Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62,460Admitted-Finance AT PO KEDAR DAS NAGAR CHAS BOKARO NEAR GURUDWAR ROAD JHARKHAND DIST BOKARO 827013 | BOKARO | BOKARO | JHARKHAND | 827013 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pragati instrumentation private limited L1 |
|---|---|---|---|---|
| 1.01 | AMC of 50 Te electronic road weighbridge, which include following terms and conditions:
1. Maintenance of weighbridge software with all installed feature as on date including log in security for data safety.
2. Service engineer should visit the weighbridge once in fifteen days irrespective of breakdown.
3. In case of any break down service engineer should reach the site within 12 hours after receiving information in any form telephonic, mail, fax and writing.
4. All travelling allowance and other expenses will be carried out by the party during the contract period.
5. AMC holder/ service engineer must be present at the time of verification/ stamping of the weighbridge by inspector legal metrology.
6. After breakdown the fault should be rectified within 24 hours of receipt of complain. Penalty shall be applicable after 24 hours of breakdown.
7. The penalty for non-rectification of the weighbridge shall be calculated as: (No of days the weighbridge remains out of order X AMC rate X 2 times)/ 365 days
Weighbridge: 01 nos
Years: 01 | 1 | job | 62,460 ₹62,460 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹67,619
Closing Date
5 Aug 2025, 9:00 amClosed
PE ENM AADOCM
Office of PE Enm AADOCM
Annual Maintenance Contract for one number 50 Ton Road Weighbridges (RD1608) at AADOCM Dhori Area.
2025_CCL_340102_1
AADOCM/ENM/25-26/7
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
AADOCM
Please Refer tender document
2 documents required · 2 mandatory
23 Aug 2025
23 Jul 2025
6 Aug 2025
23 Jul 2025
5 Aug 2025
23 Jul 2025
23 Jul 2025 - 1 Aug 2025
Amount
AMC of 50 Te electronic road weighbridge, which include following terms and conditions: 1. Maintenance of weighbridge software with all installed feature as on date including log in security for data safety. 2. Service engineer should visit the weighbridge once in fifteen days irrespective of breakdown. 3. In case of any break down service engineer should reach the site within 12 hours after receiving information in any form telephonic, mail, fax and writing. 4. All travelling allowance and other expenses will be carried out by the party during the contract period. 5. AMC holder/ service engineer must be present at the time of verification/ stamping of the weighbridge by inspector legal metrology. 6. After breakdown the fault should be rectified within 24 hours of receipt of complain. Penalty shall be applicable after 24 hours of breakdown. 7. The penalty for non-rectification of the weighbridge shall be calculated as: (No of days the weighbridge remains out of order X AMC rate X 2 times)/ 365 days Weighbridge: 01 nos Years: 01
Total impact of GST for the purpose of CTC
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .