| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC MALIPADA HIRAKUD 768016 | HIRAKUD | SAMBALPUR | ODISHA | 768016 | ₹12.8 L | L1 | Accepted-AOC Lottery winner |
| 2 | L1₹12.8 LRejected-AOC | ₹12.8 L | L1 | Rejected-AOC Not selected through lottery |
| 3 | L1₹12.8 LRejected-AOC | ₹12.8 L | L1 | Rejected-AOC Not selected through lottery |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical C O SARAT KUMAR PANDA DAILY MARKET BURLA SAMBALPUR 768017 | BURLA | SAMBALPUR | ODISHA | 768017 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.8 L
EMD Value
₹12,800
Closing Date
23 Feb 2026, 3:00 pmClosed
Unit Head,HHEP,Burla
O/O Sr. GM(El),HHEP,Burla
Back side grill extension of 05 Nos. of F type quarters of HHEP, Burla
2026_OHPCL_125726_1
HHEP-09/2026(Sl.No.-1)
Open Tender
Civil Works - Buildings
Percentage
60 days
Burla
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹12,800
Yes
13 May 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
9 Feb 2026 - 19 Feb 2026
Dismantling and removing brick of stone masonry in cement mortar including stacking the useful materials for reuse and removing the debris away from work site with all leads and lifts as per direction of Engineer-in-charge
Dismantling and removing 2.5cm thick artificial stone flooring including stacking the useful materials for reuse and removing the debris away from work site with all leads and lifts as per direction of engineer-in-charge
Earth work excavation in ordinary soil in embankments, roads etc within 50 mtrs initial lead and 1.5 mtrs initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtr in depth alongwith proper compaction by PRR including hire and running charges of PRR including mechanical carriage of 5 Km and as per direction of Engineer-in-charge
Supply and filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty, all other taxes and labour charges etc complete
Cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc complete
RCC work of 1:1.5:3 with 12mm and down grade black hard granite chips (crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of tor steel) and cost of all labour with T&P required as per direction of Engineer-in-charge
Cutting, bending, binding and laying the grill of approved dia and placing in position of tor steel (IS 7686-2000) for RCC works and using binding wire 18 to 20 gauge including cost, conveyance, taxes of all materials and labour complete as per direction of Engineer-in-charge
Rigid and smooth cantering and shuttering for RCC works including false works and dismantling them after casting including cost of material complete for foundation, plinth band and footings, bases of columns, mass concrete, precast slabs
Cement concrete (1:2:4) with 12mm size hard granite chips including the cost, conveyance, royalty, all other taxes and labour charges etc complete
Fly ash brick masonry in cement mortar (1:4) using fly ash brick having crushing strength not less than 75 Kg/cm2 with dimensional tolerance of +/-% after immersing the bricks in water for six hours before using foundation and plinth including hoisting, placing in position, watering, curing to required time etc including cost, conveyance, royalties and taxes of all materials and cost of all labour with T&P required for the work etc complete as per direction of Engineer-in-charge
20mm thick cement plaster (1:4) in finished smooth to inside / outside rough surface of walls after racking out the joints including watering curing to required time, cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete etc as per direction of Engineer-in-charge
Priming one coat with any approved primer (water based) on plastered surface after cleaning the surface, sand papering etc including cost, conveyance, royalties, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge
Wall painting two coats with weather seal coat paint of any approved shade over the exterior surface of walls including cost, conveyance, taxes of all materials, costs of labour with T&P required for the work complete as per direction of Engineer-in-charge
Finishing wall surface with acrylic wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding sagging charges with cost of all materials, taxes, labour T&P etc complete
Wall painting two coat with plastic emulsion paint of any approved shade over the interior surface of walls including cost, conveyance, royalties, taxes of all materials, cost of labour with T&P required for the work complete as per direction of Engineer-in-charge
Iron works wrought and put up in grated doors, windows and cage latrines including welding etc complete
Labour for fitting and fixing of MS gates / wooden with frame as per approved design including cost of all materials complete but excluding cost of MS gates / wooden door with frame and fittings
Iron work wrought and put up in trusses and record racks including all cost of labour, T&P etc complete as per specification and direction of Engineer-in-charge
Hoisting joists and trusses and placing in position (Labour only)
Providing and fixing GCI (0.5mm) sheet in roof drilling hole in wind ties including fixing of ridges, valleys, wind ties etc excluding cost of fitting
Priming one coat with any approved primer on iron work after cleaning the surface, sand papering etc including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge
Painting two coats any approved shade of paint on new iron work after cleaning the surface, sand papering etc including cost, conveyance, royalties, taxes of all materials, cost of all labour with T&P required for the work complete as per direction of Engineer-in-charge
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
DTCN0920261.pdf
Tender Documents • 1.77 MB
officememorandum.pdf
Additional Documents • 0.57 MB
Procedureforonlinepayment.pdf
Additional Documents • 1.46 MB
OfficememorandumAPS.pdf
Additional Documents • 1.18 MB
BOQ_580180.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .