Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 1ST FLOOR SAI COMPLEX BESIDES ADITYA VIP ENCLAVE NEAR GANESH MANDAP CHHAK JHARPADA BHUBANEWAR 751006 | KHORDHA | ODISHA | 751006 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
21 Sept 2026, 5:00 pmClosed
CCE Khordha RandB Circle Khordha
O/o the Chief Construction Engineer Khordha R and B Circle Khordha
Construction of Girls Hostel (Ground Floor), Boys Hostel (1st Floor) (Gplus1) at Inside Campus of DIET at Khordha for the year 2026-27.
2026_EICCL_139929_1
CCE-Khordha R and B Circle-6-26-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Khordha
3 documents required · 3 mandatory
₹10,000
₹2.3 L
Yes
22 Sept 2026
2 Sept 2026
22 Sept 2026
2 Sept 2026
21 Sept 2026
2 Sept 2026
2 Sept 2026 - 21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
A/R-P 1/item No.2(a)-Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge.
Girls Hostel(Ground floor) | 102.79 | cum | 282.88 | ₹29,077.24 |
| 2 | Filling foundation & Plinth with excavated materials well watered & rammed etc. complete
Girls Hostel(Ground floor) | 102.79 | cum | 157.16 | ₹16,154.48 |
| 3 | Supplying, filling in foundation & plinth with sand in layers including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with T&P required for the work etc. complete
Girls Hostel(Ground floor) | 85.5 | cum | 935.42 | ₹79,978.41 |
| 4 | Providing & applying Post constrution of Antitermite treatment by drilling 12 mm dia holes at a distance of 30cm@ junction of wall and floor about 300mm apart deep enough to each the soil below and chemical emulsion(PREMISE,IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with475 ltr water) pumped these holes to soak the soil @1Ltr solution of each holea as per manufactures specification and the holes should be pluged with filling materials including cost of all materials,labour charges,conveyance and all taxes and hiring charges of machinaries as per direction of Engineer in charges
Girls Hostel(Ground floor) | 145.24 | sqm | 104.5 | ₹15,177.58 |
| 5 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge.
Girls Hostel(Ground floor) | 26.48 | cum | 6,108.9 | ₹1,61,763.67 |
| 6 | Plain Cement concrete M20 grade using 20mm down graded size h.g chips including cost of all materials etc complete.
Girls Hostel(Ground floor) | 3 | cum | 6,133.33 | ₹18,399.99 |
| 7 | Plain Cement concrete M20 grade using 20mm down graded size h.g chips including cost of all materials etc complete. Boys Hostel (First floor) | 7.43 | cum | 6,258.13 | ₹46,497.91 |
| 8 | Brick work with Flyash bricks 25 Cm. x 12 Cm. x 8 cm having crushing strength not less than 75 Kg/cm2 with dimensional tolerance + 2 percent in cement mortar (1:6) in foundation & plinth. Girls Hostel(Ground floor) | 11.58 | cum | 5,782.1 | ₹66,956.72 |
| 9 | Brick work with Flyash bricks 25 Cm. x 12 Cm. x 8 cm having crushing strength not less than 75 Kg/cm2 with dimensional tolerance + 2 percent in cement mortar (1:6) in Super-Structure. Girls Hostel(Ground floor) | 43.26 | cum | 5,815.43 | ₹2,51,575.5 |
| 10 | Brick work with Flyash bricks 25 Cm. x 12 Cm. x 8 cm having crushing strength not less than 75 Kg/cm2 with dimensional tolerance + 2 percent in cement mortar (1:6) in Super-Structure. Boys Hostel (First floor) | 235.91 | cum | 6,201.41 | ₹14,62,974.63 |
stage.html
html • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.12 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_607853.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .