concrete watering and curing etc complete to required level laid in layers not exceeding 150 mm ( 6’’) thick including cost, conveyance, royalties and taxes of all materials and cost , conveyance of all labour with T&P required for the work etc complete in all respects as per the direction of the Engineer in charge. | 13.63 | Cum | 6,123.71 | ₹83,466.17 |
| 7 | RCC (1:1.5:3) M20 grade in Foundation and Plinth, footings, bases of columns, mass concrete, precast slabs etc having a minimum compressive strength 20 N/mm2 ( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 using 12 mm to 20 mm size hard black crusher broken granite stone chips (20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days excluding centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in - charge. | 17.87 | cum | 6,253.32 | ₹1,11,746.83 |
| 8 | RCC M20 grade in Column and Beam having a minimum compressive strength 20 N/mm2 ( in work test of 200 Kg per CM2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S.516 using 12 mm to 20 mm size hard black crusher broken granite stone chips (20 mm size not to exceed 25% ) including hoisting, lowering, laying compacting concrete by using concrete mixer vibrators and similar equipments and tools and plants with watering and curing for 28 days excluding centering, shuttering and finishing the exposed surfaces smooth providing grooves or beads where necessary including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc complete in all respects but excluding the cost of M.S. rods or tor steel and binding wires and labour charges for cutting, bending, binding and tying the grills etc complete as per the direction of the Engineer - in - charge. | 14.97 | cum | 6,253.32 | ₹93,612.2 |
| 9 | Providing and Supplying all labour and T&P for Regid and smooth centering and shuttering below RCC Foundation including suppying of planks, bullah, nail, rop and old other materials required for the work etc complete and dismentaling them after completion of work including cost, conveyance, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respects as per the direction of the Engineer-in-charge. | 124.81 | Sqm | 249.83 | ₹31,181.28 |
| 10 | Providing and Supplying all labour and T&P for Regid and smooth centering and shuttering below RCC Column including suppying of planks, bullah, nail, rop and old other materials required for the work etc complete and dismentaling them after completion of work including cost, conveyance, taxes of all materials and cost conveyance of all labour with T&P, equipments and accessories and provision for all arrangements required for the works etc. complete in all respects as per the direction of the Engineer-in-charge. | 82.13 | Sqm | 1,219.7 | ₹1,00,173.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.43 MB
Tendernotice_3.pdf
PDF • 4.50 MB
Tendernotice_4.pdf
PDF • 1.16 MB
Tendernotice_5.pdf
PDF • 1.31 MB
BOQ_620719.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .